| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹37.4 LAdmitted-Fee/PreQual/Technical/Finance QTR NO F 1 2 PWD COLONY UNIT 7 BHUBANESWAR PO SURYA NAGAR DIST KHURDHA 751003 | BHUBANESWAR | KHURDHA | ODISHA | 751003 | -16.99% | ₹37.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹37.4 LAdmitted-Fee/PreQual/Technical/Finance | -16.99% | ₹37.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹41.4 LAdmitted-Fee/PreQual/Technical/Finance | -7.97% | ₹41.4 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L3₹42.3 LAdmitted-Fee/PreQual/Technical/Finance AT BELTIKIRI SADAR DHENKANAL | -5.97% | ₹42.3 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L4₹44.1 LAdmitted-Fee/PreQual/Technical/Finance FAKIRPUR WARD NO 48 P O PS JAGATPUR DIST CUTTACK 754021 | JAGATPUR | CUTTACK | ODISHA | 754021 | -2.00% | ₹44.1 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹45 L
EMD Value
₹45,000
Closing Date
28 Jul 2026, 5:00 pmClosed
Executive Officer, Talacher Municipality
At/Po- Talacher Town, Dist.- Anugola
Construction of Gosalla under Talcher Municipality
2026_ORULB_136208_21
TCRM - 9 / 2026-27
Open Tender
Civil Works - Others
Percentage
150 days
Talacher Municipal Office
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹45,000
Yes
16 Aug 2026
18 Jul 2026
29 Jul 2026
18 Jul 2026
28 Jul 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. . | - | cum | 299.53 | - |
| 2 | Supplying and filling in plinth with sand in under floors, including watering, ramming, consolidating and dressing complete | - | cum | 725.95 | - |
| 3 | Providing and laying Plain Cement Concrete of proportion (1:4:8) in foundation using 40 mm & down grade black hard crusher broken granite stone metal, washed and screened sharp sand of approved quality from approved quarry including hoisting, lowering, laying the concrete, ramming, watering and curing etc. complete to required thickness including cost of all materials, conveyance, loading, unloading, royalties, cost of labours, T&P, hire & running charges of concrete mixer, etc. all complete as per the direction of the Engineer -in -charge. | - | cum | 5,631.01 | - |
| 4 | Supplying all materials, labour and T&P for Cement concrete (1:2:4) using 12 mm size CBHG chips in foundation and floor/ RCC work, watering and curring etc as per specification and direction of EIC. | 1 | cum | 7,557.46 | ₹7,549.9 |
| 5 | R.C.C. (1:1½:3) using 12 mm to 20mm size H.G. stone chips including centering & shuttering but excluding the cost of M.S. rod. (i) Foundation | 1 | cum | 8,593.82 | ₹8,585.23 |
| 6 | (ii) Column UP TO ground level | - | cum | 8,593.82 | - |
| 7 | (iii) Boundary wall Plinth band | - | cum | 9,463.22 | - |
| 8 | (iv) Column above plinth | - | cum | 18,026.95 | - |
| 9 | Supplying all materials, labour and T&P for Cutting, bending and binding of M.S rods for RCC works including cost of M.S rods and binding wire etc. | - | qntl. | 8,530.25 | - |
| 10 | Providing and laying Brick Masonry work in Foundation & Plinth using Fly ash bricks of 25 Cm. x 12 Cm. x 7.5 Cm. size having crushing strength not less than 75 Kg./Cm2 with dimensional tolerance + 2 % confirming to IS 12894 and IS 2212 in cement mortar (1:6) affter immersing the bricks for minimum 6 hours in water before use, with all necessary projections, splays cutting, circular moulding, corbelling, etc. as per the drawings including the cost of all materials, cost of all labour, conveyance, royalties, loading, unloading, scaffolding, staging, watering and curing, sundries, T&P, etc. complete as per the direction of the Engineer-in-charge. | - | cum | 5,525.29 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
BOQ_602139.xls
BOQ • 0.31 MB
DTCN9.pdf
Tender Documents • 0.79 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].