Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.3 CrAdmitted-Finance | -2.17% | ₹4.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.3 Cr+₹5.1 L (1.20%)Admitted-Finance | -1.00% | ₹4.3 Cr+₹5.1 L (1.20%) | L2 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹8.8 L
Closing Date
22 Apr 2026, 6:00 pmClosed
EXECUTIVE ENGINEER RandB LOLAB
EXECUTIVE ENGINEER RandB LOLAB
Upgradation Widening of Darpora Sogam road via Margi Along with Drain .
2026_PWDJK_307744_1
NIT 05
Open Tender
Civil Works
Item Rate
720 days
Lolab
Please refer Tender documents.
10 documents required · 10 mandatory
₹5,500
Executive enginner RnB Lolab
₹8.8 L
30 Apr 2026
11 Apr 2026
23 Apr 2026
11 Apr 2026
22 Apr 2026
11 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part A Pavement:
Excavating, supplying and filling of local earth (including royalty)by mechanical transport also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. incl carriage of material upto 15 km, incl rolling consolidation charges with PRR | - | cum | - | - |
| 2 | P/L of GSB in 15cm layers incl consolidation, rolling with road roller of 8 ton capacity incl all carriage of material from source to SOW. | - | cum | - | - |
| 3 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base
course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge | - | cum | - | - |
| 4 | Providing and applying tack coat using hot straight run bitumen of grade – VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. On W.B.M. @ 0.75 Kg/sqm. | - | sqm | - | - |
| 5 | Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-Charge. 50 mm average compacted thickness with bitumen of grade VG-10 @ 3.5% (percentage by weight of total mix) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity. | - | cum | - | - |
| 6 | Providing and laying semi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. 25 mm compacted thickness with bitumen of grade VG- 10 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity. | - | sqm | - | - |
| 7 | Providing and laying seal coat of premixed fine aggregate (passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG-10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road all complete. | - | sqm | - | - |
| 8 | P/L of Khak Bajree in berms incl. rolling all complete job. | - | cum | - | - |
| 9 | Part B Toe Wall:
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides
and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | - | cum | - | - |
| 10 | Providing & laying of Dry stone soling incl: hand packing & ramming including all carriages upto site of work complete. | - | cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
Tendernotice_2.pdf
PDF • 1.14 MB
BOQ_998147.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .