Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.3 LAccepted-AOC M M I G B 96 RAMGANGA VIHAR PHASE 2 MORADABAD | MORADABAD | MORADABAD | UTTAR PRADESH | L1 | Accepted-AOC accepted | |
| 2 | L2₹11.9 L+₹52,347.87 (4.60%)Rejected-Finance C 691 PATEL NAGAR RAJENDRA NAGAR BAREILLY | L2 | Rejected-Finance Not Being L1 | |
| 3 | Rejected-Technical | - | Rejected-Technical Not Qualifed | |
| 4 | Rejected-Technical SITARGANJ UDHAM SINGH NAGAR | UDAM SINGH NAGAR | UTTARAKHAND | 244712 | - | Rejected-Technical Not Qualifed |
Tender Value
₹17.5 L
EMD Value
₹34,980
Closing Date
3 Jun 2023, 11:00 amClosed
EXECUTIVE ENGINEER
IRRIGATION DIVISION BAREILLY
Tehra nale ke km. 0.000 se km. 9.000 ke madhye safai ka karya
2023_UPIDC_806263_1
01/EE/2023-24
Open Tender
Civil Works
Item Rate
25 days
BAIGUL UTTRAKHAND
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
Yes
₹34,980
Yes
16 Oct 2023
29 May 2023
3 Jun 2023
29 May 2023
3 Jun 2023
29 May 2023
Amount
Earth work in silt clearance of drain including lift up to 1.5 meter and lead up to 30 meter by pocklane including cost of driver/asstt.driver, POL,maintenance of machine, contractor profit, taxes etc and extra for wet earth work excluding dewatering under water.
Cleaning thick bushes and thorny jungle without uprooting and its proper disposal.
Videography/photography of silt clearance work in Drain before,during and after silt clearance by Drone as per requirement including supply of videography/ photography in pen Drive and vehicles for movement as per direction of engineer in charge.
M/S OM BALA JEE CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .