Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 CrAdmitted-Finance | -1.51% | ₹2.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.3 Cr+₹5.7 L (2.55%)Admitted-Finance | +1.00% | ₹2.3 Cr+₹5.7 L (2.55%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical non responsive |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical non responsive |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical non responsive |
Tender Value
₹2.3 Cr
EMD Value
₹4.6 L
Closing Date
24 Jun 2026, 4:00 pmClosed
Executive Engineer Construction Division kashmir
Executive Engineer Construction Division kashmir, bakhshi stadium
Flood restoration and reconstruction of play field at Arhama Shopian.
2026_SPORT_311064_1
NIT 03 of 2026-27
Open Tender
Civil Works
Percentage
210 days
srinagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
ex.engineer, CDK
₹4.6 L
Executive Engineer Construction Division kashmir
1 Aug 2026
26 May 2026
25 Jun 2026
26 May 2026
24 Jun 2026
6 Jun 2026
6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Shopian
Basketball Court Synthetic
Earthwork in excavation by manual means in trenches for foundation drains pipes etc not exceeding 1.5mtr in width and not exceeding 10 sqm on plan depth upto 1.5mtr including backfilling of soil & disposal of excavated soil to be leveled and neatly dressed within 25mts lead. | 585.5 | Sqm | 91.7 | ₹53,690.35 |
| 2 | P/L stone soling hand packed incl ramming with heavy rammers all carriage upto site of work | 58.88 | Cum | 1,000 | ₹58,880 |
| 3 | P/L in position cement concrete in foundation and plinth excluding the cost of centring and shuttering all work upto plinth level
(1;4;8) stone aggregate 40 mm nominal size crushed aggregate . | 44.6 | Cum | 5,202.9 | ₹2,32,049.34 |
| 4 | P/L in position cement concrete of specified grade excluding the cost of shuttering and centering finishing and reinforcement all work upto plinth level (1:2:4) stone aggregate 20mm nominal size aggregate | 58.88 | Cum | 7,104.35 | ₹4,18,304.13 |
| 5 | 12mm cement plaster in 1:4 mix (1 cement :4 fine sand) with all leads lifts and carriages etc complete job. | 585.5 | Sqm | 353.1 | ₹2,06,740.05 |
| 6 | Reinforcement for RCC work incl. straightening, cutting, placing in position and binding all complete Fe.500 Grade (Comforming to IS:1786-1985) upto floor 5 level complete job incl. all carriages. | 2,060.7 | Kgs | 123.2 | ₹2,53,878.24 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for: | 6.44 | sqm | 286.35 | ₹1,844.09 |
| 8 | Supply and fixing of stone dust along the sides of court for a width of 2m incl. hand ramming watering and all carriage upto site of work | 26.92 | Cum | 1,200 | ₹32,304 |
| 9 | Supply, installation, Curbing and marking of FIBA approved synthetic modular suspended interlocking Sports Flooring (Tile) with
specifications as size (340.8mmx304.8mmx15.8mm) :- weight not less than 370gm/Sft, thickness not less than 1.50 cm, UV resistant antiskid surface made of Polypropylene (PP), double layered structure / Mesh with side locks, minimum temperature bearing capacity -40°C to 70°C, stay for 24 hours, Ball rebound performance ≥ 90%, slip resistance 80s-110, vertical deformation :1.5mm-5mm & the Product shall be listed on official FIBA website. The product should be Modular Flooring with application
of game lines and transition materials. The items should be inclusive of drainage, adjustment of poles, curbing of edges / corners etc. complete marking of game line with game line paint as per FIBA inclusive of all leads, lifts, GST and carriages etc. complete in all respects”. | 5,292 | Sft | 320 | ₹16,93,440 |
| 10 | Supply of basketball post set of standard quality and approved make Cosco, Koxxton, Lifetime or equivalent made of heavy duty tube structure with spring loaded system for height adjustment at different levels along with 20mm acrylic board dunking rings and padding for the safety of players, provided with wheels for smooth shifting and levelers to adjust height on uneven surfaces complete incl. all taxes(GST), royalties etc with loading/unloading assembling erecting and adjusting at site and all leads lifts and carriages complete. | 2 | Nos. | 1,38,500 | ₹2,77,000 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.59 MB
BOQ_1007017.xls
BOQ • 0.43 MB
Datecorrrrr.pdf
PDF • 0.19 MB
coerrrr.pdf
PDF • 0.42 MB
D.pdf
PDF • 0.34 MB
Doc.pdf
PDF • 0.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .