| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-AOC | ₹10.9 L Quoted ₹11.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹12.7 LRejected-AOC TUTICORIN | TUTICORIN | TAMIL NADU | 626202 | ₹12.7 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | RAMESH ENGIEERING CONTRACTOR | SMU ENTERPRISES |
|---|---|---|---|---|---|
| 1.00 | Charges for transportation of required sizes beams and M.S plate, fabrication and erection of wall in the bunker, including charges for transporting cost of consumables like cutting gas, welding electrodes and hire charges for T&Ps. | 4.56 | Tons | 5,73,569.1 ₹6.8 L | 5,27,939.1 ₹6.2 L |
| 2.00 | Charges for providing temporary platform outside the bunkers and window cutting of the bunker to make access to lift and lead the required materials and dismantling after completion of works. | 1 | No | 32,000 ₹37,760 | 27,500 ₹32,450 |
| 3.00 | Charges for providing required scaffolding and temporary platform at bunkers of 19 EL to 30 EL and dismantling after completion of work including charges for T&Ps hire charges for scaffolding, temporary platform and cost of consumables. | 1 | No | 1,00,000 ₹1.2 L | 95,400 ₹1.1 L |
| 4.00 | Charges for cutting and removing the existing damaged and worn out bunker wall support beams and M.S plates and devolution to stores as scrap including cost of cutting gas, T&P hire charges and transporting charges. | 3.5 | Tons | 1,75,000 ₹2.1 L | 1,57,500 ₹1.9 L |
| 5.00 | Charges for painting of bunker with one coat of red oxide primer and two coat of gray enamel paint including cost of paint & consumables. | 64 | SqM | 14,080 ₹16,614.40 | 12,160 ₹14,348.80 |
| 5.10 | Cost of materials (Contractors Scope)
12 mm Thick MS Plate | 3.9 | Tons | 3,27,600 ₹3.9 L | 3,04,200 ₹3.6 L |
| 5.20 | Cost of materials (Contractors Scope)
T Beam 200 x 180 x 8.6 mm | 663 | Kg | 49,725 ₹58,675.50 | 43,095 ₹50,852.10 |
Tender Value
Refer Docs
EMD Value
₹9,700
Closing Date
5 Jan 2026, 2:00 pmClosed
CE/TTPS
O/o CE/TTPS
TTPS Operation Circle MPM I Unit II Rectification of wornout bunker vertical wall in south side of Bunker 2E
2025_EB_635133_1
CE/SE/O/TTPS/Spec.No.274/25-26
Open Tender
Miscellaneous Works
25 days
TTPS
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹9,700
Yes
25 Mar 2026
22 Dec 2025
6 Jan 2026
22 Dec 2025
5 Jan 2026
22 Dec 2025
Charges for transportation of required sizes beams and M.S plate, fabrication and erection of wall in the bunker, including charges for transporting cost of consumables like cutting gas, welding electrodes and hire charges for T&Ps.
Charges for providing temporary platform outside the bunkers and window cutting of the bunker to make access to lift and lead the required materials and dismantling after completion of works.
Charges for providing required scaffolding and temporary platform at bunkers of 19 EL to 30 EL and dismantling after completion of work including charges for T&Ps hire charges for scaffolding, temporary platform and cost of consumables.
Charges for cutting and removing the existing damaged and worn out bunker wall support beams and M.S plates and devolution to stores as scrap including cost of cutting gas, T&P hire charges and transporting charges.
Charges for painting of bunker with one coat of red oxide primer and two coat of gray enamel paint including cost of paint & consumables.
Cost of materials (Contractors Scope) 12 mm Thick MS Plate
Cost of materials (Contractors Scope) T Beam 200 x 180 x 8.6 mm
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_760071.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid