Tender Value
₹2.3 L
EMD Value
₹11,400
Closing Date
27 Aug 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
CONSTRUCTION OF PUBLIC PARK NEAR JAMIA MASJID SHARIEF POSHKER(MAIN JAMIA)
2026_RDPR_319621_81
NIT_34_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
KHAG
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer REW Budgam
₹11,400
11 Oct 2026
5 Aug 2026
28 Aug 2026
5 Aug 2026
27 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Trench excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m 2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 14.87 | Cum | 479.3 | ₹7,127.19 |
| 2 | Supply and Spreading of Boulders/GSB Filling under Floors including watering and ramming with hand rammed. | 3.79 | Cum | 1,265 | ₹4,794.35 |
| 3 | P/L in position cement concrete of M10 Grade including curing but excluding the cost of centering and shuttering. All work upto plinth level (1 Cement :3 F.A.(Natural/M-Sand) :6 C.A. ) with 20mm aggregate | 10.2 | Cum | 5,733.4 | ₹58,480.68 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. | 37.17 | Sqm | 286.35 | ₹10,643.63 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platforms. | 27.88 | Sqm | 718 | ₹20,017.84 |
| 6 | Providing and laying in position M-15 grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 5.94 | Cum | 7,104 | ₹42,197.76 |
| 7 | Providin & Assembling Steel reinforcement (HYSD Bars) for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 594 | kg | 115 | ₹68,310 |
| 8 | carriage of sand and stone aggregate for an avg lead of 35 km | 21.8 | Cum | 525 | ₹11,445 |
| 9 | add provision for cost of photographs, Citizen Information Board & other unforseen items (to be paid as per actual) and lumsum items ( to be paid as per details given in the bill | 1 | Job | 4,984 | ₹4,984 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.11 MB
BOQ_1059366.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .