| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.3 LAccepted-AOC | 1 | Accepted-AOC Lowest 1 | |
| 2 | 2₹5.9 L+₹55,122 (10.4%)Rejected-AOC 99B4 WEST MAIN ROAD CAUVERY NAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | 2 | Rejected-AOC Lowest 2 | |
| 3 | 3₹6.0 L+₹66,402.53 (12.5%)Rejected-AOC 86 B INDIRA NAGAR METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | 3 | Rejected-AOC Lowest 3 | |
| 4 | Not Admitted-Fee/PreQual/Technical 35 17 A 21 MADILINE BACKSIDE SALEM CAMP PO METTUR DAM 636 456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M.SARAVANAN CONTRACTOR L1 | SSRAJA ENGINEERING PRIVATE LIMITED L3 | G S SRINIVASA ENTERPRISES PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|
| 1.00 | Cleaning the columns, walls, beams inside the cell, thoroughly scrapping with necessary steel strips, brooms, wire brush etc., washing and cleaning with water jet including providing safety helmets, safety belt, necessary scaffolding arrangements as directed by the Engineer at site, including all labour charges, cost of scaffolding arrangements, charges towards safety appliances, charges towards pumping & water jet arrangements, cost of all T & P ‘s, cost of scrapping tools, all lead & lift etc., complete. | 6,331 | 1 m² (One Square Meter) | 19 ₹1,20,289 Lowest | 21.5 ₹1,36,116.5 | 21 ₹1,32,951 |
| 2.00 | Cleaning the inside wall surface of stack at an average height of 15 m from ground level including providing hanging scaffolding arrangements or any other alternate safe and suitable scaffolding arrangements as approved by Engineer at site and supplying the labour with necessary safety appliances like safety belt, helmet, face mask etc., cleaning the surface with water jet , including cost of all materials, all lead, lift, charges for scaffolding arrangements, cost of scrapping tools, charges towards safety appliances and watering arrangements, all lead, lift etc., complete. | 2,375 | 1 m² (One Square Meter) | 28.5 ₹67,687.5 Lowest | 32.5 ₹77,187.5 | 32 ₹76,000 |
| 3.00 | Cleaning the accumulated silt and algae deposit in the drift eliminators with wire brush, steel strips, brooms etc., without damaging the drift eliminators, cleaning with water jet including providing necessary scaffolding arrangements & platform for standing and stacking the drift eliminators including the cost of all labour charges, cost of scaffolding arrangement, charges towards safety appliances, cost of scrapping tools, charges towards pumping and water jet arrangements, all lead, lift etc ., complete | 2,628 | 1 m² (One Square Meter) | 67 ₹1,76,076 Lowest | 76.5 ₹2,01,042 | 75 ₹1,97,100 |
| 4.00 | Cleaning the columns, beams, louvers, fill bars on the outside of the cell thoroughly scrapping with necessary steel strips, brooms, wire brush etc including providing safety helmets, safety belt, necessary scaffolding arrangements as directed by the Engineer at site, including all labour charges, cost of scaffolding arrangements, charges towards safety appliances, cost of all T & P‘s, cost of scrapping tools, all lead & lift etc., complete. | 6,591 | 1 m² (One Square Meter) | 14.5 ₹95,569.5 Lowest | 16.3 ₹1,07,433.3 | 16 ₹1,05,456 |
| 5.00 | Dewatering of Cold water basins using pumps of required capacities including Hire charges for pump sets , transporting charges of pump set, cost of all required accessories and installing the pump set at site for dewatering work ,labour charges for operating the pump set , cost of pump accessories replaced/used, dismantling charges of pump with required accessories on completion of work, including cost of all labour charges, all lead & lifts, all T&P ‘s etc., complete | 10,857 | 1 m² (One Square Meter) | 3 ₹32,571 Lowest | 3.06 ₹33,222.42 | 3 ₹32,571 Lowest |
| 6.00 | Removal of silt and slush in the cold water basin using basket and vessels and lifting from basin to ground level by manually and then disposing the same away from site with a lead of 1km including the cost of all materials, watering arrangements, all labour charges, all lead & lift, and arresting the leak water from top log gate using gunny bags etc., complete. | 311 | 1 m³ (One Cubic Meter) | 2.5 ₹777.5 Lowest | 3.06 ₹951.66 | 3 ₹933 |
| 7.00 | Cleaning the surface of the submerged Columns, side walls, Floor of the cold water basin with water jet including the cost of all materials, watering arrangements, all labour charges, all lead & lift, etc., complete. | 5,263 | 1 m² (One Square Meter) | 6.5 ₹34,209.5 Lowest | 7.05 ₹37,104.15 | 7 ₹36,841 |
| 8.00 | Supplying and filling of the empty gunny bags with filling sand, stitching them intact, conveyance to site, placing/packing them at gate grooves for arresting leakage of water in front of C.T sump including cost of all materials, all lead & lifts, all labour charges etc., complete. | 75 | 1 Bag (One Bag) | 52 ₹3,900 Lowest | 59 ₹4,425 | 58 ₹4,350 |
Tender Value
Refer Docs
EMD Value
₹5,400
Closing Date
25 Aug 2025, 2:00 pmClosed
Chief Engineer / MTPS I
Office of the CE / MTPS I / Mettur Dam
MTPS I Civil Circle Annual Over haul 2025-26 Cleaning of columns, Beams, drift eliminators, louvers and stacks in cooling tower cells including removal of silt/slush in cold water basin in Cooling tower IV
2025_EB_591630_1
CE / MTPS-I / SE/ CIVIL / OT.NO.38 / 2025-26
Open Tender
Civil Works
Works
15 days
Mettur Thermal Power Station I / Mettur Dam
As per Tender Specification
2 documents required · 2 mandatory
₹0
₹5,400
Yes
20 Sept 2025
11 Aug 2025
26 Aug 2025
11 Aug 2025
25 Aug 2025
11 Aug 2025
Amount
Cleaning the columns, walls, beams inside the cell, thoroughly scrapping with necessary steel strips, brooms, wire brush etc., washing and cleaning with water jet including providing safety helmets, safety belt, necessary scaffolding arrangements as directed by the Engineer at site, including all labour charges, cost of scaffolding arrangements, charges towards safety appliances, charges towards pumping & water jet arrangements, cost of all T & P ‘s, cost of scrapping tools, all lead & lift etc., complete.
Cleaning the inside wall surface of stack at an average height of 15 m from ground level including providing hanging scaffolding arrangements or any other alternate safe and suitable scaffolding arrangements as approved by Engineer at site and supplying the labour with necessary safety appliances like safety belt, helmet, face mask etc., cleaning the surface with water jet , including cost of all materials, all lead, lift, charges for scaffolding arrangements, cost of scrapping tools, charges towards safety appliances and watering arrangements, all lead, lift etc., complete.
Cleaning the accumulated silt and algae deposit in the drift eliminators with wire brush, steel strips, brooms etc., without damaging the drift eliminators, cleaning with water jet including providing necessary scaffolding arrangements & platform for standing and stacking the drift eliminators including the cost of all labour charges, cost of scaffolding arrangement, charges towards safety appliances, cost of scrapping tools, charges towards pumping and water jet arrangements, all lead, lift etc ., complete
Cleaning the columns, beams, louvers, fill bars on the outside of the cell thoroughly scrapping with necessary steel strips, brooms, wire brush etc including providing safety helmets, safety belt, necessary scaffolding arrangements as directed by the Engineer at site, including all labour charges, cost of scaffolding arrangements, charges towards safety appliances, cost of all T & P‘s, cost of scrapping tools, all lead & lift etc., complete.
Dewatering of Cold water basins using pumps of required capacities including Hire charges for pump sets , transporting charges of pump set, cost of all required accessories and installing the pump set at site for dewatering work ,labour charges for operating the pump set , cost of pump accessories replaced/used, dismantling charges of pump with required accessories on completion of work, including cost of all labour charges, all lead & lifts, all T&P ‘s etc., complete
Removal of silt and slush in the cold water basin using basket and vessels and lifting from basin to ground level by manually and then disposing the same away from site with a lead of 1km including the cost of all materials, watering arrangements, all labour charges, all lead & lift, and arresting the leak water from top log gate using gunny bags etc., complete.
Cleaning the surface of the submerged Columns, side walls, Floor of the cold water basin with water jet including the cost of all materials, watering arrangements, all labour charges, all lead & lift, etc., complete.
Supplying and filling of the empty gunny bags with filling sand, stitching them intact, conveyance to site, placing/packing them at gate grooves for arresting leakage of water in front of C.T sump including cost of all materials, all lead & lifts, all labour charges etc., complete.
G S SRINIVASA ENTERPRISES PRIVATE LIMITED (BID ID -1438792)
SSRAJA ENGINEERING PRIVATE LIMITED (BID ID -1438786)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .