Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹30.0 LAdmitted-Fee/PreQual/Technical/Finance | -21.90% | ₹30.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹31.6 L+₹1.7 L (5.57%)Admitted-Fee/PreQual/Technical/Finance | -17.55% | ₹31.6 L+₹1.7 L (5.57%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹38.4 L+₹8.4 L (28.0%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹38.4 L+₹8.4 L (28.0%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹39.5 L+₹9.5 L (31.9%)Admitted-Fee/PreQual/Technical/Finance | +3.00% | ₹39.5 L+₹9.5 L (31.9%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹40.3 L+₹10.3 L (34.4%)Admitted-Fee/PreQual/Technical/Finance | +5.00% | ₹40.3 L+₹10.3 L (34.4%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹38.4 L
EMD Value
₹76,700
Closing Date
4 Jul 2026, 4:00 pmClosed
Ex. Engineer SND Div IIND
Darish Kadal
Construction of Drainage Network at Shah Naqshband Colony phase III
2026_HAUDD_313084_8
E-NIT NO 04 SNDII OF 2026-27
Open Tender
Civil Works
Percentage
45 days
Shalteng
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,200
Ex Engineer SND Division IIND
₹76,700
6 Jul 2026
20 Jun 2026
6 Jul 2026
20 Jun 2026
4 Jul 2026
20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Bulk excavation by manually means over areas ( exceeding 30 cm in depth 1.5 m in width as well as 10m 2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m,as directed.All kinds of soil | 310.7 | Cum | 592.9 | ₹1,84,214.03 |
| 1.01 | Earth work in Bulk excavation by mechanically means over areas ( exceeding 30 cm in depth 1.5 m in width as well as 10m 2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m,as directed.All kinds of soil | 724.97 | Cum | 187.5 | ₹1,35,931.88 |
| 2 | Extra for work in/under water for slow progress there in Quantity as per items no.01A and 01B @ 40% only | 168.12 | Cum | 118.43 | ₹19,910.45 |
| 3 | Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete.(Measurements to be taken of the face area timbered). | 332.4 | Sqm | 243.75 | ₹81,022.5 |
| 4 | Providing & Laying of Stone Soling duly hand packed on horizantal floor including hand ramming watering and levelling to the surface. | 109.2 | Cum | 937.4 | ₹1,02,364.08 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement 2 coarse sand : 4 graded stone aggregate 20 mm nominal size (Crushed) | 43.19 | Cum | 6,591.25 | ₹2,84,676.09 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level with 1:2:4(1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 50.82 | Cum | 7,104.35 | ₹3,61,043.07 |
| 7 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level, Thermo-Mechanically Treated bars of grabe Fe-500D or more. | 2,875 | kgs | 123.2 | ₹3,54,200 |
| 8 | Centering and shuttering including strutting, propping etc. and removal work of form work Retaining Walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc A. Manholes Walls Internal | 72 | Sqm | 286.5 | ₹20,628 |
| 8.01 | B. Suspended floors, | 57.96 | Sqm | 718.2 | ₹41,626.87 |
stage.html
html • 0.02 MB
finance_1013202.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_1013202.xls
BOQ • 0.28 MB
Corrigendum1.pdf
PDF • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .