| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 CrAdmitted-Finance | +0.00% | ₹3.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.5 CrAdmitted-Finance | +2.00% | ₹3.5 Cr | L2 | Admitted-Finance |
Tender Value
₹3.4 Cr
EMD Value
₹6.8 L
Closing Date
9 Jun 2026, 1:00 pmClosed
EXECUTIVE ENGINEER
EE CD BUND-02 BANDA
CONSTRUCTION WORK FOR THE RESIDENTIAL BUILDINGS OF THE NEWLY ESTABLISHED KALYANPUR POLICE CHAUKI ,AT KALYANPUR VILLAGE MANIKPUR IN DISTRICT. CHITRAKOOT
2026_UPHDB_1146636_1
180/BUND Circle/AC-03/02 Dated- 07.05.2026
Open Tender
Civil Works
Percentage
456 days
KALYANPUR, MANIKPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,080
EE CD BUND-02 BANDA
₹6.8 L
Yes
12 Jun 2026
8 May 2026
9 Jun 2026
8 May 2026
9 Jun 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. 2.6.1 All kinds of soil | 725.46 | Cum | 133.11 | ₹96,565.98 |
| 2 | Earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including getting out & disposal of excavated earth upto 1.5m as directed by Engineer in charge All kind of soil. In all kind of soil upto 1.5m to 3.0m. depth | 55.64 | Cum | 228.2 | ₹12,697.05 |
| 3 | Earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including getting out & disposal of excavated earth upto 1.5m as directed by Engineer in charge All kind of soil. In all kind of soil upto 3 m to 4.5 m. depth | 18.71 | Cum | 323.29 | ₹6,048.76 |
| 4 | Earth work in Excavation in trenches for foundations pipes cable etc in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 50 meter and including filling, watering and ramming of excavated earthdisposal of sur-plus earth as directed by the Engineer incharge up to a distance of 50 meters from the foundation trenches. | 3.02 | Cum | 195.21 | ₹589.53 |
| 5 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 8 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. DSR 2.25(A)+(1.1.2 for 3 km) | 775.49 | CUM | 577.43 | ₹4,47,791.19 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 146.86 | CUM | 5,108.49 | ₹7,50,232.84 |
| 7 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 73.75 | CUM | 1,592.65 | ₹1,17,457.94 |
| 8 | Providing and injecting chemical emulsion for Preconstructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface If plinth filling junction of wall and floor, along the external perimeter of binding expansion joints, surroundings of pipes and conduit etc. complete(Plinth area of the building at ground floor only shall be measured as per I.S. 6313 (Part II 1981) Alderine emulsifiable concentrate or any other approved material such as Hepthachlor or chlordance will be used. The rate of applications of chemical emulsion shall be as Follows : (1) Treatment for Masonary & foundatiion 5 Liters per 100 Sqm. (2) Back fill in immediate contact with foundation 7.5 Litres per 100 Sqm. (3) Treatment of Top surface of plinth filling 5 Litres per 100 Sqm. (4) treatment junction of wall and the floor 7.5 Litres per 100 Sqm. (5) Treatment of soil along External Perimerter of Building7.50 Litre per 10 Sqm.. (6) Treatment of soil under Apron Along external Perimeter5 litres Per 100 sqm. | 511.38 | SQM | 230 | ₹1,17,617.4 |
| 9 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 12.5mm nominal size derived from natural sources) | 36.32 | SQM | 308.11 | ₹11,190.56 |
| 10 | Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil. | 39.48 | SQM | 109.6 | ₹4,327.01 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.63 MB
FinancialBid.pdf
Tender Documents • 0.73 MB
technical.pdf
Tender Documents • 8.78 MB
BOQ_2144442.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].