Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.1 LAccepted-AOC 00 SALIK RAM SHUKLA PANT NAGAR NEAR KASHIRAM PASHCHIMI PARED SARKAR GONDA | GONDA | GONDA | UTTAR PRADESH | ₹24.1 L | L1 | Accepted-AOC First Lowest |
| 2 | L2₹24.2 LRejected-AOC | ₹24.2 L | L2 | Rejected-AOC Second Lowest |
| 3 | L3₹24.3 LRejected-AOC | ₹24.3 L | L3 | Rejected-AOC Third Lowest |
| 4 | L4₹24.6 LRejected-AOC | ₹24.6 L | L4 | Rejected-AOC Fourth Lowest |
| 5 | Rejected-Technical | - | - | Rejected-Technical All Document not upload |
Tender Value
₹24.9 L
EMD Value
₹50,000
Closing Date
30 Apr 2026, 2:00 pmClosed
Project Manager Unit 11
05/17/17, Acharya Narendra Dev Nagar, Deokali Road, Ayodhya
PROPOSED CONSTRUCTION OF TOILET BLOCK AT GOVERNMENT ITI SULTANPUR DISTRICT SULTANPUR
2026_UPPRC_1139344_1
01/2026-27/PCL/UNIT-11/Ayodhya
Open Tender
Civil Works
180 days
Sultanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹50,000
29 May 2026
20 Apr 2026
30 Apr 2026
20 Apr 2026
30 Apr 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | HANDICAPPED TOILET
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | - | cum | - | - | item1 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | - | cum | - | - | item2 |
| 3 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | - | cum | - | - | item3 |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | cum | - | - | item4 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | - | cum | - | - | item5 |
| 6 | RCC UPTO PL
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - | item6 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (Columns) | - | cum | - | - | item7 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (Plinth Beam) | - | cum | - | - | item8 |
| 9 | RCC ABOVE PL
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - | item9 |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). Lintels | - | cum | - | - | item10 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
toiletblockbid.pdf
Tender Documents • 3.26 MB
BOQ_2127075.xls
BOQ • 0.49 MB
Download all tender documents and submit your bid