Loading…
Loading…
Tender Value
₹3.6 Cr
EMD Value
₹7.2 L
Closing Date
25 Sept 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
AGRA DIV
15 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees, N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure- VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.(Note: No other document than specified above shall be considered valid for evaluating this eligibility criteria).In case of non-submission of above documents, offer may be summarily rejected.
(a) The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the onein which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender,or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender,or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous tothe onein which tender is invited: (i) Three similar works each costing not less thanthe amount equal to30% of advertised value of each component of tender,or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender,or (iii) similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b) (2)In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited througha works contract.
In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Engineer in writing. Note for Item 10.1: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.(Note:In case of non-submission of above documents, offer may be summarily rejected).
Defination of Similar Work :- Any work involving laying and jointing of any underground telecom cables OR Laying and splicing OFC or augmentation of telecom facilities.
49 conditions · 6 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Documents to be submitted along with the tender.
Please submit your bank details i.e. Name of the Bank along with Bank Branch Code, Account Number, IFSC Code, and PAN Number. (Format attached)
The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) / Registered Society / Registered Trust / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. The tenderer(s) shall enclose the attested copies of the constitution of their concern, and copy of PAN Card along with their tender. Tender Documents in such cases are to be signed by such persons as may be legally competent to sign them on behalf of the firm, company, association, trust or society, as the case may be. (Note:In case of non-submission of above documents, offer may be summarily rejected).
The tenderer whether sole proprietor / a company or a partnership firm / joint venture (JV) /registered society / registered trust / HUF / LLP etc if they want to act through agent or individual partner(s), should submit along with the tender, a copy of power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, specifically authorizing him/them to sign the tender, submit the tender and further to deal with the Tender/ Contract up to the stage of signing the agreement except in case where such specific person is authorized for above purposes through a provision made in the partnership deed / Memorandum of Understanding / Article of Association /Board resolution, failing which tender shall be summarily rejected. A separate power of 2.2.1 attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, shall be submitted after award of work, specifically authorizing him/them to deal with all other contractual activities subsequent to signing of agreement, if required. Note: A Power of Attorney executed and issued overseas, the document will also have to be legalized by the Indian Embassy and notarized in the jurisdiction where the Power of Attorney is being issued. However, the Power of Attorney provided by Bidders from countries that have signed the Hague Legislation Convention 1961 are not required to be legalized by the Indian Embassy if it carries a conforming Apostille certificate.(Note:In case of non-submission of above documents, offer may be summarily rejected).
The tenderer will give full information ( in annexure-A) as to the date of retirement of such Engineer or gazetted officer from the said service and as to whether permission for taking such contract, or if the Contractor be a partnership firm or an incorporated company, to become a partner or director as the case may be, has been obtained by the tenderer or the Engineer or officer, as the case may be from the President of India or any officer, duly authorized by him in this behalf, shall be clearly stated in writing at the time of submitting the tender,if a tenderer is - i) be a retired Engineer of the gazetted rank or any other gazetted officer working before his retirement, whether in the executive or administrative capacity or whether holding a pensionable post or not, in the Engineering or any other department of any of the railways owned and administered by the President of India for the time being, OR ii) being partnership firm / joint venture (JV) / registered society / registered trust etc have as one of its partners/members a retired Engineer of the gazetted rank or any other gazetted officer working before his retirement, OR iii) being an incorporated company have any such retired Engineer of the gazetted rank or any other gazetted officer working before his retirement as one of its directors AND in case where such Engineer or officer had not retired from government service at least 1 year prior to the date of submission of the tender
If a tenderer or Contractor being an individual, have member(s) of his family or in the case of partnership firm/ company / joint venture (JV) / registered society / registered trust etc. one or more of his partner(s)/shareholder(s) or member(s) of the family of partner(s)/shareholder(s) having share of more than 1% in the 2.3.1 tendering entity employed in gazetted capacity in the Engineering or any other department of the railway, then the tenderer at the time of submission of tender, will inform the authority inviting tenders the details of such persons. ( in annexure-A)
An undertaking shall be submitted in form of Annexure-VA is to be given by attorney/authorized signatory/each member of Partnership firm/Joint Venture (JV) / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. as the case may be. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the General Conditions of Contract. Note-1: Annexure VA should be submitted as per explanatory formats which are part of documents uploaded alongwith the NIT in the name of guidelines for filling of Annexure VA. Note-2: In case of non submission of above certificate, or submission of certificate either not properly filled in, or, in a format other than the prescribed format, shall lead to summarily rejection of your offer.
General Compliance
The accepted rates shall be deemed to include and cover all fees, taxes, duties, royalties, rent etc
Income Tax, Surcharge thereof, Goods & Service Tax (GST Act, 2017) and any other applicable tax shall be recovered from contractor's bill as per rule in force.
Implementation of GST Act, 2017 - Procedure for payment of Contractual bill is given in General Instructions attached in document. Please go through the procedure before submission of the offer.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Information regarding staff, Plant & machinery, past experience and ongoing work details
Please furnish list of plant and Machinery available on hand own and proposed to be inducted own and hired to be given separately for the subject work.
Please furnish list of Works on hand indicating Description of Work, Contract Value, Approximate value of balance work yet to be done and Date of award.
Please furnish list of Works completed in last seven financial years giving Description of Work, Organization for whom executed, approximate value of contract at time of award, Date of award and Date of Completion. Date of actual Start, Actual Completion and Final value of Contract shall also be given
Please furnish list of personal, organization available on hand and proposed to be engaged for the subject work.
If bid security is submitted in the form of Bank Guarantee, it shall be made in favour of Senior Divisional Finance Manager, North Central Railway, Agra. The format of Bank Guarantee is attached in Annexure VI A. The original Bank Guarantee should be delivered to this office within 5 working days before closing date for submission of bids.
Prior consent of Railway representative to be taken before procurement of material for supply item.
Guidelines for online Bank Guarantee verification should be followed as per attached document.
Tenderer (s) should attached the scan documents in support of minimum eligibility criteria along with the tender. No document in support of minimum eligibility criteria will be accepted/entertained after opening of tender.
Security Deposit: The Security Deposit shall be 5% of the contract value. The Bid Security submitted by the Contractor with his tender will be retained/encashed by the Railways as part of security for the due and faithful fulfillment of the contract by the Contractor. Provided further that, if Contractor submits the Cash or Term Deposit Receipt issued from a Scheduled commercial bank of India or irrevocable Bank Guarantee Bond from a Scheduled commercial bank of India, either towards the Full Security Depositor the Part Security Deposit equal to or more than Bid Security, the Railway shall return the Bid Security, to the Contractor. Balance of Security Deposit may be deposited by the Contractor in cash or Term Deposit Receipt issued from Scheduled commercial bank of India or irrevocable Bank Guarantee bond issued from Scheduled commercial bank of India, or may be recovered at the rate of 6% of the bill amount till the full Security Deposit is recovered. Provided also that in case of defaulting Contractor, the Railway may retain any amount due for payment to the Contractor on the pending "on account bills" so that the amounts so retained (including amount guaranteed through Performance Guarantee) may not exceed 10% of the total value of the contract. The Irrevocable Bank Guarantee submitted towards Security deposit shall be initially valid up to the stipulated date of Maintenance period plus 60 days and shall be extended from time to time, depending upon extension of contract granted in terms of Clause 17A and 17B of the Standard General Conditions of Contract. Note: Security Deposit deposited in cash by the Contractor or recovered from the running bills of a Contractor or submitted by contractor as Term Deposit Receipt(s) can be refunded/returned to the contractor, in lieu of irrevocable Bank Guarantee bond issued from scheduled commercial bank of India, to be submitted by him, for an amount equal to or more than the already available Security Deposit, provided however that, in a contract of value less than Rs. 50 Crore, such refund/ return of the already available Security Deposit is permitted up to two times and in a contract of value equal to or more than Rs. 50 Crore, such refund / return of the already available Security Deposit is permitted up to three times.
Performance Guarantee:- The procedure for obtaining Performance Guarantee is outlined below: (a)The successful bidder shall have to submit a Performance Guarantee (PG) within 21 (Twenty one) days from the date of issue of Letter of Acceptance (LOA). Extension of time for submission of PG beyond 21 (Twenty one) days and upto 60 days from the date of issue of LOA may be given by the Authority who is competent to sign the contract agreement. However, a penal interest of 12% per annum shall be charged for the delay beyond 21(Twenty one) days, i.e. from 22nd day after the date of issue of LOA. Further, if the 60thday happens to be a declared holiday in the concerned office of the Railway, submission of PG can be accepted on the next working day. In all other cases, if the Contractor fails to submit the requisite PG even after 60 days from the date of issue of LOA, the contract is liable to be terminated. In case contract is terminated railway shall be entitled to forfeit Bid Security and other dues payable to the contractor against that particular contract, subject to maximum of PG amount. In case a tenderer has not submitted Bid Security on the strength of their registration as a Startup recognized by Department of Industrial Policy and Promotion (DIPP) under Ministry of Commerce and Industry, DIPP shall be informed to this effect. The failed Contractor shall be debarred from participating in re-tender for that work. Note: If tender is accepted on the quoted rates of bidder which is below the advertised tender value, an additional performance security shall be submitted by the bidder as per New Para 16(4) (h) of Part-II of GCC 2022 introduced vide Correction slip No. 11 dated 13.03.2026. The said correction slip is attached document TAB of NIT.
The Tenderers having more than 20 labour, is required to obtain the labour license from the licensing Officer under Provision of Contract Labour (Regulation and Abolition) Act 1970 read with Contract Labour (Regulation and Abolition) Central Rules 1970. They should obtain a proper and valid labour license for the concerned work from the concerned Asstt. Labour Commissioner or licensing officer of the area and the photo copy of the labour license must be submitted to Railway for records . Failure to do so will attract legal action against the tenderer
In case any contradiction between general condition of contract & special conditions of contract will prevail over general conditions of contract.
If the tenderer(s) deliberately gives / give wrong information in his/their tender or creates/create circumstances for the acceptance of his/their tender, the Railway reserves the right to reject such tender at any stage.
All Rules of NIT & Post LOA shall be governed by GCC & tenderer agree to adhere to it without any dispute.
Contractor will clear/clean the work site after completion of the work, to the satisfaction of site engineer.
All false work, staging etc. should be so erected, clamped and secured that these should not infringe / moving dimension and obstruct the railway traffic.
In terms of clause 26A.3 of GCC, the Contractor shall deploy atleast one Diploma Holder Engineers at site during the execution of work.
Special Conditions of contract for mandatory updation of Labour Data on Railway's Srakimkalyan Portal by Contract. Clause 54 & 55 of Indian Railway General Conditions of Contract deals with Wages to labour and action in case of default of contractor to payment of wages. In order to increase transparency in payment of Contract Labour wages and other payments, a web based application has been developed and hosted on website www.shramikkalyan.indianrailway.gov.in. All contractors are required to upload details of their LoAs, engaged workmen, wage payment details, PF/ESI details, bonus details etc., on monthly basis. This details so uploaded shall be available in public domain. In order to ensure prompt and proper uploading of details related to LoAs, engaged workmen, wage & other payment details. The special condition is as under:
A.Contactor is to abide by the provisions of Payment of Wages act & Minimum Wages act in terms of clause 54 and 55 of Indian Railway General Condition of Contract. In order to ensure the same, an application has been developed and hosted on website 'www.shramikkalyan.indianrailways.gov.in'. Contractor shall register his firm/company etc. and upload requisite details of labour and their payment in this portal. These details shall be available in public domain. The Registration/ updation of Portal shall be done as under: (a) Contractor shall apply for onetime registration of his company/firm etc. in the Shramikkalyan portal with requisite details subsequent to issue of Letter of Acceptance. Engineer shall approve the contractor's registration on the portal within 7 days of receipt of such request. (b) Contractor once approved by any Engineer, can create password with login ID (PAN No.) for subsequent use of portal for all LoAs issued in his favour. (c) The contractor once registered on the portal, shall provide details of his Letter of Acceptances (LoA)/Contract Agreement on shramikkalyan portal within 15 days of issue of any LoA for approval of concerned engineer. Engineer shall update (if required and approve the details of LoA filled by contractor within 7 days of receipt of such request. (d) After approval of LoA by Engineer, contractor shall fill the salient details of contract labours engaged in the contract and ensure updating of each wage payment to them on shramikkalyan portal on monthly basis. (e) It shall be mandatory upon the contractor to ensure correct and prompt uploading of all salient details of engaged contractual labour & payments made thereof after each wage period.
B. While processing payment of any 'On Account bill' or 'Final bill' or release of 'Advances' or 'Performance Guarantee/Security deposit', contractor shall submit a certificate to the Engineer of Engineer's representatives that " I have 14.1.1 uploaded the correct details of contract labours engaged in connection with this contract and payment made to them during the wage period in Railway's Shramik kalyan portal at 'www.shramikkalyan.indianrailways.gov.in' till_____ Month,_______ year."
Old GCC has been changed and replaced with new General Conditions of Contract-2022, which has been added in tender document. Please go through this new General Condition of Contract-2022 before bidding. In case of any discrepancy, contradiction with regard to GCC (except special condition of contract) in that case GCC- 2022 will be applicable.
Provision of CCTV display of Non-interlocked LC gate at SM room and Engineering control of AGC division.
AGRA-ST-2026-27~NCR
AGRA-ST-2026-27
Open
Works - General
12 Months
Agra, Uttar Pradesh
₹0
₹7.2 L
1 Sept 2026
1 Sept 2026
11 Sept 2026
87 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 3,61,62,314.77 | ||
| — | 75.00 | — | — | ||
| Supply of permanently lubricated HDPE duct,40mm outer dia, as per RDSO spec.No.RDSO/SPN/TC/45/2013Rev.2 Amndt.2 or latest, alongwith all accessories like end caps, collars, bends, couplers etc. (Inspection by RITES) | — | — | — | 59,53,458 | |
| — | 75.00 | — | — | ||
| Laying of HDPE duct as per the approved cable route plan in the exavated trenches/other protected works/RCC channel etc. including all accessories like end caps, collars, bends, couplers etc. The ends of the duct to be sealed with end plugs till OFC blowing is done. Important: The laying of OFC cable independently or along with Quad cable/PIJF cable in the same trench shall be governed by the RDSO drawings no. RDSO/TCDO/COP-6(a) and RDSO/TCDO/COP-8(a) respectively issued vide Chapter- XIII of the Telecom Manual | — | — | — | 5,89,923 | |
| — | 75.00 | — | — | ||
| Blowing/drawing of OFC cable in the HDPE pipe duct and protective work already provided in the trench. The cable shall be laid only after the successful completion of the DIT (Duct Integrity test). The DIT should be certified by the Railway engineer at site. All the equipments/machinery required shall be arranged by the contractor. | — | — | — | 12,82,905.75 | |
| — | 300.00 | — | — | ||
| Supply of power cable 3 core, 2.5 sq mm, multi strand (36/0.3 mm dia) cable as per IS 694:1990 reaffirmed 1995 or latest suitable for Railway electrification area, shall be of reputed make like Havells, Delton, LAPP, Finolex, or superior. (Inspection by Consignee) | — | — | — | 22,707 | |
| — | 2300.00 | — | — | ||
| Laying of Data cable/Communication cable/Power cable etc. in PVC conduit pipe with all fiitings and accessories as per site requirement. | — | — | — | 40,871 | |
| — | 500.00 | — | — | ||
| Cutting of all types of platforms/road crossing and trenching and excavation to a width and depth of 300 mm x 300 mm, laying of DWC/HDPE/GI pipe in the trench and refilling and concreting it afterwards as per original condition. In hard rocky ground area , cables will be laid normally on layer of soft earth of 0.05 mtrs thickness previously deposited at bottom of the trench . The cutting to be filled and finished with cement/concrete, as per the RDSO drawing no.SDO/Cable laying/008, issued vide RDSO document no. RDSO/SI/G/2010 Version 1.1 dated 04.02.2014 or latest. | — | — | — | 79,405 | |
| — | 500.00 | — | — | ||
| Horizontal Boring/Manual moling without damage to surface road /track for laying/isertion of DWC/GI/HDPE pipe. The bore shall be done at the depth of minimum 1400 mm from the ground level. The ground level shall be considered ignoring the bank height of the bank of the road. Note:- DWC/HDPE/GI Pipe Supply is not covered under this item. Contactor shall provide all material required for work and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damage due to rough handling & pressure on cable. Payment of boring shall be made only after DWC/HDPE/GI pipe is laid in the bore. | — | — | — | 5,14,520 | |
| — | 6000.00 | — | — | ||
| Horizontal direction drilling (HDD)/Trenchless digging/machine drilling without damage to surface road /track for laying/ insertion of HDPE/GI/DWC pipe. The bore shall be done at the depth of minimum 1400 mm from the ground level. The ground level shall be considered ignoring the bank height of the bank of the road. Note: - DWC/HDPE/GI Pipe Supply is not covered under this item. Contactor shall provide all material required for work and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damage due to rough handling & pressure on cable. | — | — | — | 38,52,660 | |
| — | 75000.00 | — | — | ||
| Excavation of cable trench as per cable route plan, 1.2 Mtr. deep and of 0.3 Mtr. to 0.6 Mtr. wide at bottom as per RDSO sketch No. SDO/CABLE LAYING/003, issued vide RDSO document no. RDSO/SI/G/2010 Version 1.1 dated 04.02.2014 or latest, alongside the track in normal soil/strata (including soft rock), conforming to distances as per cable route plan and refilling and ramming of loose soil. This work includes clearing of route from bushes etc, covering of cable laid in trench by loose soil for a layer of 50mm thickness approximately. The work shall be done as per the extant practice on North Central Railway and instructions of Railway Engineer at site. In case 1.2 m depth of trench is not achievable due to site conditions, specific approval of JAG/SG Officer will be required for each site where trench depth of 1.2m is not possible, only after approval of JAG/SG Officer proportionate payment can be done. | — | — | — | 48,51,750 | |
| — | 4.00 | — | — | ||
| Supply of operator VDU of size 55 inch, 4K,industrial grade, HDMI/DVI connectivity, inbuilt speaker etc.(Make: Samsung/Sony/LG) (Inspection by Consignee) | — | — | — | 2,25,280 | |
| — | 1.00 | — | — | ||
| Supply, Installation, testing and Commissioning of on line UPS 5 KVA, with battery back up of minimum 4 hours, witrh battery trolley, of reputed make as APC/Uniline or similar. (Inspection by Consignee) | — | — | — | 1,31,519.14 | |
| — | 10.00 | — | — | ||
| Supply of basic material to construct unit maintenance free earth as per RDSO Specs. No RDSO/SPN/197 Ver. 1.0 or latest to achieve a resistance less than 1 ohm. It consists of following: (a) Copper bonded steel electrode of minimum 3.0 m long, minimum 17.0 mm dia with copper bonding thickness of minimum 250 microns and UL listed and marked = 1 no. (b) Earth enhancement material supplied in sealed bags of minimum 10 kg = 3 nos. (c) Copper strip of 150x25x6 mm, to terminate earth rod = 1 no. (d) Copper strip of 300x25x6 mm (MEEB) = 1 no. (e) Copper strip of 150x25x6mm (SEEB) = 1 no. (ii) Supply of 35 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting main earth electrode to MEEB in the equipment room in duplicate. (minimum 10 meter) (iii) Supply of 16 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting MEEB to SEEB and SPD to MEEB (minimum 10 meter) (iv) Supply of 10 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting various equipments to SEEB (v) Supply of copper lug sleeve for 3/16 cable. (Inspection by RDSO) | — | — | — | 1,80,425.2 | |
| — | 10.00 | — | — | ||
| Installation of Unit Maintenance Free Earth to achieve a resistance less than 1 ohm as supplied under item no. 13002 of Chapter 13 of SOR. It includes (i) Digging the earth to the required depth. (ii) Insertion of electrode. (iii) Filling of earth enhancing compound (Approx.30 Kg) (iv) Provision of exothermic weld connections to copper tape of 25 mm x 6 mm x 150 mm to the earth electrodes. All material tools and features required for weld will be arranged by contractor. (v) This also includes CC cover 1.5 ft x 1.5 ft. 1 ft wall thickness 2 inch with cover 3-inch thickness. Cables 35 Sq mm/ 16 Sq mm/10 sq mm for connecting earth to busbar, busbar to busbar and busbars to various equipments. Earth electrode of 17.20 mm dia and 3.00-meter-long high tensile low carbon steel circular rods molecularly bonded with copper and outer surface (minimum copper bonding thickness of 250 microns to made requirement of under writer's laboratories (UL) 467-2007 or latest. Copper strips of 150 mm x 25 mm x 6 mm to be welded with each earth electrode, copper strips of 300 mm x 25 mm x 6 mm for main equip- potential busbar, copper strips of 150 mm x 25 mm x 6 mm sub equip-potential busbar in relay room, power room and panel room. GI strip 25 mm x 2 mm for ring formation of earth pits Earth enhancement material in bags for each Earth Electrode. Inspection chamber of site 300 mm x 300 mm x 300 mm (Inside dimension) of approximate 50 mm thick with pulling hooks to cover the earth pits. Note: The installation of this item shall be carried out by the contractor as per RDSO Spec. No. RDSO/SPN/ 197 Ver 1.0 or latest. Typical RDSO approved drawings referred in the RDSO specification document are: (i) SDO/RDSO /E&B/001 for typical installation of Earth. (ii)SDO/RDSO/ E&B/002 for typical bonding and earthing connections, (iii) SDO/RDSO/ E&B/003 for typical arrangement for earth resistance measurements. | — | — | — | 71,931.7 | |
| — | 1.00 | — | — | ||
| Supply, Installation, Testing & Commissioning of Server Hardware for Video Management & Recording and all other required accessories to make the system operational for all the CCTV installed at LC gates, as per RDSO Specification RDSO/SPN/TC/65/ 2021Rev.6.0 with latest amendment. (Inspection by Consignee) | — | — | — | 2,70,959.83 | |
| — | 80.00 | — | — | ||
| Supply, Installation, Testing & Commissioning of Video Management & Video recording Software with License as per RDSO Specification RDSO/SPN/TC/65/2021 Rev 6.0 or latest amendment(Per camera Licence means Video Management (Viewing) at multiple locations such as Station, RPF Post & Server room by same license) etc. (Inspection by Consignee) | — | — | — | 3,57,356 | |
| — | 1.00 | — | — | ||
| Supply, Installation, Testing &Commissioning of Core Switch(20x10G SFP+ ports and additional minimum 4x10G base T/ SFP+ combo ports) as per RDSO Specification No RDSO/SPN/TC/65/2021 Version 6.0 or latest. (Inspection by Consignee) | — | — | — | 96,928.89 | |
| — | 100.00 | — | — | ||
| Supply of single mode single fiber 1G SFP module .as per RDSO specification no.RDSO/SPN/TC/65/2021. version-6 or latest Make- CISCO/ JUNIPER/ D-Link (Inspection by Consignee) | — | — | — | 3,29,978 | |
| — | 2.00 | — | — | ||
| Supply and insiallation of 16 TB Hardisk. Make: Seagate/Western digital/ Toshiba. (Inspection by Consignee) | — | — | — | 94,100 | |
| — | 2000.00 | — | — | ||
| Supply of STP CAT6 cable. Make: D-link/Tyco/Krone/Amp/Lark Nydia/ Molex. (Inspection by Consignee) | — | — | — | 76,600 | |
| — | 200.00 | — | — | ||
| Supply of patch cords LC-SC/SC-SC or as per site requirement- 3 Mtr. Make: D- Link/Finolex/Polycab/Lark Nydia. (Inspection by Consignee) | — | — | — | 27,650 | |
| — | 30.00 | — | — | ||
| Supply of CAT6 patch cord 5mtr. Make- D Link/Digisol/Molex/Lark Nydia. (Inspection by Consignee) | — | — | — | 2,924.7 | |
| — | 500.00 | — | — | ||
| Supply of RJ-45 connectors. Make- Digisol/Molex/D-Link/ Lark Nydia. (Inspection- Consingee) | — | — | — | 2,275 | |
| — | 65.00 | — | — | ||
| Supply of 6 point spike buster. Make : Anchor/Havells/Finolex or higher (Inspection by Consignee) | — | — | — | 69,781.4 | |
| — | 100.00 | — | — | ||
| Supply of SC/ST/FC/LC Single Mode Duplex Armoured Patch Cable of 05 meter Length. Make: D-Link/Digisol/Syrotech/Lark Nydia. (Inspection by Consignee) | — | — | — | 2,26,000 | |
| — | 100.00 | — | — | ||
| Supply of SC/ST/FC/LC Single Mode Duplex Armoured Patch Cable of 10 meter Length. Make: D-Link/Digisol/Syrotech/Lark Nydia. (Inspection by Consignee) | — | — | — | 2,61,000 | |
| — | 1.00 | — | — | ||
| Supply, Installation, testing & commissioning of external storage with (Hardware and Software) with minimum 240TB RAW usable storage capacity with all accessories as per clause 12.0 as per RDSO Specification No RDSO/SPN/TC/65/2021 Version 6.0 or latest. Make-CP Plus/Bosch/ Pelco or similar. (Inspection agency RDSO) | — | — | — | 9,58,967.23 | |
| — | 25.00 | — | — | ||
| Supply and installation of 19" 9U Rack. Make- Crotomak/ D-link/ Kenuco/Lark Nydia. (Inspection by RITES) | — | — | — | 5,18,664.5 | |
| — | 4.00 | — | — | ||
| Installation, testing and commissioning of large format display monitor unit 55 with all accessories and fixing materials required for this installation are to be supplied by contractor within the same cost | — | — | — | 7,916.36 | |
| — | 500.00 | — | — | ||
| Supply and Installation of PVC channel , with cover, of size 50 mm x 34 mm of 1 mm thickness. The installation to be done as per instructions of site in-charge. (Inspection by Consignee) | — | — | — | 64,855 | |
| — | 500.00 | — | — | ||
| Supply and Installation of PVC channel , with cover, of size 75 mm x 50 mm of 1.2 mm thickness. The installation to be done as per instructions of site in charge. (Inspection by Consignee) | — | — | — | 99,975 | |
| — | 60.00 | — | — | ||
| Supply of 48 fiber optical fiber cable straight joint enclosure (SJC) complete with all accessories along with enclosures with heat shrinkable splice protection sleeve as per RDSO spec. RDSO/SPN/TC68/2014 Revision 1.0, Amndt. 1.0 or latest. Splice losses in no case should be more than 0.1 dB. Make raychem/ fastball/ Aares (Inspection by RITES) | — | — | — | 11,10,947.4 | |
| — | 1000.00 | — | — | ||
| Splicing/dropping/termination of each fibre in the LIU/I0 Box/Terminal Joints through fusion splicing of termination of OFC cables. The fibres terminated shall be tested and the test report shall be submitted to the site Engineer for records . Each fibre shall be properly marked with necessary ferrules/tags. | — | — | — | 87,040 | |
| — | 20.00 | — | — | ||
| Supply of work station (All in one) for data input and configuration, simulation and functional testing, diagnostic and trouble shooting as per Annexure-1. (Inspection by RITES) | — | — | — | 31,34,181.2 | |
| — | 4.00 | — | — | ||
| Supply and Installation of Large Format display monitor 55" (4K) or Higher as per RDSO Specification No.RDSO/SPN/ TC/65/ 2019/Rev 5.0 or latest. Make: Samsung/ Sony/LG. (Inspection by Consignee) | — | — | — | 2,05,339.6 | |
| — | 1.00 | — | — | ||
| Supply and installation of 19" rack to house PA System and various equipment's withall the required accessories.Make- Crotomak/ D-link/ Kenuco/Lark Nydia. (Inspection by Consignee) | — | — | — | 31,301.27 | |
| — | 20.00 | — | — | ||
| Supply of fibre distribution management system (FDMS)/LIU for 24 fiber complete with all accessories with patch cord and pigtail. Make: D-Link/R&M/Raychem. (Inspection by Consignee) | — | — | — | 63,632.4 | |
| — | 20.00 | — | — | ||
| Installation and commissioning of fibre distribution management system (FDMS) for 24 fiber complete with all accessories. For Open word | — | — | — | 75,529.2 | |
| — | 12.00 | — | — | ||
| Supply of LC gate Master controller console as per Annexure-1. (Inspection by RITES) | — | — | — | 52,64,976 | |
| — | 20.00 | — | — | ||
| Supply and installation of OFC Based LC Gate Phone with gate closure detection & gate lock alarm as per Annexure-1. (Inspection by RITES) | — | — | — | 29,98,680 | |
| — | 20.00 | — | — | ||
| Supply and installation of IP PA at station for Gate open/close announcement as per Annexure-1. (Inspection by RITES) | — | — | — | 6,89,000 | |
| — | 20.00 | — | — | ||
| Supply and installation of Electrical Key transmitter as per Annexure-1. (Inspection by Consignee) | — | — | — | 3,21,800 | |
| — | 1.00 | — | — | ||
| Supply, Integration, Testing & Commissioning (SITC) of LC Gate Communication Application Module, fully interoperable with existing VoIP-based TCCS over SIP, with SNMPv3-enabled NMS integration and centralized voice logging through SIPREC, supporting secure signaling (TLS/SRTP), complete in all respects. (License for min 12 Master console and LC Phone-min 20 users) (Inspection by RITES) | — | — | — | 7,75,000 | |
| — | 12.00 | — | — | ||
| Installation of LC gate Master controller console | — | — | — | 1,41,600 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
AnnexureA.pdf
ATTACHMENT
Annexure-VA.pdf
ATTACHMENT
GuidelineforfillingofAnnexureVA.pdf
ATTACHMENT
GuidelinesforonlineBankGuaranteethroughIPAS.pdf
ATTACHMENT
BankDetail.pdf
ATTACHMENT
BidSecurity.pdf
ATTACHMENT
PaymentconditionAbove10Lakh.pdf
ATTACHMENT
GCCcorrectionslipPart1.pdf
ATTACHMENT
GCCcorrectionslipPart2.pdf
ATTACHMENT
GCCcorrectionslipPart3.pdf
ATTACHMENT
GCCcorrectionslip10.pdf
ATTACHMENT
GCCcorrectionslip11.pdf
ATTACHMENT
Tenderdocument2022.pdf
ATTACHMENT
Annexure-1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .