Tender Value
₹1.5 Cr
EMD Value
₹2.2 L
Closing Date
5 Mar 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
TENDER SEC
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or "V" whichever is less V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover.
The tenderer must have successfully completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender.
Defination of Similar Work :- Design, supply, erection, testing and commissioning work of 1x25 kV or 2x25 kV Traction Substation (TSS) or Switching Stations (SP/SSP) in Railway, PSU and other government department. OR Design, supply, erection, testing and modification work of 1x25 kV or 2x25 kV Traction Substation (TSS) in Railway, PSU and other government department. OR Design, supply, erection, testing and modification work of 1x25 kV or 2x25 kV Switching Stations (SP/SSP) in Railway, PSU and other government department.
35 conditions · 18 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Payment of Tender Papers & Earnest Money:- Payment of tender document & earnest money cost, in respect of e-tendering should be accepted through net banking or payment gateway only. Note:- Fixed Deposit Receipt (FDR) will not be accepted as EMD for tenders invited on IREPS (e-tender portal). No tender will be considered without deposit of full earnest money and tender fee alongwith the tender.
Payment of Tender Papers & Earnest Money:- Payment of tender document & earnest money cost, in respect of e-tendering should be accepted through net banking or payment gateway only. Note:- Fixed Deposit Receipt (FDR) will not be accepted as EMD for tenders invited on IREPS (e-tender portal). No tender will be considered without deposit of full earnest money and tender fee alongwith the tender.
INDIAN RAILWAY STANDARD GENERAL CONDITION OF CONTRACT is available on the Indian Railways website. Tenderers are requested to visit the website and be aware of the Terms and Conditions of GCC.
The Earnest Money of the Unsuccessful Tenderer[s] as here in before provided will be returned to the Unsuccessful Tenderer[s] but the Railway shall not be responsible for any loss or depreciation that may happen to the Earnest Money for the due performance of the stipulation to keep the offer open for the period specified in the offer or to the Earnest Money while in their possession, nor be liable to pay interest thereof. The Earnest Money Amount will be directly credited to the Accounts of Unsuccessful Tenderer[s] as early as possible after the tender case is finalised.
Any notes appearing in the Schedule of Items, Quantities and Rates will take precedence over Additional Special Conditions of Contract and also GENERAL CONDITIONS OF CONTRACT and STANDARD SPECIFICATIONS. The Railway will take for granted that Tenderer[s] has/have acquainted himself/themselves with all terms and words used in the tender before submitting the tender.
Bank Guarantee [BGs] to be submitted by contractors as Performance Guarantee should be sent directly to the concerned authorities by the issuing bank under Registered post AD.
Bidders are not required to re-upload the tender document/NIT under his digital signature.
The successful bidder shall submit the Performance Guarantee (PG) in any of the following forms, amounting to 5% of the contract value:- (i)A deposit of cash; (ii)Irrevocable Bank Guarantee; (iii)Insurance Surety Bond as per Annexure-7 of Chapter-6 (ACS 9 of IRGCC-2022) (iv)Government Securities including State Loan Bonds at 5% below the market value; (v)Deposit Receipts, Pay Orders, Demand Drafts and Guarantee Bonds. These forms of Performance Guarantee should be either of the State Bank of India or of any of the Nationalized Banks; (vi)Guarantee Bonds executed or Deposit Receipts tendered by all Scheduled Banks; (vii)A Deposit in the Post Office Saving Bank ; (viii)A Deposit in the National Savings Certificates; (ix)Twelve years National Defence Certificates; (x)Ten years Defence Deposits; (xi)National Defence Bonds and (xii)Unit Trust Certificates at 5% below market value or at the face value whichever is less. Also FDR in favour of FA&CAO (free from any encumbrance) may be accepted.
The Earnest Money deposited with the tender of successful tenderer will be retained as part of security deposit which will be 5 percent of the value of work awarded. The balance amount of security deposit will recovered on account bill of the work @ 6 percent till it reached up to 5 percent of the value of work including earnest money.
(i) Before submitting a tender, the tenderer will be deemed to have satisfied himself by actual inspection of the site and locality of the works, that all conditions liable to be encountered during the execution of the works are taken into account and that the rates he enters in the tender forms are adequate and all inclusive to accord with the provisions in Clause-37 of the Standard General Conditions of Contract for the completion of works to the entire satisfaction of the Engineer. (ii) Tenderer will examine the various provisions of The General Goods and Services Tax Act, 2017 (CGST)/Integrated Goods and Services Tax Act, 2017(IGST)/Union Territory Goods and Services Tax Act, 2017(UTGST)/ respective state's State Goods and Services Tax Act, (SGST) also, as notified by Central/State Govt& as amended from time to time and applicable taxes before bidding. Tenderers will ensure that full benefit of Input Tax Credit (ITC) likely to be availed by them is duly considered while quoting rates. (iii) The successful tenderer who is liable to be registered under CGST/IGST/UTGST/SGST Act shall submit GSTIN along with other details required under CGST/IGST/UTGST/SGST Act to railway immediately after the award of contract, without which no payment shall be released to the contractor. The contractor shall be responsible for deposition of applicable GST to the concerned authority. (iv) In case the successful tenderer is not liable to be registered under CGST/IGST/UTGST/SGST Act, the railway shall deduct the applicable GST from his/their bills under reverse charge mechanism (RCM) and deposit the same to the concerned authority.
The contract shall be governed by the provision of IRGCC-2022 (Latest) with correction slips up to the date of uploading of tender.
The successful bidder shall have to submit a Performance Guarantee (PG) within 21 (Twenty one) days from the date of issue of Letter of Acceptance (LOA). Extension of time for submission of PG beyond 21 (Twenty one) days and upto 60 days from the date of issue of LOA may be given by the Authority who is competent to sign the contract agreement. However, a penal interest of 12% per annum shall be charged for the delay beyond 21(Twenty one) days, i.e. from 22nd day after the date of issue of LOA. Further, if the 60th day happens to be a declared holiday in the concerned office of the Railway, submission of PG can be accepted on the next working day. In all other cases, if the Contractor fails to submit the requisite PG even after 60 days from the date of issue of LOA, the contract is liable to be terminated. In case contract is terminated railway shall be entitled to forfeit Bid Security and other dues payable to the contractor against that particular contract, subject to maximum of PG amount. In case a tenderer has not submitted Bid Security on the strength of their registration as a Startup recognized by Department of Industrial Policy and Promotion (DIPP) under Ministry of Commerce and Industry, DIPP shall be informed to this effect. The failed Contractor shall be debarred from participating in re-tender for that work.
Design, supply, erection, testing & commissioning of 25 KV, 50 Hz, Single Phase AC New Sub Sectioning Post (SSP) at GKP in connection with KHM-GKP-DMG third line and GKP-JEA doubling project.
OT-18-2025~NER
OT-18-2025
Open
Works - General
6 Months
Gorakhpur, Uttar Pradesh
₹0
₹2.2 L
5 Mar 2026
10 Feb 2026
19 Feb 2026
230 items across 9 schedules · ₹65,62,178.63 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Preparation of designs and drawings for overhead equipment and verification of purchaser's pegging plan. | Per Track KM | 1.00 | 9,344 | 9,344 | |
| 2 | Preparation of designs and drawings for switching stations (FP/SP/SSP) | Each | 1.00 | 16,051 | 16,051 |
| 3 | Supply of 25 KV Post Insulator | Each | 12.00 | 515 | 6,180 |
| 4 | Erection of 25 KV Post Insulator without power block. | Each | 6.00 | 112 | 672 |
| 5 | Extra for special embedment of earth electrode. | Each | 12.00 | 679 | 8,148 |
| 6 | Supply of 25kV Potential Transformers Type-I | Each | 3.00 | 44,466 | 1,33,398 |
| 7 | Erection of 25kV Potential Transformers Type-I | Each | 3.00 | 429 | 1,287 |
| 8 | Supply of Terminal Boards in control cubicles. | Each | 1.00 | 5,061 | 5,061 |
| 9 | Erection of Terminal Boards in control cubicles. | Each | 1.00 | 204 | 204 |
| 10 | Supply of Lead Acid Batteries including wooden stand, electrolyte & tool board. | Set | 1.00 | 42,715 | 42,715 |
| 11 | Erection of Lead Acid Batteries including wooden stand, electrolyte & tool board. | Set | 1.00 | 3,065 | 3,065 |
| 12 | Supply of Battery chargers. | Each | 1.00 | 41,587 | 41,587 |
| 13 | Erection of Battery chargers. | Each | 1.00 | 418 | 418 |
| 14 | Supply of cables for Control and indication circuit | Metre | 120.00 | 201 | 24,120 |
| 15 | Installation of cables for Control and indication circuit | Metre | 120.00 | 7 | 840 |
| 16 | Installation of cables for Heater supply | Metre | 120.00 | 7 | 840 |
| 17 | Supply of cables for Heater supply | Metre | 120.00 | 95 | 11,400 |
| 18 | Installation cables for Catenary indication | Metre | 75.00 | 7 | 525 |
| 19 | Erection, oil- filtration, testing and commissioning of L.T. supply transformers (10 kVA). | Each | 1.00 | 4,572 | 4,572 |
| 20 | Supply of L.T. supply transformers (10 kVA). | Each | 1.00 | 27,426 | 27,426 |
| 21 | Supply of 25 kV D.O. fuse switch. | Each | 1.00 | 4,934 | 4,934 |
| 22 | Erection of 25 kV D.O. fuse switch. | Each | 1.00 | 239 | 239 |
| 23 | Transfer of equipment from one mast or support to another (Material). | Each | 20.00 | 804 | 16,080 |
| 24 | Transfer of equipment from one mast or support to another (Erection) | Each | 20.00 | 1,179 | 23,580 |
| 25 | Provision of an additional bracket assembly/assemblies on a mast or support (Erection). | Each | 4.00 | 1,047 | 4,188 |
| 26 | Dismantling of overhead equipment. | Kilometre | 0.20 | 6,222 | 1,244.4 |
| 27 | Splicing & extension an anchored overhead equipment. | Each | 2.00 | 1,156 | 2,312 |
| 28 | Slewing and putting back of OHE in original shape (Erection) | Each Span | 20.00 | 937 | 18,740 |
| 29 | Dismantling of an Isolator (Erection) | Each | 2.00 | 627 | 1,254 |
| 30 | Dismantling of a Post/ Pedestal Insulator (Erection) | Each | 4.00 | 204 | 816 |
| 31 | Supply of materials, internal wiring and provision of electrical fittings as per details given in explanatory note of the item. | Each | 1.00 | 16,416 | 16,416 |
| 32 | Unloading of all type of Steel Structures. | MT | 8.00 | 61 | 488 |
| 33 | Loading of all type of Steel Structures. | MT | 8.00 | 113 | 904 |
| 34 | Unloading of all type Copper & Aluminium conductors. | MT | 1.00 | 55 | 55 |
| 35 | Loading of all type of Copper & Aluminium conductors. | MT | 1.00 | 55 | 55 |
| 36 | Erection of 25kV Vacuum type Interrupter | Each | 6.00 | 1,913 | 11,478 |
| 37 | Supply of 25kV Vacuum type Interrupter | Each | 6.00 | 1,73,491 | 10,40,946 |
| 38 | Erection of 42KV Lightning Arrestors (station class) | Each | 6.00 | 278 | 1,668 |
| 39 | Supply of 42KV Lightning Arrestors (station class) | Each | 6.00 | 15,119 | 90,714 |
| 40 | Supply and of Iron clad 110 V.D.C Fuse Box. | Each | 1.00 | 1,593 | 1,593 |
| 41 | Erection of Iron clad 110 V.D.C Fuse Box. | Each | 1.00 | 47 | 47 |
| 42 | Supply of Iron clad 230 V.A.C Fuse Box. | Each | 1.00 | 1,762 | 1,762 |
| 43 | Erection of Iron clad 230 V.A.C Fuse Box. | Each | 1.00 | 47 | 47 |
| 44 | Supply of cables for Catenary indication | Metre | 75.00 | 137 | 10,275 |
| 45 | Installation of cables for L.T. Power supply | Metre | 20.00 | 10 | 200 |
| 46 | Supply of cables for L.T. Power supply | Metre | 20.00 | 217 | 4,340 |
| 47 | Supply of cables for 110V D.C. supply | Metre | 20.00 | 137 | 2,740 |
| 48 | Installation of cables for 110V D.C. supply | Metre | 20.00 | 10 | 200 |
| 49 | Dismantling of a Section Insulator Assembly (Material) | Each | 1.00 | 670 | 670 |
| 50 | Dismantling of a Section Insulator Assembly (Erection) | Each | 1.00 | 1,156 | 1,156 |
| 51 | Erection of mounting arrangements for span wire. | Each | 2.00 | 434 | 868 |
| 52 | Supply of mounting arrangements for span wire. | Each | 2.00 | 3,199 | 6,398 |
| 53 | Erection of cut-in 9Tonne Insulator | Each | 12.00 | 283 | 3,396 |
| 54 | Supply of cut-in 9Tonne Insulator | Each | 12.00 | 688 | 8,256 |
| 55 | Erection of 25 KV Post Insulator with power block. | Each | 6.00 | 224 | 1,344 |
| 56 | Erection of materials for termination of copper cross feeder with gantries. | Set | 8.00 | 408 | 3,264 |
| 57 | Supply of materials for termination of copper cross feeder with gantries. | Set | 8.00 | 2,895 | 23,160 |
| 58 | Erection a suspension (9Tonne) Insulator | Each | 12.00 | 168 | 2,016 |
| 59 | Supply of a suspension (9Tonne) Insulator | Each | 12.00 | 713 | 8,556 |
| 60 | Manning of Switching stations (SP/SSP) | Each/month | 2.00 | 19,148 | 38,296 |
| 61 | Marking/painting of temperature & 'Y'- Measurement of OHE mast at BWA locations | Each | 4.00 | 62 | 248 |
| 62 | Supply of material for termination of all aluminium 25KV Feeder / return conductor (Single SPIDER) | Each | 4.00 | 3,043 | 12,172 |
| 63 | Erection of material for termination of all aluminium 25KV Feeder / return conductor (Single SPIDER) | Each | 4.00 | 408 | 1,632 |
| Schedule total | ₹17,06,600.4 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TDOT-18-2025Rev.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .