| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 CrAccepted-AOC OFFICE NO 206 D WING EXTENSION RAIKER CHEMBER DEONAR VILLAGE ROAD GOVANDI EAST MUMBAI 88 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400088 | ₹4.0 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹4.3 Cr+₹28.2 L (7.09%)Rejected-Finance 00 BARGO BARGO SENDULI BENDULI GORAKHPUR UTTAR PRADESH 273016 | GORAKHPUR | UTTAR PRADESH | 273016 | ₹4.3 Cr+₹28.2 L (7.09%) | L2 | Rejected-Finance Being L2 |
| 3 | L3₹4.3 Cr+₹32.1 L (8.07%)Rejected-Finance ROMA BANJARA TANDA CHS BUILDING NO 1 ROOM NO 506 MANKHURD W MUMBAI 400 043 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400043 | ₹4.3 Cr+₹32.1 L (8.07%) | L3 | Rejected-Finance Being L3 |
| 4 | L4₹4.3 Cr+₹32.8 L (8.25%)Rejected-Finance | ₹4.3 Cr+₹32.8 L (8.25%) | L4 | Rejected-Finance Being L4 |
| Sl No | Description | Qty | Unit | vikas construction L4 | SUNIL CONSTRUCTION L3 | Arathi Electricals L1 | MARUTI ENTERPRISES L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | PART-A:CivilWorks:
Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of rank vegetation, grass, brush wood etc. complete and as directed by the Engineer-in-charge . From 0.00 to 1.50 m depth from Average Ground Level | 50 | CuM | 400 ₹20,000 Lowest | 450 ₹22,500 | 900 ₹45,000 | 425 ₹21,250 |
| 2.00Lead charges for 1st 1 KM or part thereof, by mechanical transport including loading unloading, stacking / levelling etc. | |||||||
| 2.10 | Soil | 25 | CuM | 400 ₹10,000 Lowest | 400 ₹10,000 Lowest | 700 ₹17,500 | 515 ₹12,875 |
| 2.20 | Debris
Note: The rates in respect of above items are applicable for NET Quantities arrived at after making deduction for voids @ 30% for Debris & @ 20% in respect of soil from corresponding TRUCK Measurement. | 200 | CuM | 400 ₹80,000 Lowest | 450 ₹90,000 | 750 ₹1,50,000 | 515 ₹1,03,000 |
| 3.00 | Providing and laying in position cement concrete of 1:3:6(1 cement, 3 crushed sand, 6 graded stone aggregate of maximum size 20 mm) / M-10 with minimum cement content as per latest revised IS code including consolidation, finishing, curing etc. complete as per specificationsand drawings but excluding the cost of Form work shuttering, centering Complete at all levels. | 15 | CuM | 12,000 ₹1,80,000 | 7,000 ₹1,05,000 | 9,000 ₹1,35,000 | 6,700 ₹1,00,500 Lowest |
| 4.00Providing and laying in position Reinforced Cement Concrete (RCC) of grade M-30 using 20mm maximum size aggregates and crushed sand of approved quality including admixtures of approved brand and quality (plasticiser or super plasticiser) if required, including weigh batching, mechanical mixing, transporting, placing, vibrating, consolidation, finishing, curing etc. complete but excluding the cost of centering, shuttering and reinforcement complete as per specifications. Notes: i) For all the items, of item no. 4 - in view of limit on water-cement ratio for durability requirements, concrete admixtures (Naphthalene / Melamine based superplasticizers) can be used after taking prior approval of Engineer-in-Charge and the rates quoted for these items shall be inclusive of the cost of admixtures, trial mixes, testing (at site & at approved labs), etc. complete.ii) All projections, fins etc. in the concrete surface formed at the joints in the formwork should be ground & flush and finished at no extra cost.iii) Minimum cement content is as as per latest revised IS code. | |||||||
| 4.10 | up to Plinth Level | 25 | CuM | 15,000 ₹3,75,000 | 9,000 ₹2,25,000 | 11,500 ₹2,87,500 | 8,750 ₹2,18,750 Lowest |
| 4.20 | In Super Structure | 10 | CuM | 16,000 ₹1,60,000 | 9,500 ₹95,000 Lowest | 12,000 ₹1,20,000 | 9,650 ₹96,500 |
| 5.00 | Extra for RCC/PCC Using Ready Mix Concrete from outside project area including transporting and pumping from approved batching plants . | 27 | CuM | 1,000 ₹27,000 | 1,000 ₹27,000 | 1,200 ₹32,400 | 200 ₹5,400 Lowest |
| 6.00 | Providing Reinforcement Steel for reinforced cement concrete at all levels including supplying, preparation of bar bending schedules, cutting, bending, transporting, fixing, tieing in position with PVC coated G.I binding wire, all labour charges, cost of cover blocks in specified grade of concrete etc. complete as per specifications and drawings. Steel supplied by the contractor
"Using TMT bars of specified grades all dia. bars TMT bars to be supplied by the contractor of approved equivalent quality/ product meeting technical parameters, confirming to IS 1786. All test reports to be provided along with the supply of the materials." | 2 | MT | 1,25,000 ₹2,50,000 | 95,000 ₹1,90,000 | 90,000 ₹1,80,000 Lowest | 91,200 ₹1,82,400 |
Tender Value
₹4.1 Cr
EMD Value
₹9.6 L
Closing Date
10 Dec 2025, 3:00 pmClosed
Chief Engineer, CED
CED, BARC, Trombay, Mumbai
Renovation of S-70 Shed including electrical works and part replacement of light roofing at south site, BARC, Trombay, Mumbai
2025_BARC_885401_1
BARC/CED/ET/54/2025-2026 Dated 11/11/2025
Open Tender
Civil Works
Item Rate
548 days
BARC, Trombay, Mumbai.
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹9.6 L
CED, BARC, Trombay, Mumbai
21 May 2026
13 Nov 2025
15 Dec 2025
13 Nov 2025
10 Dec 2025
26 Nov 2025
13 Nov 2025 - 19 Nov 2025
20 Nov 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART-A:CivilWorks:
Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of rank vegetation, grass, brush wood etc. complete and as directed by the Engineer-in-charge . From 0.00 to 1.50 m depth from Average Ground Level | 50 | CuM | - | - |
| 2Lead charges for 1st 1 KM or part thereof, by mechanical transport including loading unloading, stacking / levelling etc. | |||||
| 2.1 | Soil | 25 | CuM | - | - |
| 2.2 | Debris
Note: The rates in respect of above items are applicable for NET Quantities arrived at after making deduction for voids @ 30% for Debris & @ 20% in respect of soil from corresponding TRUCK Measurement. | 200 | CuM | - | - |
| 3 | Providing and laying in position cement concrete of 1:3:6(1 cement, 3 crushed sand, 6 graded stone aggregate of maximum size 20 mm) / M-10 with minimum cement content as per latest revised IS code including consolidation, finishing, curing etc. complete as per specificationsand drawings but excluding the cost of Form work shuttering, centering Complete at all levels. | 15 | CuM | - | - |
| 4Providing and laying in position Reinforced Cement Concrete (RCC) of grade M-30 using 20mm maximum size aggregates and crushed sand of approved quality including admixtures of approved brand and quality (plasticiser or super plasticiser) if required, including weigh batching, mechanical mixing, transporting, placing, vibrating, consolidation, finishing, curing etc. complete but excluding the cost of centering, shuttering and reinforcement complete as per specifications. Notes: i) For all the items, of item no. 4 - in view of limit on water-cement ratio for durability requirements, concrete admixtures (Naphthalene / Melamine based superplasticizers) can be used after taking prior approval of Engineer-in-Charge and the rates quoted for these items shall be inclusive of the cost of admixtures, trial mixes, testing (at site & at approved labs), etc. complete.ii) All projections, fins etc. in the concrete surface formed at the joints in the formwork should be ground & flush and finished at no extra cost.iii) Minimum cement content is as as per latest revised IS code. | |||||
| 4.1 | up to Plinth Level | 25 | CuM | - | - |
| 4.2 | In Super Structure | 10 | CuM | - | - |
| 5 | Extra for RCC/PCC Using Ready Mix Concrete from outside project area including transporting and pumping from approved batching plants . | 27 | CuM | - | - |
| 6 | Providing Reinforcement Steel for reinforced cement concrete at all levels including supplying, preparation of bar bending schedules, cutting, bending, transporting, fixing, tieing in position with PVC coated G.I binding wire, all labour charges, cost of cover blocks in specified grade of concrete etc. complete as per specifications and drawings. Steel supplied by the contractor
"Using TMT bars of specified grades all dia. bars TMT bars to be supplied by the contractor of approved equivalent quality/ product meeting technical parameters, confirming to IS 1786. All test reports to be provided along with the supply of the materials." | 2 | MT | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 7.99 MB
Tendernotice_2.pdf
PDF • 1.60 MB
TechnicalbidET54.xls
Tender Documents • 0.08 MB
SpecificationsItem106.pdf
Tender Documents • 0.54 MB
BOQ_930645.xls
BOQ • 0.45 MB
ProformaOfSchedulesET54.pdf
Tender Documents • 1.28 MB
ElectricalSpecs.pdf
Tender Documents • 3.84 MB
InformationET54.pdf
Tender Documents • 0.47 MB
ScheduleAET54.pdf
Tender Documents • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .