Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.6 LAccepted-AOC | ₹13.6 L | L1 | Accepted-AOC Lowest I |
| 2 | L2₹15.4 L+₹1.8 L (13.1%)Rejected-Finance | ₹15.4 L+₹1.8 L (13.1%) | L2 | Rejected-Finance Lowest II |
| 3 | L3₹17.1 L+₹3.5 L (25.4%)Rejected-Finance | ₹17.1 L+₹3.5 L (25.4%) | L3 | Rejected-Finance Lowest III |
| 4 | L4₹17.4 L+₹3.7 L (27.3%)Rejected-Finance | ₹17.4 L+₹3.7 L (27.3%) | L4 | Rejected-Finance Lowest IV |
| 5 | L5₹17.5 L+₹3.9 L (28.5%)Rejected-Finance | ₹17.5 L+₹3.9 L (28.5%) | L5 | Rejected-Finance Lowest V |
| Sl No | Description | Qty | Unit | SUNIL KUMAR L7 | HINWAR CONSTRUCTION CO L5 | VISHALA CIVIL CONTRACTORS AND MAINTENANCE L2 | dinesh kumar contractor L4 | A.S.Technology L1 | M/S VIPIN KUMAR CONTRACTOR L6 | M/S MOHD AKRAM S/O VAHAJUDDIN L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in exavation in foundation in ordinary soil including 1.5m lift and 30 m lead and including dressing, compaction etc. Complete | 280 | M3 | 50 ₹14,000 | 40 ₹11,200 | 45 ₹12,600 | 65 ₹18,200 | 25 ₹7,000 Lowest | 50 ₹14,000 | 52.65 ₹14,742 |
| 2.00 | Providing centering and shuttering for CC i/c all cost of material, laobur etc. complete. | 280 | M2 | 450 ₹1,26,000 | 411 ₹1,15,080 | 500 ₹1,40,000 | 400 ₹1,12,000 | 185 ₹51,800 Lowest | 350 ₹98,000 | 554.85 ₹1,55,358 |
| 3.00 | Laying of Cement concrete 1:3:6 including cost of all material, labour and T&P etc complete | 57 | M3 | 4,200 ₹2,39,400 | 3,903.2 ₹2,22,482.4 | 3,600 ₹2,05,200 | 3,500 ₹1,99,500 | 3,074 ₹1,75,218 Lowest | 4,400 ₹2,50,800 | 3,952.5 ₹2,25,292.5 |
| 4.00 | Supplying & Laying Cement concrete M-20 or cc 1:1.5:3 in raft including cost of all material, labour T &P etc complete | 85 | M3 | 5,100 ₹4,33,500 | 5,255.55 ₹4,46,721.75 | 4,500 ₹3,82,500 | 5,400 ₹4,59,000 | 4,478 ₹3,80,630 Lowest | 5,700 ₹4,84,500 | 5,008.5 ₹4,25,722.5 |
| 5.00 | Supplying & Laying Cement concrete M-25 or cc 1:1:2 in R/Wall and wearing coat including cost of all material, labour T &P etc complete | 117 | M3 | 6,300 ₹7,37,100 | 5,865.75 ₹6,86,292.75 | 5,100 ₹5,96,700 | 5,900 ₹6,90,300 | 4,378 ₹5,12,226 Lowest | 6,000 ₹7,02,000 | 5,724.9 ₹6,69,813.3 |
| 6.00 | supplying and laying Reinforcement bars including cutting, bending of bars all cost of material, labour T&P etc.complete. | 2 | MT | 61,000 ₹1,22,000 | 62,984 ₹1,25,968 | 46,000 ₹92,000 Lowest | 61,000 ₹1,22,000 | 60,034 ₹1,20,068 | 50,000 ₹1,00,000 | 51,017 ₹1,02,034 |
| 7.00 | Laying brick Pitching work first class in 1:4 cement & sand mortar including cost of all Material, Labour, T&P etc complete. (Per Cum) | 19 | M3 | 4,000 ₹76,000 | 4,680 ₹88,920 | 3,900 ₹74,100 | 4,550 ₹86,450 | 4,122 ₹78,318 | 4,500 ₹85,500 | 3,791.2 ₹72,032.8 Lowest |
| 8.00 | Providing & fixing 50mm dia PVC pipe including cost of all Material, Labour, T&P etc Complete. | 3 | Rm. | 180 ₹540 | 250 ₹750 | 75 ₹225 Lowest | 250 ₹750 | 120 ₹360 | 100 ₹300 | 202.5 ₹607.5 |
| 9.00 | Supplying/ Laying Boulder 20 to 40kg in launching apron and u/s floor including cost of all Material, Labour, T&P etc Complete. | 19 | M3 | 1,310 ₹24,890 Lowest | 1,872 ₹35,568 | 1,350 ₹25,650 | 1,800 ₹34,200 | 1,399 ₹26,581 | 1,600 ₹30,400 | 1,517 ₹28,823 |
| 10.00 | Laying graded filter below CC block and pitching in launching apron including cost of all Material, Labour, T&P etc Complete. | 11 | M3 | 1,150 ₹12,650 | 1,673 ₹18,403 | 1,200 ₹13,200 | 1,200 ₹13,200 | 999 ₹10,989 Lowest | 1,500 ₹16,500 | 1,355.8 ₹14,913.8 |
Tender Value
₹21.1 L
EMD Value
₹43,000
Closing Date
25 Feb 2026, 12:00 pmClosed
Executive Engineer
EGCCD6 Najibabad
Construction of Fall at Km. 15.115 of Kotra Distributary.
2026_UPIDC_1117767_2
07/EE/2025-26
Open Tender
Civil Works - Canal
Item Wise
21 days
Najibabad
Please refer tender documents
2 documents required · 2 mandatory
₹354
₹43,000
17 Mar 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
19 Feb 2026 - 25 Feb 2026
Earth work in exavation in foundation in ordinary soil including 1.5m lift and 30 m lead and including dressing, compaction etc. Complete
Providing centering and shuttering for CC i/c all cost of material, laobur etc. complete.
Laying of Cement concrete 1:3:6 including cost of all material, labour and T&P etc complete
Supplying & Laying Cement concrete M-20 or cc 1:1.5:3 in raft including cost of all material, labour T &P etc complete
Supplying & Laying Cement concrete M-25 or cc 1:1:2 in R/Wall and wearing coat including cost of all material, labour T &P etc complete
supplying and laying Reinforcement bars including cutting, bending of bars all cost of material, labour T&P etc.complete.
Laying brick Pitching work first class in 1:4 cement & sand mortar including cost of all Material, Labour, T&P etc complete. (Per Cum)
Providing & fixing 50mm dia PVC pipe including cost of all Material, Labour, T&P etc Complete.
Supplying/ Laying Boulder 20 to 40kg in launching apron and u/s floor including cost of all Material, Labour, T&P etc Complete.
Laying graded filter below CC block and pitching in launching apron including cost of all Material, Labour, T&P etc Complete.
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.36 MB
tn7lot2.pdf
Tender Documents • 1.40 MB
BOQ_2077140.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .