| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC AVANTIKA COLONY NEAR RICE MILL AMROHA | AMROHA | AMROHA | UTTAR PRADESH | ₹1.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.1 Cr+₹6,748.62 (0.06%)Rejected-Finance | ₹1.1 Cr+₹6,748.62 (0.06%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.1 Cr+₹4.8 L (4.53%)Rejected-Finance | ₹1.1 Cr+₹4.8 L (4.53%) | L3 | Rejected-Finance L3 |
| 4 | L4₹1.1 Cr+₹4.9 L (4.63%)Rejected-Finance KRISHNA COMPLEX JAIN COLLEGE ROAD SAHARANPUR UTTAR PRADESH PIN CODE 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | ₹1.1 Cr+₹4.9 L (4.63%) | L4 | Rejected-Finance L4 |
| 5 | L5₹1.1 Cr+₹5.5 L (5.21%)Rejected-Finance | ₹1.1 Cr+₹5.5 L (5.21%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | Durga Engineers and Earth Movers L4 | M/S RAKSHIT ASSOCIATES L6 | Arvind Kumar L2 | J P INFRATECH L3 | M/S RIDAM ASSOCIATES L1 | MAA GAYATRI ASSOCIATES L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning Thick Bushes & Throny Jungle without uprooting including all cost of labour and T&P etc.Complete. | 27,420 | Sqm | 2.4 ₹65,808 | 6 ₹1,64,520 | 2 ₹54,840 Lowest | 2 ₹54,840 Lowest | 2.2 ₹60,324 | 2 ₹54,840 Lowest |
| 2.00 | Uprooting Jhunds with its disposal including all cost of labour and T&P etc.Complete. | 1,470 | Nos | 15 ₹22,050 Lowest | 20 ₹29,400 | 30 ₹44,100 | 28 ₹41,160 | 20 ₹29,400 | 24 ₹35,280 |
| 3.00 | Earth work in excavation in foundation in all type of soil including cost of all lead, lift,, labour and T&P etc. complete. | 946.43 | Cum | 75 ₹70,982.25 | 100 ₹94,643 | 80 ₹75,714.4 | 50 ₹47,321.5 Lowest | 80 ₹75,714.4 | 89 ₹84,232.27 |
| 4.00 | Providing and Laying C.C 1:3:6 (OPC Cement: coarse sand: coarse aggregate) with proper compaction including cost of all material, T&P, labour, carriage, royality and all taxes etc. complete. | 297.78 | Cum | 4,850 ₹14,44,233 | 5,000 ₹14,88,900 | 5,000 ₹14,88,900 | 4,700 ₹13,99,566 Lowest | 4,700 ₹13,99,566 Lowest | 4,700 ₹13,99,566 Lowest |
| 5.00 | Providing Centering and shuttering for R.C.C work with fine ply or steel including cost of all material, labour and T&P etc complete. | 2,994.43 | Sqm | 490 ₹14,67,270.7 | 500 ₹14,97,215 | 400 ₹11,97,772 Lowest | 620 ₹18,56,546.6 | 500 ₹14,97,215 | 600 ₹17,96,658 |
| 6.00 | Supplying & fixing Steel Reinforcement (Fe-500) for RCC work i/c cost of steel binding wire, binding, cutting and placing in position including cost of all material, T&P, labour, carriage, and all taxes etc complete. | 29.98 | MT | 72,000 ₹21,58,560 | 60,000 ₹17,98,800 Lowest | 70,000 ₹20,98,600 | 69,000 ₹20,68,620 | 68,000 ₹20,38,640 | 72,000 ₹21,58,560 |
| 7.00 | Providing and Laying R.C.C 1:1.5:3 (OPC Cement: coarse sand: coarse aggregate) with proper compaction including cost of all material, T&P, labour, carriage, royality and all taxes etc complete. | 320.98 | Cum | 6,670 ₹21,40,936.6 | 6,000 ₹19,25,880 | 6,000 ₹19,25,880 | 5,500 ₹17,65,390 Lowest | 6,100 ₹19,57,978 | 6,100 ₹19,57,978 |
| 8.00 | Providing and Laying Ist Class Brick Work in 1:4 (OPC cement: sand) mortar i/c. including cost of all material, T&P, labour, carriage, royality and all taxes etc complete. | 284.32 | Cum | 5,310 ₹15,09,739.2 | 6,000 ₹17,05,920 | 6,000 ₹17,05,920 | 5,500 ₹15,63,760 | 5,200 ₹14,78,464 Lowest | 5,510 ₹15,66,603.2 |
| 9.00 | 12 mm thick Cement Plaster 1:4 (OPC cement: fine sand) mortar including cost of all material, T&P, labour, carriage, royality and all taxes etc. complete. | 6,382.66 | Sqm | 170 ₹10,85,052.2 | 260 ₹16,59,491.6 | 150 ₹9,57,399 | 174 ₹11,10,582.84 | 145 ₹9,25,485.7 Lowest | 160 ₹10,21,225.6 |
| 10.00 | Ready made coloured Cement paint in two coat on new surface including primer coat i/c all cost of material, labour and T&P etc. complete | 6,382.66 | Sqm | 62.5 ₹3,98,916.25 | 100 ₹6,38,266 | 60 ₹3,82,959.6 Lowest | 70 ₹4,46,786.2 | 68 ₹4,34,020.88 | 63 ₹4,02,107.58 |
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
21 Jul 2026, 2:00 pmClosed
SE GNSM Meerut
Office of SE GNSM Meerut
As per the NIT
2026_UPIDC_1168851_2
02/SE/2026-27
Open Tender
Civil Works
Piece-work
120 days
Haridwar
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,130
₹2.5 L
Office of SE GNSM Meerut
2 Sept 2026
14 Jul 2026
21 Jul 2026
14 Jul 2026
21 Jul 2026
14 Jul 2026
15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning Thick Bushes & Throny Jungle without uprooting including all cost of labour and T&P etc.Complete. | 27,420 | Sqm | 4.4 | ₹1,20,648 |
| 2 | Uprooting Jhunds with its disposal including all cost of labour and T&P etc.Complete. | 1,470 | Nos | 468.6 | ₹6,88,842 |
| 3 | Earth work in excavation in foundation in all type of soil including cost of all lead, lift,, labour and T&P etc. complete. | 946.43 | Cum | 993.65 | ₹9,40,420.17 |
| 4 | Providing and Laying C.C 1:3:6 (OPC Cement: coarse sand: coarse aggregate) with proper compaction including cost of all material, T&P, labour, carriage, royality and all taxes etc. complete. | 297.78 | Cum | 1,611.2 | ₹4,79,783.14 |
| 5 | Providing Centering and shuttering for R.C.C work with fine ply or steel including cost of all material, labour and T&P etc complete. | 2,994.43 | Sqm | 6,395.9 | ₹1,91,52,074.84 |
| 6 | Supplying & fixing Steel Reinforcement (Fe-500) for RCC work i/c cost of steel binding wire, binding, cutting and placing in position including cost of all material, T&P, labour, carriage, and all taxes etc complete. | 29.98 | MT | 6,045 | ₹1,81,229.1 |
| 7 | Providing and Laying R.C.C 1:1.5:3 (OPC Cement: coarse sand: coarse aggregate) with proper compaction including cost of all material, T&P, labour, carriage, royality and all taxes etc complete. | 320.98 | Cum | 83.64 | ₹26,846.77 |
| 8 | Providing and Laying Ist Class Brick Work in 1:4 (OPC cement: sand) mortar i/c. including cost of all material, T&P, labour, carriage, royality and all taxes etc complete. | 284.32 | Cum | 1,123.75 | ₹3,19,504.6 |
| 9 | 12 mm thick Cement Plaster 1:4 (OPC cement: fine sand) mortar including cost of all material, T&P, labour, carriage, royality and all taxes etc. complete. | 6,382.66 | Sqm | 100 | ₹6,38,266 |
| 10 | Ready made coloured Cement paint in two coat on new surface including primer coat i/c all cost of material, labour and T&P etc. complete | 6,382.66 | Sqm | 575 | ₹36,70,029.5 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
TDLOT2.pdf
Tender Documents • 1.51 MB
BOQ_2193069.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .