Work Contract for DCW Work Erection of line work for separate 22 KV feeder from 110 22KV Poothamedu SS for providing uninterrupted supply to Govt Medical college and hospital Mudiyampakkam
2023_EB_279014_1
ET/WC No.70/VEDC/22-23 dt 04.01.2023
Open Tender
Electrical Works
Works
90 days
Villupuram
EMD EPF ESI GST Experience certificate or Contractor labour liscence
2 documents required · 2 mandatory
₹0
₹18,000
Yes
18 Jan 2023
5 Jan 2023
13 Jan 2023
5 Jan 2023
12 Jan 2023
5 Jan 2023
Work item
Excavation of pole pit for pole 9.00m length by using JCB/Manual
Excavation of pole pit for pole RSJ 42' pole length by using JCB/Manual
Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual
Erection of PSC Pole 9.00 mtr length by using Crane/ Manual(excluding stud pole 20 Nos)
Erection of RSJ Poles 42' by using Crane / Manual(excluding stud pole 4 Nos)
Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc.
Fixing of V cross arm 4.6 feet
Fixing of HT / LT TI fitting
Fixing of HT PIN insulator with Pin 22 KV
Fixing of HT strain disc 22 KV
Fixing of two tapping X arm per cut point 22 KV line including fixing of disc, insulators and jumpering etc.
Paving and stringing of HT 3 Phase 3 wire line with conductors of size 7/4.09mm ACSR conductor
Erection of DP structure with stay as per TNEB standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc., with 22 KV AB switch with 9 mtr Pole .300KG
Mass concreting of poles with 1:4:8 mix using 40 mm Jelly including curing (Material + labour)
Stay concreting with 1:4:8 mix using 40 mm Jelly including curing (Material + labour)
Earthing of poles with GI wires 4 SWG or 6 SWG by coil earthing
Loading of 9mtr PSC pole 300 Kg
Loading of RSJ 42' feet pole
Unloading of 9mtr PSC pole 300 Kg
Unloading of RSJ 42' feet pole
Loading of conductor 7/4.09 mm ACSR Conductors
Unloading of conductor 7/4.09 mm ACSR Conductors
Loading of line materials )
Unloading of line materials )
Loading of 22 KV Strain disc
Unloading of 22 KV Strain disc
Provision of guarding with two numbers earth pits excluding stay set erection Flat guarding with earth pit
Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.5 Km
Transporting of conductors of all sizes from road side to pit location
JSURESHKUMAR TNEB CONTRACTOR
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .