Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.6 L+₹3.4 L (47.3%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical Disqualified | |
| 4 | Rejected-Technical | - | Rejected-Technical Disqualified |
Tender Value
Refer Docs
Closing Date
13 Feb 2021, 6:00 pmClosed
Director, STPI-Bhubaneswar
STPI ELITE, Plot No.2/A, Gothapatna, Bhubaneswar - 751003
Design, Supply, Installation and Commissioning of 30Mtr Three Leg self Supported Microwave Tower on Roof Top at STPI-Deoghar
2020_DIT_605623_2
227/09(69)/1924/STPI-BH/2020
Open Tender
Metal Fabrication
Works
84 days
STPI, Plot No.15 (part), Industrial Area, Jasidih
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
31 Mar 2021
4 Feb 2021
15 Feb 2021
4 Feb 2021
13 Feb 2021
4 Feb 2021
4 Feb 2021 - 9 Feb 2021
PART – A (Supply of materials)
Foundation work for erecting 30mtr self support microwave tower on ground As per specification in 3.0
Supply of Fabricated and Galvanized Steel Structure for 30mtr self support microwave tower on roof top ( tower material including platform ladder, antennae mounting clamps fixers and accessories) As per specification in 3.0
Supply of Lightning arrester, AOL Lamps and Weather proof cable on the 30 M mast including junction box (Cable make Havells / Finolex) (Full details and quantity to be furnished)
Supply of Epoxy Paint for 30 M erected new mast as required (make :Nerolac/ Asian/ Berger/ Dulux ) 1. Epoxy White 2. Epoxy International orange 3. Epoxy primer 4. Epoxy Thinner (Full details and quantity to be furnished)
All materials required for tower lightening arrestor earthing (including copper plate and strip etc Earthing material(98% purity) 1. Copper plate(600 x600 x 5mm ) 2. Copper strip (25 x 3mm) (Full details and quantity to be furnished)
Any other items not covered above but required for full filing the scope of work of 30 M meter tower and testing (Full details and quantity to be furnished)
PART-B (Works)
Labour charges for erection of 30 M galvanized Steel Structure (tower material including platform ladder, antennae mounting clamps fixers and accessories
Labour charges for painting 30 M height tower with one coat of Epoxy primer, and two coats of Epoxy paint (alternate band of international orange and white as per civil aviation norms.)
Labour charges for all electrical works including fixing of AOL, laying of power supply cable, earthing, lightning arrester etc
Any other work not covered above but required for full filing the SITC of 30 M meter and testing (Full details to be furnished)
kaizen engineering projects
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .