Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.0 CrAccepted-AOC 515 NMS ICON PLOT NO 194 SECTOR 19 ULWE PANVEL 410206 | NAVI MUMBAI | RAIGAD | MAHARASHTRA | 410206 | L1 | Accepted-AOC A | |
| 2 | L2₹48.8 Cr+₹55.5 L (1.15%)Rejected-Finance BEHIND CC TOWER P NO 65 SENAPATI BAPAT ROAD PUNE 411016 | PUNE | PUNE | MAHARASHTRA | 411016 | L2 | Rejected-Finance R | |
| 3 | L3₹50.2 Cr+₹2.0 Cr (4.12%)Rejected-Finance 401 402 AMIT CRYSTAL ABOVE BANK OF BARODA SENAPATI BAPAT ROAD PUNE 411016 SHIVAJI NAGAR PUNE MAHARASHTRA 411016 | PUNE | MAHARASHTRA | 411016 | L3 | Rejected-Finance R | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical MAHARASHTRA | CHHATRAPATI SAMBHAJINAGAR | MAHARASHTRA | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹43.8 Cr
EMD Value
₹21.9 L
Closing Date
13 Apr 2023, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer Public Works Dvision No.2 Latur
Executive Engineer Public Works Dvision No.2 Latur
Construction of college Building for Dairy Technology at Udgir, Tq. Udgir Dist. Latur
2023_PWR_888737_1
E-Tender B-2 Notice No.LTR-2/18/2022-23
Open Tender
Civil Works - Buildings
Item Rate
730 days
Latur Dist
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
₹21.9 L
in O/O Chief Engineer public works Region, Nanded
4 Aug 2023
29 Mar 2023
17 Apr 2023
29 Mar 2023
13 Apr 2023
29 Mar 2023
6 Apr 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART – A (Work Portion) | |||||
| 2(i) Civil Work | |||||
| 3 | ITEM No. 1 :- Clearing grass and removal of rubbish for all leads outside the periphery of the area. | 13,446.19 | One Square Metre | 4 | ₹53,784.76 |
| 4 | ITEM No. 2 :- Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material with all lifts and leads beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift upto 1.5 metre) | 2,603.35 | One Cubic Metre | 207 | ₹5,38,893.45 |
| 5 | ITEM No. 3 :- Excavation for foundation in hard murum including removing the excavated material with all lifts and leads beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift upto 1.50 metre) | 2,333.76 | One Cubic Metre | 227 | ₹5,29,763.52 |
| 6 | ITEM No. 4 :- Excavation for foundation in hard murum and boulders including removing the excavated material with all lifts and leads beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift upto 1.5 metre) | 1,593.69 | One Cubic Metre | 252 | ₹4,01,609.88 |
| 7 | ITEM No. 5 :- Excavation for foundation in Hard murum and boulders including removing the excavated material with all lifts and leads, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etcetera complete. (Lift upto 1.5 metre) | 1,154.48 | One Cubic Metre | 312 | ₹3,60,197.76 |
| 8 | ITEM No. 6 :- Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material with all lifts and leads beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth / murum, ramming, watering including shoring and strutting etcetera complete. (Lift from 1.5 metre to 3.0 metre) By Mechanical Means. | 1,564.61 | One Cubic Metre | 524 | ₹8,19,855.64 |
| 9 | ITEM No. 7 :- Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the bottom surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of chlorophyrifos per square meter of surface area covering 10 years guarantee on bond paper. (Material including all lead and lifts) | 4,505.24 | One Square Metre | 107 | ₹4,82,060.68 |
| 10 | ITEM No. 8 :- Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) treatment by treating the backfill in immediate contact with foundation at the rate of 5 litres of emulsion concentrate of 1.0 percent of clorophyrifos per One Square Metre of vertical surface area covering 10 years guarantee on bond paper. (Material including all lead and lifts) | 2,305.4 | One Square Metre | 112 | ₹2,58,204.8 |
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1548277.xls
BOQ Document • 0.69 MB
117958386.pdf
Tender Document • 1.07 MB
doc.pdf
Tender Document • 6.40 MB
117958390.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .