Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC 7 2 HARI MOHAN ROY L ANE CAL 15 700015 | KOLKATA | WEST BENGAL | 700015 | L1 | Accepted-AOC 1st Lowest | |
| 2 | L2₹3.0 L+₹1,233 (0.42%)Rejected-Finance 34E SUREN SARKAR ROAD KOLKATA KOLKATA WB 700010 | KOLKATA | WEST BENGAL | 700010 | L2 | Rejected-Finance 2nd Lowest | |
| 3 | L2₹3.0 L+₹1,233 (0.42%)Rejected-Finance 1087 LASKARHAT KOLKATA 700039 | KOLKATA | WEST BENGAL | 700039 | L2 | Rejected-Finance 2nd Lowest |
Tender Value
Refer Docs
EMD Value
₹5,896
Closing Date
27 Mar 2024, 2:00 pmClosed
EXECUTIVE ENGINEER/GRWW
OFFICE OF THE EXECUTIVE ENGINEER (WATER SUPPLY) GARDEN REACH WATER WORKS, BIDHANGARH, KOL-66
DISMANTLING, REPAIRING AND RE-FIXING OF 700MM DIA ACTUATOR OPERATED RISING TYPE DELIVERY SLUICE VALVE OF PUMP UNIT NO. 3 WITH ALLIED WORKS AT CWPS-III, GRWW.
2024_KMC_686936_1
EE/WS/GRWW/22-23/PH-II/R12
Open Tender
MECHANICAL
Item Rate
15 days
CWPS-III, GRWW
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,896
16 Jan 2026
16 Mar 2024
30 Mar 2024
16 Mar 2024
27 Mar 2024
16 Mar 2024
Amount
DISMANTLING, LIFTING ETC OF THE ENTIRE EXISTING 700MM DIA ACTUATOR-OPERATED RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-III, GRWW FROM THE EXISTING PIPE-BAY SEQUENTIALLY BY OPENING, DISMANTLING AND REMOVING OF THE EXISTING SCRAP HOLDING, OPENING AND DISMANTLING OF ALL THE NUTS, BOLTS ETC OF BOTH SUCTION AND DELIVERY SIDE AND KEEPING IT AT A SUITABLE PLACE, ADOPTING ALL SORTS OF REQUIRED PRECAUTIONS, SAFETY ETC AND USING ALL SORTS OF MACHINES, INSTRUMENTS, TOOLS AND TACKLES, ARRANGEMENTS, SUPPORTS ETC AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC.
TRANSPORTATION OF THE 700MM DIA ACTUATOR-OPERATED RISING TYPE SLUICE VALVE, PN1.6 FROM CWPS-III, GRWW TO MACHINE SHOP WITH FULL SAFETY TO AVOID ANY FURTHER DAMAGE INCLUDING LOADING & UNLOADING WITH THE ARRANGEMENT OF CRANE AND/OR TEPOY ALONG WITH ALL REQUIRED TOOLS AND TACKLES AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC.
DISMANTLING ALL COMPONENTS OF THE 700MM DIA ACTUATOR-OPERATED RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-III, GRWW PART BY PART, LIKE GLAND PUSHER WITH PACKINGS, TOP CHAIR, BEARING, TOP BONNET, GASKET, SS STEM, GM NUT, BODY SEAT RING, WEDGE SEAT RING, GUIDE SHOE, GUIDE CHANNEL ETC FOR THOROUGH SERVICING AND REPAIRING OF THE VALVE IN ALL RESPECTS ADOPTING ALL SORTS OF REQUIRED PRECAUTIONS, SAFETY ETC AND USING ALL SORTS OF MACHINES, INSTRUMENTS, TOOLS AND TACKLES, ARRANGEMENT, SUPPORTS ETC AS PER SITE -REQUIREMENT AND DIRECTION OF THE EIC.
MAKING PATTERN FOR THE SEAT RING OF THE BODY OR THE WEDGE OF THE 700MM DIA ACTUATOR-OPERATED RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-III, GRWW FOR CASTING OF NEW RINGS, COMPLETE IN ALL RESPECTS IN CASE OF REQUIREMENT OF NEW ONE, INCLUDING ALL ALLIED WORKS, ALL COMPLETE, AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC.
CASTING OF SS 410 FOR THE SEAT RING OF THE BODY OR THE WEDGE OF THE 700MM DIA ACTUATOR-OPERATED RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-III, GRWW AND MACHINING, FINISHING AND MATCHING THE SAME AS PER SAMPLE IN ALL RESPECTS INCLUDING ALL SORTS OF ALLIED WORKS IN THE CASE OF REQUIREMENT OF NEW RING, ADOPTING ALL SORTS OF RQUIRED PRECAUTIONS, SAFETY ETC AND USING ALL SORTS OF REQUIRED MACHINES, INSTRUMENTS, TOOLS AND TACKLES,ARRANGEMENTS, SUPPORTS ETC AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC.
INSERTING AND FITTING-FIXING OF THE SEAT RING ON THE BODY OR WEDGE OF THE 700MM DIA ACTUATOR-OPERATED RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-III, GRWW PROPERLY FOR SMOOTH FUNCTIONING OF THE SAME AND COMPLETE IN ALL RESPECTS, ALL COMPLETE, ADOPTING ALL SORTS OF REQUIRED PRECAUTIONS, SAFETY ETC AND USING ALL SORTS OF REQUIRED MACHINES, INSTRUMENTS, TOOLS AND TACKLES, ARRANGEMENTS, SUPPORTS ETC AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC.
MAKING PATTERN FOR THE GUIDE CHANNEL OF THE VALVE BODY OF THE 700MM DIA ACTUATOR-OPERATED RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-III, GRWW FOR CASTING OF GUIDE CHANNEL INCLUDING ALL SORTS OF ALLIED WORKS LAND COMPLETE IN ALL RESPECTS IN THE CASE OF REQUIREMENT OF NEW ONE AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC.
CASTING OF SS 410 FOR THE GUIDE CHANNEL OF THE BODY OF THE 700MM DIA ACTUATOR-OPERATED RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-III, GRWW AND PROVIDING, LAPPING AND FIXING OF GM SHEET WITH PROPER THICKNESS AND LENGTH IN THE ENTIRE INNER SIDE (U-SHAPE) AND MACHINING, FINISHING, MATCHING AND THE SAME AS PER SAMPLE IN ALL RESPECTS INCLUDING ALL SORTS OF ALLIED WORKS IN THE CASE OF REQUIREMENT OF NEW ONE, ALL COMPLETE, ADOPTING ALL SORTS OF REQUIRED PRECAUTIONS, SAFETY ETC AND USING ALL SORTS OF REQUIRED MACHINES, INSTRUMENT, TOOLS AND TACKLES, ARRANGEMENTS, SUPPORTS ETC AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC.
INSERTING AND FITTING-FIXING OF GUIDE CHANNEL ON THE BODY OF THE 700MM DIA ACTUATOR-OPERATED RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-III, GRWW PROVIDING ALL SORTS OF REQUIRED NUTS, BOLTS ETC, PROPERLY FOR SMOOTH FUNCTIONING OF THE SAME AND COMPLETE IN ALL RESPECTS, ALL COMPLETE, ADOPTING ALL SORTS OF REQUIRED PRECAUTIONS, SAFETY ETC AND USING ALL SORTS OF REQUIRED MACHINES, INSTRUMENTS, TOOLS AND TACKLES, ARRANGEMENTS, SUPPORTS ETC AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC.
MAKING PATTERN FOR THE GUIDE SHOE OF THE WAGE OF THE 700MM DIA ACTUATOR-OPERATED RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-III, GRWW FOR CASTING OF GUIDE SHOE INCLUDING ALL SORTS OF ALLIED WORKS AND COMPLETE IN ALL RESPECTS IN THE CASE OF REQUIREMENT OF NEW ONES AS PER SITE REQUIREMENT AND DIRECTION OF THE EIC.
CASTING OF STAINLESS STEEL 410 FOR THE GUIDE SHOE OF THE WEDGE OF THE 700MM DIA ACTUATOR-OPERATED RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-III, GRWW AND PROVIDING, LAPPING AND FIXING OF GM SHEET WITH PROPER THICKNESS AND LENGTH IN THE ENTIRE OUTER SIDE (U-SHAPE) AND MACHINING, FINISHING, MATCHING THE SAME AS PER SAMPLE IN ALL RESPECTS INCLUDING ALL SORTS OF ALLIED WORKS IN THE CASE OF REQUIREMENT OF NEW GUIDE SHOE, ALL COMPLETE, AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC.
INSERTING AND FITTING-FIXING OF GUIDE SHOE ON THE WEDGE OF THE 700MM DIA ACTUATOR-OPERATED RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-III, GRWW PROVIDING ALL SORTS OF REQUIRED NUTS, BOLTS ETC, PROPERLY FOR SMOOTH FUNCTIONING OF THE SAME AND COMPLETE IN ALL RESPECTS, ALL COMPLETE, ADOPTING ALL SORTS OF REQUIRED PRECAUTIONS, SAFETY ETC AND USING ALL SORTS OF REQUIRED MACHINES, INSTRUMENTS, TOOLS AND TACKLES, ARRANGEMENTS, SUPPORTS ETC AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC.
MAKING PATTERN FOR THE WEDGE OF THE 700MM DIA ACTUATOR-OPERATED RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-III, GRWW FOR CASTING OF WEDGE INCLUDING ALL SORTS OF ALLIED WORKS AND COMPLETE IN ALL RESPECTS IN THE CASE OF REQUIREMENT OF NEW ONE AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC.
CASTING OF CAST IRON FOR THE WEDGE OF THE 700MM DIA ACTUATOR-OPERATED RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-III, GRWW AND MACHINING, FINISHING, MATCHING THE SAME AS PER SAMPLE IN ALL RESPECTS INCLUDING ALL SORTS OF ALLIED WORKS IN THE CASE OF REQUIREMENT OF NEW WEDGE, ALL COMPLETE, AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC.
INSERTING AND FITTING-FIXING OF THE WEDGE OF THE 700MM DIA ACTUATOR-OPERATED RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-III, GRWW PROPERLY FOR SMOOTH FUNCTIONING OF THE SAME AND COMPLETE IN ALL RESPECTS, ADOPTING ALL SORTS OF REQUIRED PRECAUTIONS, SAFETY ETC AND USING ALL SORTS OF REQUIRED MACHINES, INSTRUMENTS, TOOLS AND TACKLES, ARRANGEMENTS, SUPPORTS ETC AS PER SITE-REQUIRED MACHINES, INSTRUMENTS, TOOLS AND TACKLES ARRANGEMENTS, SUPPORTS ETC AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC.
MANUFACTURING AND FITTING-FIXING OF NEW NUT (GM) OF THE 700MM DIA ACTUATOR-OPERATED RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-III, GRWW WITH MAKING SQUARE OF ACKME THREAD AS PER IS STANDARD, MACHINING, FINISHING AND MATCHING, AS PER SAMPLE AND COMPLETE IN ALL RESPECTS, INCLUDING ALL SORTS OF ALLIED WORKS, ALL COMPLETE, ADOPTING ALL SORTS OF PRECUATIONS AND SAFETY AND USING ALL SORTS OF MACHINES, INSTRUMENTS, ARRANGEMENTS, TOOLS & TACKLES ETC. AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC.
COMPLETE ASSEMBLY OF THE ENTIRE 700MM DIA ACTUATOR-OPERATED RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-III, GRWW PART BY PART, INCLUDING PROVIDING REQUIRED NUTS & BOLTS (EN-8), GASKET ETC AND OTHER SPARE INCLUDING ALL SORTS OF ALLIED WORKS, ALL COMPLETE, ADOPTING ALL SORTS OF PRECUATIONS AND SAFETY AND USING ALL SORTS OF MACHINES, INSTRUMENTS, ARRANGEMENTS, TOOLS & TACKLES ETC. AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC.
PERFORMING HYDROSTATIC TESTS OF THE ASSEMBLED 700MM DIA ACTUATOR-OPERATED RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-III, GRWW AND COMPLETE IN ALL RESPECTS INCLUDING ALL SORTS OF ALLIED WORKS, ALL COMPLETE, ADOPTING ALL SORTS OF PRECUATIONS AND SAFETY AND USING ALL SORTS OF MACHINES, INSTRUMENTS, ARRANGEMENTS, TOOLS & TACKLES ETC. AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC.
SCRAPPING, CLEANING AND PAINTING OF THE OUTSIDE OF THE VALVE BODY OF THE 700MM DIA ACTUATOR-OPERATED RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-III, GRWW WITH 2 COATS OF SYNTHECTIC ENAMEL PAINT AS REQUIRED, INCLUDING ALL SORTS OF ALLIED WORKS, ALL COMPLETE, ADOPTING ALL SORTS OF PRECUATIONS AND SAFETY AND USING ALL SORTS OF MACHINES, INSTRUMENTS, ARRANGEMENTS, TOOLS & TACKLES ETC, AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC.
TRANSPORTATION OF THE 700MM DIA ACTUATOR-OPERATED RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-III, GRWW FROM MACHINE SHOP TO GRWW, KEEPING IT AT A SUITABLE PLACE WITH FULL SAFETY AND PRECAUTIONS INCLUDING LOADING AND UNLOADING WITH THE ARRANGEMENT OF CRANE AND/OR TEPOY ALONG WITH ALL REQUIRED TOOLS AND TACKLES AS PER SITE-REQUIREMENT AND DIRECTION OF THE EIC.
LIFTING, PUTTING AND INSTALLATION OF THE 700MM DIA ACTUATOR-OPERATED RISING TYPE SLUICE VALVE, PN1.6 OF CWPS-III, GRWW IN EXISTING PIPE-BAY SEQUENTIALLY BY PROVING, INSERTING, TIGHTENING ETC OF THE REQUIRED SS NUTS, BOLTS, WASHER ETC OF BOTH SUCTION AND DELIVERY SIDES AND REASSEMBLING OF THE SCRAP HOLDING PART BY PART, INSERTING AND TIGHTENING OF ALL THE NUTS, BOLTS ETC OF THE SCRAP HOLDING,ADOPTING ALL SORTS OF REQUIRED PRECAUTIONS, SAFETY ETC AND USING ALL SORT OF MACHINES, INSTRUMENTS, TOOLS AND TACKLES, ARRANGEMENTS, SUPPORTS ETC AS PER SITE -REQUIREMENT AND DIRECTION OF THE EIC.
S R ENTERPRISE
Hydraulic Engineers
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .