Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical 1 14 15 G HAUSILA NAGAR CIVIL LINE HEAD POST OFFICE CIVIL LINE FAIZABAD UTTAR PRADESH 224001 | AYODHYA | UTTAR PRADESH | 224001 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹67,900
Closing Date
18 May 2026, 2:00 pmClosed
CE
Nagar Nigam Ayodhya
Sawarkar nagar ward ke mo salarpur me mati nisad ke makan tak cc road va nali nirman ka karya as per nit 03
2026_DOLBU_1142532_3
52/15va/NNA/2026
Open Tender
Civil Works
Percentage
30 days
Ayodhya
Please refer Tender documents.
2 documents required · 2 mandatory
₹950
MC
₹67,900
18 May 2026
27 Apr 2026
18 May 2026
27 Apr 2026
18 May 2026
27 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in excavation all complete. S.J.No 251 | 42.3 | Cum | 125 | ₹5,287.5 |
| 2 | P/L P.C.C. work in 1:6:12 all complete. Work SI No 273 | 9.54 | Cum | 4,125 | ₹39,352.5 |
| 3 | Class 150 brick work in 1:4 C.sand all complete. SI No 305b | 21.2 | Cum | 5,390 | ₹1,14,268 |
| 4 | 12 mm thick plaster in 1:3 with cement and c/sand etc all complete | 50.4 | sqm | 190 | ₹9,576 |
| 5 | P/L of C.C. in 1:2:4 with cement, c/sand and stone grit ete all complete. S.I. No 279b | 2.67 | Cum | 7,850 | ₹20,959.5 |
| 6 | Supply & Laying of G.S.B. etc all complete work. | 19.8 | Cum | 3,866.86 | ₹76,563.83 |
| 7 | S/L of 125 micron Polythene sheet etc all complete. | 198 | sqm | 25 | ₹4,950 |
| 8 | Providing and laying C.C. pavement of mix M-20 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and finished with screed board vibrator, vacuum dewatering process and finally finished by floating, brooming with wire brush etc. complete as per specifications and directions of Engineer-incharge. | 29.7 | Cum | 9,070 | ₹2,69,379 |
| 9 | P/mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect NON METALLIC C.C HARDNER (@5 kg HARDNER per sqm of surface area SAME AS IN d.s.r. 26.31.1 | 198 | sqm | 96.25 | ₹19,057.5 |
| 10 | R.C.C work in 1:1.5: 3 with cement c/sand and 20mm stone grit etc all complete. | 8.21 | Cum | 8,650 | ₹71,016.5 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_2133788.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .