| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹39.9 L+₹2.7 L (7.30%)Accepted-AOC 1 6 620 CHAITANYAPURI INDRA NAGAR DILSUKHNAGAR HYDERABAD TELANGANA 500060 UDYAM TS 09 0007870 37AAEPO0535A1Z8 B 36AAEPO0535A1ZA R MSME STATUS AS VERIFIED | RANGA REDDY | TELANGANA | 500060 | L2 | Accepted-AOC Accepted being L1 amongst bonafide bids | |
| 2 | L1₹37.2 LRejected-AOC | L1 | Rejected-AOC Not being L1 bonafide bid | |
| 3 | L3₹41.4 L+₹4.2 L (11.2%)Rejected-AOC PLOT NO 28 SANTOSHIMA COLONY WEST MARREDPALLY SECUNDERABAD 500026 | HYDERABAD | TELANGANA | 500026 | L3 | Rejected-AOC Not being L1 | |
| 4 | L4₹44.1 L+₹6.9 L (18.5%)Rejected-AOC | L4 | Rejected-AOC Not being L1 | |
| 5 | L5₹44.3 L+₹7.1 L (19.0%)Rejected-AOC | L5 | Rejected-AOC Not being L1 |
Tender Value
₹44.5 L
EMD Value
₹89,000
Closing Date
9 Jan 2021, 6:00 pmClosed
GE UTILITY SECUNDERABAD
GE UTILITY SECUNDERABAD MUDFORT SECUNDERABAD-500003
MANNING AND OPERATION OF OUT SOURCING SERVICES FOR EXTERNAL ELECTRIC SUPPLY OF ZONE II B AND DG SETS OF VARIOUS LOCATIONS UNDER AGE E M NO - II OF GE (U) SECUNDERABAD
2020_MES_403161_1
GE(U)/SEC/TOKEN/49 OF 2020-2021
Open Tender
Civil Works
Item Rate
330 days
SECUNDERABAD
AS PER NIT
6 documents required · 6 mandatory
₹500
GE UTILITY SECUNDERABAD
₹89,000
Yes
23 Jan 2021
12 Dec 2020
11 Jan 2021
12 Dec 2020
9 Jan 2021
24 Dec 2020
Amount
SCHEDULE 'A' PART - I (OUTSOURCING SERVICES)
Manning and operation of electric Supply system in three shifts in all TOP in the undermentioned area , each shift of 08 (eight) hrs including Sunday & holidays by employing the manpower as mentioned below for entire system comprising at AOC & Centre, 1 TB, 2 TB, Adm Bn, ABC Line, RAMC, Gough Line Offrs/JCO, BMH Line, MDC, AOC Record, 454 FH, 54 DOU, 60 Coy ASC, 371 unit, 729 unit OTM, Ord line Md accn safilguda area and all pump house/swimming pool including HT and LT switch gear, panel boards, UG cables, street lights, transformers, GODs, external electrical fittings and fixtures, street light repairs and rectification of fault/complaints and replacement of fittings, at various place maintaining complanint cell and connected items such as operation of fuse wire, ballast, MCCB's burn at Panels etc of any size situated out side of the Qtrs including maintenance of necessary records of Civil Supply and documents like log book etc, complete all as specified and directed in respect of Zone IIB :- (a) Shifting Timings are as under :- (i) 1st shift - 0600 hrs to 1400hrs. (ii) 2nd shift - 1400 hrs to 2200 hrs. (iii) 3rd shift - 2200 hrs to 0600 hrs. (b) Manpower to be employed by out sourcing :-
ELECTRICIAN per Shift of 8 Hours
Rate for MATE per Shift of 8 Hours
Notes for Sl Item No 1.00 to 5.00 (including Sub Items) :- (i) Absent from duty of technician is not permissible as E&M services essential in nature. However, the absence will invite penalty as described in Sch 'A' notes and recovery from bill shall be done through recovery statement.The tenderer will have no claim whatsoever on this account and decision of Accepting officer in this regard will be final and binding. (ii) Tenderer shall arrange insurance to his work-men and relevant proofs of the same shall be submitted to the department as and when demanded, the cost for the same is deemed to be included in the rate quoted. Responsibility of compliance of labour regulations in force lies with the tenderer. The provision of statutory laws relating to minimum wages, EPF, EDLI, ESIC, Bonus, GST, Cess & other levies payable shall be strictly adhered to by the contractor. The Contractor shall produce proof of wages, EPF, ESIC, Bonus paid against the respective workmen while claiming payments. iii) The rates quoted by the Contractor / firm shall not be less than minimum wages as notified by Govt Of India / State Govt / Local body whichever is higher, including taxes as applicable. iv) Tenderer shall work out and quote the rates under Col 5, Col 7, Col 9, Col 11 & Col 13 for each item / sub items. Rate quoted under Col 9 (overheads and Profits) shall also deemed to include for consumable items, uniforms, stationery charges, etc., required for proper operation and maintenance of equipments. v) Bidders are advised to follow the websites/ notifications of respective Department/ Organization regularly, and ensure that any changes in minimum fair wages/ contributions, Taxes are accounted by them and revise their quoted rates accordingly before end date of submission of Bid. No claim of not aware of new Notifications / Circulars will be entertained after bids are closed on account of revisions.
Notes for Sl Item No 1.00 to 5.00 (including Sub Items) Contd., vi) Bid submitted by Tenderer under following stipulations shall be treated as non - bonafide / invalid / disqualified and such bids will not be considered for acceptance and in such case the lowest bidder shall be determined from amongst the valid / bonafide bids only :- a) Quoting wages under Col 5 against any item / sub-items of BOQ shall not be less than the prevailing minimum rates of wages payable as notified by Govt. of India/ Concerned State Govt / Local body whichever is higher. b) Quoted rate under Col 7 i.e., Bonus, shall not be less than Minimum payable (8.33%) and shall be based on actual payment basis. c) Quoted % under col 9 i.e., for “OH&P, consumable items, uniforms, stationary, etc., should not be “Nil”/”Zero” consideration, d) ESIC % under Column 13 is @ 3.25% subject to Salary less than 21,000/- as per instructions in vogue e) Quoted rates shall deemed to be inclusive of all taxes, cess, levies as applicable including GST. vii) In case Contractor is liable to pay EPF, % quote under Column 11 shall not be less than % applicable as per EPF & MP Act and its latest notifications / amendments. viii) Any variation in minimum wages, liability of EPF, ESIC, EDLI, BONUS, LWC, GST shall be adjusted from re-imbursement / recovery as specified in Special Conditions here-in-after. The prevailing wages / Contribution prevailing on the bid submission end date for adjustment / re-imbursement as specified here-in-after. ix) Exemptions / limitations, if any shall not be considered while quoting rates, EPF, ESIC, BONUS, LWC as the same shall be calculated during actual contribution payable depending upon the salary of the individual based on the number of days engaged in the work.
Notes for Sl Item No 1.00 to 5.00(including Sub Items) Contd., x) Contractor’s attention is invited to Labour Wages Act with regards to payment of wages to the individuals engaged under this work. Contractor shall make the payments to their staff / employees by Cheque or through NEFT in their Bank Account, and the particulars of same shall be submitted to the department while claiming any payment. No payments will be made, unless proof of payment of wages through bank account is submitted by the Contractor/firm while claiming bills. xi) The wages, / contribution towards EPF, EDLI, ESIC, Bonus shall be paid by the GE in RAR / Final bill only after submission of valid and authentic document in support of proof of payment / contribution of requisite amount to the workmen by the Contractor. In case, the Contractor fails to submit proof of payment made to Workmen, no payment will be made by Department. xviii) Payment in respect of any item / sub-item of BoQ in RAR / Final bill towards the wages, EPF, EDLI, ESIC, Bonus shall be made on the actual amount paid to the Workmen by the Contractor, subject to maxium of the rate quoted under respective heads, plus his quoted OH&P & LWC and no extra claim by the Contractor shall be admissible in this account. In case, Contractor pays less than quoted rates, payments will be made on the actual amount paid by the Contractor plus his quoted OH&P & LWC and nothing extra over and above his quoted rates is payable by the Department except revisions by Govt. Any violation of Acts rests with Contractor and Contractor shall be solely responsible for same..
Notes for Sl Item No 1.00 to 5.00(including Sub Items) Contd., (a) Submission of proof of crediting the wages into the bank account / payment made to the employees by the Contractor shall be a pre-requisite to release subsequent payments to contractors. The contractor shall also provide the details of individual’s EPF and ESI account No to claim the RAR / FB payment from time to time. Register for wages, complaints and identity of workers will be maintained by the contractor and will be submitted to the department on monthly basis. (b) The rate quoted is deemed to be inclusive of the cost of complaint slips and registers, cost of T&P for maint work of all plants and minor consumables such as gland packing, grease, nut, bolts, PVC insulation tape, screws, fuse wire, clips etc for day to day maintenance including maintaining the records/registers such as Log Sheets, break down register, Plant Running Record Book including Fuel consumption records, area cleaning and maintenance of sub-stations including earth pits near sub-stations and prunning of tree branches near the eletric over head lines etc for day to day maintenance. (c) The rate quoted is deemed to be inclusive of providing mobile communication system in the complaint cell so that the complaint can be lodged and feed back can be obtained. (d) Stores viz fitting/fixtures, cable etc shall be issued by the department for replacing unserviceable fittings/fixtures, cables etc where required at no extra cost to the Government. The stores to the extent available in the stores shall be issued.
Notes for Sl Item No 1.00 to 5.00(including Sub Items) Contd., (e) The contractor has to supply uniform to their employees for wearing during the working hours. The unit rate is deemed to include for the uniform. The uniform shall be in blue colour pant and shirt.The pattern of the uniform shall be as decided by the Engineer-in-Charge. (f) Technician/employees employed by the contractor will not work continuously for 07 days. The employees worked for six days contineously should be given one day off with payment as per the contract labour act as referred in condition 58 of IAFW-2249. (g) The contractor is responsible for submitting the documents of qualification / experience certificate of employees before commencement of work. (h) The rate considered is deemed to include for 1st hour maintenance including cleaning and replacement of minor spare parts of unserviceable bolts, nuts and twin washers as and when required. (j) The rate considered is deemed to include the cost towards maintenance of hygienic condition and around the installations. The contractor is fully responsible towards the health of staff employed. (k) Wage period shall not exceed one month & wages for all workers employed shall be paid on or before 7th day from the date of each month completed through bank account, otherwise recovery will be made @Rs100/- per shift/Per day.
Manning and operation of DG Set 40 KVA at AOC HQ - 01 No and Centrifugal Pump set for water supply pumping and distribution system at 36 JCO Pump House in one general shift of 08 (eight) hours including Sunday and holidays by employing the manpower as mentioned below for entire system comprising at, motor operation at various places of AOC Centre i.e, OTM of 1 TB, CHQ, CSD, 36 JCO Md Accn for attending minor repairs, rectification of faults/complaints and replacement of fittings/fixtures maintaining complaint cell with and connected items such as operation of sluice valves, gate valves of any size situated inside/out side the pump houses and maintenance of records and documents complete all as specified and directed :- (a) Shifting timings are as under :- (i) General shift : 0600 hrs to 1430 hrs with break for breakfast from 0830 hrs to 0900 hrs. (b) Manpower to be employed by out sourcing :-
Rate for FGM per Shift of 8 Hours
Manning and operation of DG Set 125 KVA at AOC Record & MDC - 02 Nos and Centrifugal Pump set for water supply pumping and distribution system at AOC Record Pump House in one general shift of 08 (eight) hours including Sunday and holidays by employing the manpower as mentioned below for entire system comprising at, motor operation at various places of AOC Record OTM for attending minor repairs, rectification of faults/complaints and replacement of fittings/fixtures maintaining complaint cell with and connected items such as operation of sluice valves, gate valves of any size situated inside/out side the pump houses and maintenance of records and documents complete all as specified and directed :- (a) Shifting timings are as under :- (i) General shift : 0600 hrs to 1430 hrs with break for breakfast from 0830 hrs to 0900 hrs. (b) Manpower to be employed by out sourcing :-
Rate for FGM per Shift of 8 Hours
Manning, Operation and Maintenance of Water Supply distribution by operating the valves of in-comming (of filling up water in OHT) and out going (for distribution of water in specified area of OHT) areas of OH Reservoir in one shift of 08 Hrs including sundays and Holidays in following Areas :- (a) Shift Timings are as under :- (i) Ist Shift : 08.30 Hrs to 1700 Hrs with 30 Min break for breakfast from 01300 Hrs to 13.300 Hrs (b) Manpower to be employed:-
Rate for Valveman per Shift of 8 Hours
Manning and operation of DG set 400 KVA-01, 182.5 KVA-02, 100 KVA-01, 82.5 KVA -01 & 40 KVA-01 and Monoblock pump set, bore well for water supply including Oxygen Manifold system and equipment installed at MH secunderabad & vlave operation in three shift of 08 hours on all working days including sundays and holidays by employing the manpower as mentioned below for entire system comprising at MH Secunderabad office including operation of panel boards, maintenance of necessary records and documents complete all as spefified and directed. (a) Shift timings as under :- (i) First shift :- 0600 hrs to 1400 hrs (ii) Second shift : 1400 hrs to 2200 hrs (iii) Third shift : 2200 hrs to 0600 hrs (b) Manpower to be employed (By out sourcing) :-
Rate for FGM per Shift of 8 Hours
DPS sales and services india
Universal refrigeration and Engineering Company
Skyline Encon
Srinivasa Consructions
Bidder Name
Srinivasa Consructions
Universal refrigeration and Engineering Company
Ms V.Prakash
DPS sales and services india
Skyline Encon
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .