| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAccepted-AOC | ₹4.3 L Quoted ₹3.6 L | L1 | Accepted-AOC As per TC recommendation and approval of competent authority. |
| Sl No | Description | Qty | Unit | M/S GENERAL ENGINEERING WORKS L1 |
|---|---|---|---|---|
| 1.00 | cleaning the rusted maintenance gates, discharge gates & surrounded area for taking-up the job, closing the maintenance gates with the help of rake & pinion. Dismantling the 12 no discharge gate cylinders, hoses & other accessories. | 1 | Job | 1,20,000 ₹1.2 L |
| 2.00 | Removal of worn out SS liners and CAM follower bearings by cutting, gauging & surface preparation of the gates. Rebuilding the worn-out edges of discharge gate blades and guider channel of the gates by suitable electrodes as per dimensions. Fabrication of SS liners as per existing gate dimensions (SS liners preferably 10 mm/6 mm & SS electrode will be provided by NCL) | 1 | Job | 1,32,714 ₹1.3 L |
| 3.00 | Fixing and Jointing of fabricated SS liners over the repaired discharge gates (base/mother plate of gates) and plug welding needs to be done for fixing the liners. Installation of dismantled gates, hyadrulic cylinders, hose pipes and other accessories in the line to bring the gates in operational condition. | 1 | Job | 1,10,000 ₹1.1 L |
| 4.00 | Total impact of GST for the purpose of CTC | 1 | No. | - |
Tender Value
₹5.2 L
EMD Value
₹6,500
Closing Date
7 Jan 2025, 11:30 amClosed
Staff Officer(EnM), Amlohri Area
Office of Area General Manager, Amlohri Area, NCL, Singrauli - 486887
Dismantling, overhauling and re-installation of 12 no discharge gates, maintenance gates at RLS line no1, 2 and 3 in Amlohri CHP Phase-I and Phase-II
2024_NCL_323931_1
AML/SO/ENM/ETN/24/601
Open Tender
Miscellaneous Works
60 days
Amlohri Project, NCL
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,500
22 Jan 2026
23 Dec 2024
8 Jan 2025
23 Dec 2024
7 Jan 2025
24 Dec 2024
23 Dec 2024 - 30 Dec 2024
Amount
cleaning the rusted maintenance gates, discharge gates & surrounded area for taking-up the job, closing the maintenance gates with the help of rake & pinion. Dismantling the 12 no discharge gate cylinders, hoses & other accessories.
Removal of worn out SS liners and CAM follower bearings by cutting, gauging & surface preparation of the gates. Rebuilding the worn-out edges of discharge gate blades and guider channel of the gates by suitable electrodes as per dimensions. Fabrication of SS liners as per existing gate dimensions (SS liners preferably 10 mm/6 mm & SS electrode will be provided by NCL)
Fixing and Jointing of fabricated SS liners over the repaired discharge gates (base/mother plate of gates) and plug welding needs to be done for fixing the liners. Installation of dismantled gates, hyadrulic cylinders, hose pipes and other accessories in the line to bring the gates in operational condition.
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid