Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.1 LAccepted-AOC 554 174 KA 1 CHHOTA BARHA ALAMBAGH LUCKNOW | LUCKNOW | LUCKNOW | UTTAR PRADESH | ₹72.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹77.9 LRejected-Finance | ₹77.9 L | L2 | Rejected-Finance L2 |
| 3 | L3₹81.2 LRejected-Finance CHANDAULI | UTTAR PRADESH | 221009 | ₹81.2 L | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical GRAM POST LAGUCHA DISTRICT LAKHIMPUR KHERI UTTAR PRADESH | KHERI | UTTAR PRADESH | 261501 | - | - | Rejected-Technical NOT QUALIFIED WITH TECHNICAL SPECIFICATION |
| 5 | Rejected-Technical | - | - | Rejected-Technical NOT QUALIFIED WITH TECHNICAL SPECIFICATION |
| Sl No | Description | Qty | Unit | M/S ARYAN ENTERPRISES L1 | MAMTA SHARMA CONTRACTOR CO BARABANKI L2 | ARVIND KUMAR SINGH L3 |
|---|---|---|---|---|---|---|
| 1.00 | Demolishing brick in cemet mortar including stacking of material within a distance of 60.0 M as per direction of Engineer-incharge. | 209 | CUM | 510 ₹1.1 L | 509.9 ₹1.1 L | 599 ₹1.3 L |
| 2.00 | Earth work in excavation in ordinary soil including Hard clay, chharri bajri up to 5% lead upto 30m & lift Upto 1.50m with Manual Compaction & dressing and getting out and disposal of excavated earth. | 600 | CUM | 97 ₹58,200 | 99.9 ₹59,940 | 109 ₹65,400 |
| 3.00 | Providing and laying in position plain cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : M-15 | 36 | CUM | 8,800 ₹3.2 L | 9,990.9 ₹3.6 L | 10,249 ₹3.7 L |
| 4.00 | Providing and laying in position R.C.C of specified grade M-25 including all but excluding the cost of reinforcement, centering and shuttering etc,. | 83.84 | CUM | 9,500 ₹8.0 L | 10,990.9 ₹9.2 L | 11,090 ₹9.3 L |
| 5.00 | Providing and laying in position plain cement concrete with minimum temperature reinforcement(0.15%) of specified grade including all but excluding the cost of reinforcement, centering and shuttering M-20 | 185.97 | CUM | 8,600 ₹16.0 L | 9,850.9 ₹18.3 L | 10,109 ₹18.8 L |
| 6.00 | Supply and fixing TMT steel bar with Bending, Binding, cutting and placing in position reinforcement including cost of binding wire etc. | 6,801 | KG | 64 ₹4.4 L | 69.9 ₹4.8 L | 74.9 ₹5.1 L |
| 7.00 | Providing and fixing of centering & shuttering including all cost of material labour etc,. | 817.64 | SQM | 540 ₹4.4 L | 409.9 ₹3.4 L | 629.9 ₹5.2 L |
| 8.00 | providing and laying flexible apron with mirzapur stone boulder including all cost of material labour t&p etc complete. | 108.75 | CUM | 4,530 ₹4.9 L | 5,290.9 ₹5.8 L | 5,340 ₹5.8 L |
| 9.00 | Relaying of Mirzapur stone boulder in slope pitching of river side including all cost. | 453.2 | CUM | 350 ₹1.6 L | 399.9 ₹1.8 L | 399.9 ₹1.8 L |
| 10.00 | Providing & laying of Mirzapur stone boulder in slope pitching of Country side including all cost. | 453.2 | CUM | 4,806 ₹21.8 L | 5,690.9 ₹25.8 L | 5,699.99 ₹25.8 L |
Tender Value
Refer Docs
EMD Value
₹1.8 L
Closing Date
13 Mar 2026, 2:00 pmClosed
SUPERINTENDING ENGINEER
O/O XITH CIRCLE IRRIGATION WORKS AYODHYA
NIT06 LOT15
2026_UPIDC_1122365_15
06/SE-XI/2025-26
Open Tender
Civil Works
90 days
BARABANKI
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,719
₹1.8 L
O/O XITH CIRCLE IRRIGATION WORKS AYODHYA
8 Apr 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
7 Mar 2026
Demolishing brick in cemet mortar including stacking of material within a distance of 60.0 M as per direction of Engineer-incharge.
Earth work in excavation in ordinary soil including Hard clay, chharri bajri up to 5% lead upto 30m & lift Upto 1.50m with Manual Compaction & dressing and getting out and disposal of excavated earth.
Providing and laying in position plain cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : M-15
Providing and laying in position R.C.C of specified grade M-25 including all but excluding the cost of reinforcement, centering and shuttering etc,.
Providing and laying in position plain cement concrete with minimum temperature reinforcement(0.15%) of specified grade including all but excluding the cost of reinforcement, centering and shuttering M-20
Supply and fixing TMT steel bar with Bending, Binding, cutting and placing in position reinforcement including cost of binding wire etc.
Providing and fixing of centering & shuttering including all cost of material labour etc,.
providing and laying flexible apron with mirzapur stone boulder including all cost of material labour t&p etc complete.
Relaying of Mirzapur stone boulder in slope pitching of river side including all cost.
Providing & laying of Mirzapur stone boulder in slope pitching of Country side including all cost.
Supplying and Laying Geo textile sheet 200 GSM made with woven multifilament polypropyline yarn below boulder pitching including all material, labour, T&P etc.required for proper completion of work.
E/W in filling for making earth cushion over Geo Textile sheet below boulder pitching including all cost.
Providing/fixing 75 mm dia pipe in weep hole
Laying Graded Filter
Crushed stone grit
Coarse Sand
S/Febricating/Fixing flap type steel gate
Finishing walls with cement washing with portland cement slurry two coat including all labour material and T&P. etc
Dewatering
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
techsummary_2089912.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_2089912.xls
BOQ • 0.36 MB
lot15document.pdf
Tender Documents • 3.02 MB
Download all tender documents and submit your bid