Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹3.4 LAccepted-AOC | ₹3.4 L | l1 | Accepted-AOC aoc |
| 2 | l2₹3.5 LRejected-Finance | ₹3.5 L | l2 | Rejected-Finance above |
| 3 | l3₹3.6 LRejected-Finance | ₹3.6 L | l3 | Rejected-Finance above |
| 4 | l4₹3.9 LRejected-Finance | ₹3.9 L | l4 | Rejected-Finance above |
| 5 | l5₹3.9 LRejected-Finance | ₹3.9 L | l5 | Rejected-Finance above |
Tender Value
₹3.9 L
EMD Value
₹39,000
Closing Date
4 Apr 2026, 12:00 pmClosed
EE,CD-4,PWD,Ayodhya
EE,CD-4,PWD,Ayodhya
Repair of SSP Office Gate in Police Line Pariser
2026_CEUFZ_1131621_2
406/6A Date 12.02.2026
Open Tender
Civil Works
60 days
EE, CD-4, PWD
Repair of SSP Office Gate in Police Line Pariser
2 documents required · 2 mandatory
₹766
₹39,000
Yes
EE,CD-4,PWD,Ayodhya
22 Apr 2026
30 Mar 2026
4 Apr 2026
30 Mar 2026
4 Apr 2026
30 Mar 2026
30 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1E/W. excavationby mechanical means ( Hydraulic excavatory manual means over areas (exceeding 30cm in depth ,1,5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift ,as directed by engineer - in charge . DSR NO. 2.6.1 .ALL kinds of soil | |||||
| 2P/L. P.C.C. 1:4:8 (1 cement:4 course sand (zone iii) derivedfrom natural sources:8 graded stone aggregate 40 mm.nominal size derived from natural sources ) D.S.R. NO. 4.1.8 | |||||
| 3R.C.C. Work in walls ( any thickness ) including attached pilasters ,columns , piers, abutments , pillars , posts ,struts , etc , above plingth level up to floor five level , excluding the cost of centering, shuttering and finishing and reinforcement in 1:1.5:3 (cement , c/sand ( Zone -III ) derived from natural sourses: 3 grade stone aggregate 20 mm nominal size derived from natural sourses) DSR NO. 5.2.2 | |||||
| 4Reinforced cement concrete work in beams, suspended floors,roofs having slope up to15 degreelandings,balconies,shelves,chajjas,lintels,bands,plain window sills,staircases and spiral stair cases above plingth level up tofloor five level,excluding the cost of centering,shuttering , finishing and reinforced with 1:1.5:3 (1cement ,1.5 c/sand ( Zone -III ) derived from natural sources: 3 grade stone aggregate 20 mm nominal size derived from natural sources) DSR NO. 5.3 | |||||
| 5Steel reinforcement for R.C.C. work including straightening ,cutting ,bending , placing in position and binding all complete upto plinth level .DSR NO. 5.22.6 | |||||
| 6Centering and shuttering includinding strutting ,propping etc.and removal of form for walls( any thickness)including attached pllasters etc. D.S.R.NO. 5.9.2 | |||||
| 7Centering and shuttering includinding strutting ,propping etc.and removal of form for Suspended floors,roofs, landings etc. D.S.R.NO. 5.9.3 | |||||
| 8Providing and fixing of 18 mmthick gang saw cut ,mirror polished,Premoulded and prepolished ,machine cut granite stone and requared sizes shape of approved shade colour and texture in footpath flooring cut granite stone etc with granite stone of slabe of colourblack,cherry/Ruby red of area of slabe over 0,50 sqm all complete D.S.R . NO. 8.2.2.2 | |||||
| 9S/F of sign board at site | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_2111659.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid