| 1 | L1₹4.3 CrAccepted-AOC NEAR KATI CHAURAHA HUZURPUR ROAD BAHRAICH | BAHRAICH | UTTAR PRADESH | 271801 | ₹4.3 Cr | L1 | Accepted-AOC LOWEST |
| 2 | L2₹4.5 Cr+₹26.1 L (6.13%)Rejected-Finance | ₹4.5 Cr+₹26.1 L (6.13%) | L2 | Rejected-Finance HIGH RATE BIDDER |
| 3 | L3₹4.7 Cr+₹45.8 L (10.8%)Rejected-Finance | ₹4.7 Cr+₹45.8 L (10.8%) | L3 | Rejected-Finance HIGH RATE BIDDER |
| 4 | Rejected-Technical 0 BAGHI NAUGARH NAUGARH CHANDAULI UTTAR PRADESH 232111 | CHANDAULI | UTTAR PRADESH | 232111 | - | - | Rejected-Technical TECHNICALLY UNFIT |
| 5 | Rejected-Technical UTTAR PRADESH | - | - | Rejected-Technical TECHNICALLY UNFIT |
Tender Value
Refer Docs
EMD Value
₹9.7 L
Closing Date
2 Feb 2023, 12:00 pmClosed
SE IX CIRCLE I.W. BAHRAICH
OFFICE OF THE SE IX CIRCLE I.W. BAHRAICH
ANTI EROSION WORK OF VILLAGE GROUP LAXMANPUR BHAGWANPUR (LAXMANPUR KOTHI), PARSA DEHRIYA BETWEEN KM. 0.100 - 0.650 AT D/S LEFT BANK OF RAPTI RIVER BARRAGE DISTRICT-SHRAWASTI.
2023_UPIDC_769455_9
04/SE/NAVAM/2022-23
Open Tender
Civil Works
Item Rate
120 days
BHINGA SHRAWASTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹9.7 L
30 Apr 2023
27 Jan 2023
2 Feb 2023
27 Jan 2023
2 Feb 2023
27 Jan 2023
Amount
Earth work including lead upto 30M & Lift upto 1.5 M, excluding mechanical compaction but including manual compaction and dressing to profile including all lift rates shall be applicable as per direction of Engineer in charge. including cost of all material, labour, T&P etc.
Supplying and laying of EC Bag (New) Filled with RBM, striching with sutali,Machine Weaving and dumping in Nylon Crate (Size 1x1x1 m. & mesh size 200x200 mm) including cost of all material, labour, T&P etc. and all Taxes as per direction of Engineer in charge.
Supply and Laying Geotextile sheet made of 200 gsm woven multifilament polypropylene yarn Below Boulder Pitching including cost of all material, labour & T&P etc. all tax's as per direction of Engineer in charge.
Supply and Laying Stone Boulder 20-60 Kg. in Slope Pitching without wire crate including Stacking of Boulder in stock yard including cost of all material, labour and T&P etc and all tax's
Supply and Dumping/Laying Stone Boulder 20-60 Kg. in Launching Apron in without crate including Stacking of Boulder in stock yard including cost of all material, labour and T&P etc and all tax's
Supply and Dumping/Laying Stone Boulder 20-60 Kg in Launching apron in wire crates size 1.5x1.0x1.20 M. including Stacking of Boulder in stock yard, all lead, lift, labour, T&P and cost of all material and all tax's.
M/S CONSTRUCTION NETWORK INDIA
M/S ASTHA ASSOCIATES ENGINEER AND CONTRACTORS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .