| 1 | L1₹9.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹14.8 L+₹4.9 L (49.2%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
19 Feb 2021, 3:00 pmClosed
Project Director
DRDA,Tenkasi
Improvements of 3 Ooranies (Maruthankinaru pt, Malayankulam pt, ) in Kuruvikulam Block in Package No.10 (SFC Dt.Pt/Block pt 2019-20) in Tenkasi District
2021_RDTN_195623_10
A2/6341/2019 SFC
Open Tender
Civil Works
Works
180 days
DRDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹15,000
DRDA,Tenkasi
4 Sept 2021
13 Feb 2021
19 Feb 2021
13 Feb 2021
19 Feb 2021
13 Feb 2021
15 Feb 2021
Amount
1.Improvements to the MEENATCHIPURAM ORANI in Meenatchipuram village of Maruthankinaru panchayat
Clearing and Grubbing Pond and channel width including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including and disposal of top Organic soil not exceeding 150mm in thickness as per Technical Specification.
Earthwork excavation in all soils except hard rock requiring blasting and conveying for the formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Construction of Inlet structures at MEENATCHIPURAM ORANI in Meenatchipuram village of Maruthankinaru panchayat
Earthwork excavation in all classes of Soils and Sub soils except hard rock requiring blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete
Dry Stone Random Rubble Masonry using required Rough stone including cost and conveyance of all materials to site and other labour charges etc., complete
Supply and erection Steel Centering for Sides and Soffits including necessary supports and structing for attaining plain surfaces in all concrete works including cost and conveyance of all materials to site, labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete
2.Improvements to the KALINGAL ORANI in Malayankulam panchayat
Clearing and Grubbing Pond and channel width including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including and disposal of top Organic soil not exceeding 150mm in thickness as per Technical Specification.
Earthwork excavation in all soils except hard rock requiring blasting and conveying for the formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Rehabilitation of Outlet Structures - Reconstruction of Weir at Kalingal Oorani in Malayankulam panchayat
Earthwork excavation in all classes of Soils and Sub soils except hard rock requiring blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete
Supply and erection Steel Centering for Sides and Soffits including necessary supports and structing for attaining plain surfaces in all concrete works including cost and conveyance of all materials to site, labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete
3.Improvements to the Therku Orani in Malayankulam Village and Panchayat
Clearing and Grubbing Pond and channel width including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including and disposal of top Organic soil not exceeding 150mm in thickness as per Technical Specification.
Earthwork excavation in all soils except hard rock requiring blasting and conveying for the formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Rehabilitation of Outlet Structures - Reconstruction of Weir at Terkku Orrani in Malayankulam and panchayat
Earthwork excavation in all classes of Soils and Sub soils except hard rock requiring blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete
Supply and erection Steel Centering for Sides and Soffits including necessary supports and structing for attaining plain surfaces in all concrete works including cost and conveyance of all materials to site, labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SEENIVASAN CONTRACTER
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .