Tender Value
₹44.7 L
EMD Value
₹45,000
Closing Date
2 Dec 2019, 3:00 pmClosed
The Project Director, DRDA, Sivagangai
O/o The Project Director, DRDA, Sivagangai
Strengthening / Upgradation of 7 Road work at Package No. TNSVG/6/MNM/ 14CFC 2019-20 in Manamadurai Block of Sivagangai District
2019_RDTN_149014_1
Order No.103/2019/PRO/pk6mnm14cfc
Open Tender
Civil Works - Roads
Item Rate
180 days
Sivagangai
Refer Tender Documents
6 documents required · 6 mandatory
₹0
₹45,000
16 Jan 2020
26 Nov 2019
2 Dec 2019
26 Nov 2019
2 Dec 2019
26 Nov 2019
Amount
Strengthening of the road from NH 226 Thayapuram Road KM 0 / 0 - 0 / 400 ( R 104 )
Providing and laying WBM 75mm compacted thickness with grade III metal using 1 cum of 63-11.2mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying tack coat over WBM surface using 4.00 kg. of emulsion bitumen for 10 sqm area including cost of bitumen, including labour charges for preparing the surface and applying the required quantity of emulsion bitumen as tack coat etc., complete MOST specification.
Providing and laying premix carpet with seal coat type 'A' for 20mm thickness using 0.18 cum of 13.2 mm IRC HBG metal and 0.09 cum of 11.2mm IRC with 13.432 kg. of bitumen with 1.168Kg of Plastic wastefor pre-mixing 10sqm of premix carpet and 0.09 cum of 6.70cum IRC HBG metal with 9.8kg. of bitumen for seal coat type 'A' per 10sqm including cost and conveyance fo all materials mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80/100KN power roller for premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet including hire charges for fuel charges for mini hot mix plant, bitumen boiler, power roller and all other T&P's employed etc., complete. (plastic waste)
HM Stone
Sub total
Strengthening of Seikalathur AD Colony Road in km 0/0 - 0/2( R -170)
Clearing the scrub Jungle including removing from the site, disposal by burying or burning etc., complete as directed by the departmental officers
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A
Picking the existing Damaged Bt Surface including cost and conveyonce of all labour charges etc completed
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying WBM 75mm compacted thickness with grade II metal using 1 cum of 75-22.4mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying WBM 75mm compacted thickness with grade III metal using 1 cum of 63-11.2mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying tack coat over WBM unprimed surface using 4.00 kg. of emulsion bitumen for 10 sqm area including cost of bitumen, including labour charges for preparing the surface and applying the required quantity of emulsion bitumen as tack coat etc., complete MOST specification.
Providing and laying premix carpet with seal coat type 'A' for 20mm thickness using 0.18 cum of 13.2 mm IRC HBG metal and 0.09 cum of 11.2mm IRC with 13.432 kg. of bitumen with 1.168Kg of Plastic wastefor pre-mixing 10sqm of premix carpet and 0.09 cum of 6.70cum IRC HBG metal with 9.8kg. of bitumen for seal coat type 'A' per 10sqm including cost and conveyance fo all materials mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80/100KN power roller for premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet including hire charges for fuel charges for mini hot mix plant, bitumen boiler, power roller and all other T&P's employed etc., complete. (plastic waste)
Provision for KM Stone & HM Stone
Hecta metre stone
Sub total
Strengthening of the road from Vethiyarendal to Vethiyarendal colony road km 0/0 - 0/320 (R116)
Clearing the scrub Jungle including removing from the site, disposal by burying or burning etc., complete as directed by the departmental officers
Picking the existing Damaged Bt Surface including cost and conveyonce of all labour charges etc completed
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying WBM 75mm compacted thickness with grade III metal using 1 cum of 63-11.2mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying tack coat over WBM surface using 4.00 kg. of emulsion bitumen for 10 sqm area including cost of bitumen, including labour charges for preparing the surface and applying the required quantity of emulsion bitumen as tack coat etc., complete MOST specification.
Providing and laying premix carpet with seal coat type 'A' for 20mm thickness using 0.18 cum of 13.2 mm IRC HBG metal and 0.09 cum of 11.2mm IRC with 13.432 kg. of bitumen with 1.168Kg of Plastic wastefor pre-mixing 10sqm of premix carpet and 0.09 cum of 6.70cum IRC HBG metal with 9.8kg. of bitumen for seal coat type 'A' per 10sqm including cost and conveyance fo all materials mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80/100KN power roller for premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet including hire charges for fuel charges for mini hot mix plant, bitumen boiler, power roller and all other T&P's employed etc., complete. (plastic waste)
Provision for KM Stone & HM Stone
Hecta metre Stone
Sub total
Strengthening of the Road from Seegankulam Road to Chinnakanmoi kudiyiruppu in km 0/0 -0/600 (R118)
Clearing the scrub Jungle including removing from the site, disposal by burying or burning etc., complete as directed by the departmental officers
Picking the existing Damaged Bt Surface including cost and conveyonce of all labour charges etc completed
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying WBM 75mm compacted thickness with grade III metal using 1 cum of 63-11.2mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying tack coat over WBM unprimed surface using 4.00 kg. of emulsion bitumen for 10 sqm area including cost of bitumen, including labour charges for preparing the surface and applying the required quantity of emulsion bitumen as tack coat etc., complete MOST specification.
Providing and laying premix carpet with seal coat type 'A' for 20mm thickness using 0.18 cum of 13.2 mm IRC HBG metal and 0.09 cum of 11.2mm IRC with 13.432 kg. of bitumen with 1.168Kg of Plastic wastefor pre-mixing 10sqm of premix carpet and 0.09 cum of 6.70cum IRC HBG metal with 9.8kg. of bitumen for seal coat type 'A' per 10sqm including cost and conveyance fo all materials mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80/100KN power roller for premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet including hire charges for fuel charges for mini hot mix plant, bitumen boiler, power roller and all other T&P's employed etc., complete. (plastic waste)
Hecta metre Stone
Sub total
Strengthening of the Thuthikulam Road km 0/0 -0/220 (R97)
Clearing the scrub Jungle including removing from the site, disposal by burying or burning etc., complete as directed by the departmental officers
Picking the existing Damaged Bt Surface including cost and conveyonce of all labour charges etc completed
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying WBM 75mm compacted thickness with grade II metal using 1 cum of 75-22.4mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying WBM 75mm compacted thickness with grade III metal using 1 cum of 63-11.2mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying tack coat over WBM unprimed surface using 4.00 kg. of emulsion bitumen for 10 sqm area including cost of bitumen, including labour charges for preparing the surface and applying the required quantity of emulsion bitumen as tack coat etc., complete MOST specification.
Providing and laying premix carpet with seal coat type 'A' for 20mm thickness using 0.18 cum of 13.2 mm IRC HBG metal and 0.09 cum of 11.2mm IRC with 13.432 kg. of bitumen with 1.168Kg of Plastic wastefor pre-mixing 10sqm of premix carpet and 0.09 cum of 6.70cum IRC HBG metal with 9.8kg. of bitumen for seal coat type 'A' per 10sqm including cost and conveyance fo all materials mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80/100KN power roller for premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet including hire charges for fuel charges for mini hot mix plant, bitumen boiler, power roller and all other T&P's employed etc., complete. (plastic waste)
Hecta metre Stone
Sub total
Strengthening of the Gandhi Nagar colony Buriyal ground road in km 0/0 -0/2 (R189)
Clearing the scrub Jungle including removing from the site, disposal by burying or burning etc., complete as directed by the departmental officers
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying WBM 75mm compacted thickness with grade II metal using 1 cum of 75-22.4mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying WBM 75mm compacted thickness with grade III metal using 1 cum of 63-11.2mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying tack coat over WBM unprimed surface using 4.00 kg. of emulsion bitumen for 10 sqm area including cost of bitumen, including labour charges for preparing the surface and applying the required quantity of emulsion bitumen as tack coat etc., complete MOST specification.
Providing and laying premix carpet with seal coat type 'A' for 20mm thickness using 0.18 cum of 13.2 mm IRC HBG metal and 0.09 cum of 11.2mm IRC with 13.432 kg. of bitumen with 1.168Kg of Plastic wastefor pre-mixing 10sqm of premix carpet and 0.09 cum of 6.70cum IRC HBG metal with 9.8kg. of bitumen for seal coat type 'A' per 10sqm including cost and conveyance fo all materials mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80/100KN power roller for premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet including hire charges for fuel charges for mini hot mix plant, bitumen boiler, power roller and all other T&P's employed etc., complete. (plastic waste)
Hecta metre Stone
Sub total
Strengthening of the Konnakulam Buriyal ground road in km 0/0 -0/200
Clearing the scrub Jungle including removing from the site, disposal by burying or burning etc., complete as directed by the departmental officers
Earthwork excavation and depositing on bank with initial lead of 10 m and lift of 2.0 m in hard gravel soil including cost and conveyance of all labour charges etc., complete as per SS 20 A
Picking the existing Damaged Bt Surface including cost and conveyonce of all labour charges etc completed
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying WBM 75mm compacted thickness with grade II metal using 1 cum of 75-22.4mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying WBM 75mm compacted thickness with grade III metal using 1 cum of 63-11.2mm IRC HBG metal with 0.24 cum of gravel for blindage per 10sqm incl. cost and conveyance of all materials and stacking to departmental gauge for premeasureemnt labour charges for spreading metal and hand packing to Camber watering with all leads for Water and Compacting by 80-100KN power roller rolling incl. hire charges etc., completed.
Providing and laying tack coat over WBM unprimed surface using 4.00 kg. of emulsion bitumen for 10 sqm area including cost of bitumen, including labour charges for preparing the surface and applying the required quantity of emulsion bitumen as tack coat etc., complete MOST specification.
Providing and laying premix carpet with seal coat type 'A' for 20mm thickness using 0.18 cum of 13.2 mm IRC HBG metal and 0.09 cum of 11.2mm IRC with 13.432 kg. of bitumen with 1.168Kg of Plastic wastefor pre-mixing 10sqm of premix carpet and 0.09 cum of 6.70cum IRC HBG metal with 9.8kg. of bitumen for seal coat type 'A' per 10sqm including cost and conveyance fo all materials mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80/100KN power roller for premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet including hire charges for fuel charges for mini hot mix plant, bitumen boiler, power roller and all other T&P's employed etc., complete. (plastic waste)
Hecta metre Stone
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
TAMILARASAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .