Loading…
Loading…
| Sl No | Description | Qty | Unit | K RAMESH L1 | Gomathi G L2 |
|---|---|---|---|---|---|
| 1.00Kaveripakkam Block | |||||
| 2.00Rural Road Maintanance Scheme 2025-2026 Kaveripakkam Block Pakage No.1 | |||||
| 3.001.Maintanance of the Road from Panniyur Panapakkamroad to Pudupattu (Via) Pudupattu PWD Tank Bund Km 0/0-1/20 (R-64) | |||||
| 4.00 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 864 | sq.m | 6.1 ₹5,270 Lowest | 8 ₹6,912 |
| 5.00 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal Cost and including all labour charges etc complete | 9.39 | cu.m | 3,919.44 ₹36,804 Lowest | 3,919.44 ₹36,804 Lowest |
| 6.00 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal Cost and including all labour charges etc complete | 12.47 | cu.m | 4,602.44 ₹57,392 Lowest | 4,602.44 ₹57,392 Lowest |
| 7.00 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | 484.4 | sq.m | 33.52 ₹16,237 Lowest | 40 ₹19,376 |
| 8.00 | BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 12.11 | cu.m | 11,193.84 ₹1,35,557 Lowest | 11,193.84 ₹1,35,557 Lowest |
| 9.002.Maintanance of the Road From S.K Road to Panniyur Panapakkam Road (Via) Upparanthangal Km 0/0-1/500 (R-132) | |||||
| 10.00 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 1,080 | sq.m | 6.1 ₹6,588 Lowest | 8 ₹8,640 |
Tender Value
₹9.0 L
EMD Value
₹9,020
Closing Date
24 Oct 2025, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (BP)
BLOCK DEVELOPMENT OFFICER KAVERIPAKKAM
Rural Road Maintanance Scheme 2025-2026 Kaveripakkam Block Pakage No.1
2025_RDTN_615575_1
A3/4030/2025
Open Tender
Civil Works
Item Rate
BLOCK DEVELOPMENT OFFICE
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,020
Yes
22.10.2025
30 Oct 2025
18 Oct 2025
24 Oct 2025
18 Oct 2025
24 Oct 2025
18 Oct 2025
22 Oct 2025
Amount
Kaveripakkam Block
Rural Road Maintanance Scheme 2025-2026 Kaveripakkam Block Pakage No.1
1.Maintanance of the Road from Panniyur Panapakkamroad to Pudupattu (Via) Pudupattu PWD Tank Bund Km 0/0-1/20 (R-64)
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal Cost and including all labour charges etc complete
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal Cost and including all labour charges etc complete
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
2.Maintanance of the Road From S.K Road to Panniyur Panapakkam Road (Via) Upparanthangal Km 0/0-1/500 (R-132)
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal Cost and including all labour charges etc complete
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal Cost and including all labour charges etc complete
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
3.Maintanance of the Road from Thuraiperumbakkam Maganipattu Road to Kannigapuram Road km 0/0-1/20 (R-146)
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal Cost and including all labour charges etc complete
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal Cost and including all labour charges etc complete
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Gomathi G (BID ID -1495313)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.90 MB
BOQ_735502.xls
BOQ • 0.29 MB
Tenderdocument.pdf
Tender Documents • 1.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .