Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.9 LAccepted-Finance 4 13 B PERIYAR NAGAR THANGAMAPURIPATTINAM METTUR DAM 636 402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | 1 | Accepted-Finance Satisfied | |
| 2 | 2₹11.8 L+₹84,007.70 (7.68%)Accepted-Finance 7 142 THOTILIL PATTY SALEM CAMP PO METTUR DAM 636 456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | 2 | Accepted-Finance Satisfied |
Tender Value
Refer Docs
EMD Value
₹13,700
Closing Date
31 Aug 2021, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I M I Circle CA FP Extension of new fire hydrant line of 150NB MS ERW Pipe tapping near Stage III Hydrant line and extending to Central stores and providing 5 Nos new fire hydrant points
2021_EB_208247_1
SE / M-I / MTPS-I / CA / OT. 134 / 2021-22
Open Tender
Power/Energy Projects/Products
Works
60 days
Mettur Thermal Power Station-I / Mettur Dam
As per the tender Specification
4 documents required · 4 mandatory
₹0
₹13,700
Yes
4 Sept 2021
17 Aug 2021
1 Sept 2021
17 Aug 2021
31 Aug 2021
17 Aug 2021
Amount
Charges towards site cleaning by using JCB vehicle for extension of 150NB hydrant.
Charges for excavation of earth work.
Charges for refilling the excavated soil after completion of work.
Charges for loading & unloading of 150 NB M.S ERW pipe line from central store to work spot (Lorry & Crane will be supplied by TANGEDCO).
Charges for erection of 150 NB dia New M.S ERW pipe by cutting & welding.
Charges for erection of new M.S ERW 80 NB pipe by cutting & welding.
Charges for cutting, grinding, cleaning and welding of 150 / 100/ 80 NB bend, flange and fabricated reducers with new erected M.S ERW pipe per Joint.
Charges for fabrication of 1 No M.S. Bend out of 150 NB ERW M.S pipe by cutting & welding. (Pipe Supplied by TANGEDCO).
Charges for Petty Iron Works on truss, straps etc., and for fabrication and erection of support structures for the erected M.S ERW pipe at various elevations as per the field requirement and fixing of “U” bolt.
Charges for fabrication of 150 NB M.S dummy flanges suitable for 150NB Flange (16mm thickness M.S plate will be supplied by Board).
Charges for erection of 150 mm gate valve in erected line.
Charges for fixing of 63/80 mm landing valve in the hydrant post.
Charges for concrete anchor support for pipes supplying and providing of PCC 1:2:4 using 12 to 20 mm HBG (Hand broken Granite stone) metal including cost of all material labour lead lift curing etc.
Charges for wrapping of tar sheet on the underground line.
Charges for Painting the fabricated 150/80 NB M.S ERW pipe lines with one coat enamel red oxide primer including the cost of consumables and red oxide.
Charges for Painting the fabricated 150/80 NB M.S ERW pipe lines by two coats of enamel red paint.
Charges for other Consumables, Tool and plant required @ 3% on labour charges (For Sl.No: 1 to 16)
Charges for MS “U” bolt And Hexagonal Nut for 150NB M.S.ERW pipe OD -165.2 mm, Rod dia-M16. (Contractor Scope)
Charges for Concrete material of PCC 1:2:4 using 12 to 30 mm HBG (Hand Broken Granite) stone including cost of all material
Charges for Tar sheet (Contractor Scope)
Charges for P.O red enamel paint (Contractor Scope)
SKSCONTRACTOR
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .