Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹95.2 LAccepted-AOC | ₹95.2 L | 1 | Accepted-AOC L1 bidder |
| 2 | 2₹1.3 Cr+₹35.3 L (37.1%)Rejected-Finance WEAR MODI BUILDING MATERIAL KANGANPUR ROAD SIRSA | ₹1.3 Cr+₹35.3 L (37.1%) | 2 | Rejected-Finance Firm quoted rates are not within 5 percent of the L1 bidder rates |
| 3 | 3₹1.4 Cr+₹47.6 L (50.0%)Rejected-Finance | ₹1.4 Cr+₹47.6 L (50.0%) | 3 | Rejected-Finance Firm quoted rates are not within 5 percent of the L1 bidder rates |
| 4 | 4₹1.8 Cr+₹81.7 L (85.8%)Rejected-Finance | ₹1.8 Cr+₹81.7 L (85.8%) | 4 | Rejected-Finance Firm quoted rates are not within 5 percent of the L1 bidder rates |
| 5 | 5₹2.0 Cr+₹1.0 Cr (106.7%)Rejected-Finance | ₹2.0 Cr+₹1.0 Cr (106.7%) | 5 | Rejected-Finance Firm quoted rates are not within 5 percent of the L1 bidder rates |
| Sl No | Description | Qty | Unit | Neeraj Construction Company L2 | JAYTECH ENGINEERS AND CONTRACTORS L5 | Satyam Engineering L3 | Alex Engineering L1 | GURU ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00Cleaning work of Boiler & its auxiliaries for 2x600 MW, Unit-I&II, RGTPP, HPGCL, Khedar, Hisar 1st Year | ||||||||
| 1.01 | Daily Cleaning of Boiler & its aux. ground floor area
(12 months for each Unit) | 24 | Month | 1,55,500 ₹37,32,000 | 1,90,380 ₹45,69,120 | 1,61,246 ₹38,69,904 | 75,000 ₹18,00,000 Lowest | 1,80,200 ₹43,24,800 |
| 1.02 | Regular Cleaning of Boiler Floors (above zero meter to 80 meter) & Various Equipment’s (12 months for each Unit) | 24 | Month | 38,900 ₹9,33,600 Lowest | 72,550 ₹17,41,200 | 44,000 ₹10,56,000 | 75,000 ₹18,00,000 | 60,800 ₹14,59,200 |
| 1.03 | Regular Cleaning of Fuel Oil Pump Houses Tank Area, common site for both Units (12 months for both Units) | 12 | Month | 19,500 ₹2,34,000 | 38,390 ₹4,60,680 | 19,440 ₹2,33,280 | 7,500 ₹90,000 Lowest | 29,842 ₹3,58,104 |
| 1.04 | Lifting & disposal of ash emptied from inside of various ducts during shut down (500 m3 for each Unit) | 1,000 | Sqm | 100 ₹1,00,000 | 375 ₹3,75,000 | 195 ₹1,95,000 | 90 ₹90,000 Lowest | 280 ₹2,80,000 |
| 1.05 | Deployment of One no. Mini JCB/Bobcat of bucket size 0.4 cum (200 Hrs per unit per year ) | 400 | Hrs | 1,000 ₹4,00,000 | 1,695 ₹6,78,000 | 1,300 ₹5,20,000 | 630 ₹2,52,000 Lowest | 1,560 ₹6,24,000 |
| 2.00Cleaning work of Boiler & its auxiliaries for 2x600 MW, Unit-I&II, RGTPP, HPGCL, Khedar, Hisar 2nd Year | ||||||||
| 2.01 | Daily Cleaning of Boiler & its aux. ground floor area
(12 months for each Unit) | 24 | Month | 1,61,500 ₹38,76,000 | 2,10,315 ₹50,47,560 | 1,69,400 ₹40,65,600 | 75,000 ₹18,00,000 Lowest | 1,95,450 ₹46,90,800 |
| 2.02 | Regular Cleaning of Boiler Floors (above zero meter to 80 meter) & Various Equipment’s (12 months for each Unit) | 24 | Month | 41,000 ₹9,84,000 Lowest | 84,840 ₹20,36,160 | 45,350 ₹10,88,400 | 75,000 ₹18,00,000 | 72,400 ₹17,37,600 |
| 2.03 | Regular Cleaning of Fuel Oil Pump Houses Tank Area, common site for both Units (12 months for both Units) | 12 | Month | 20,500 ₹2,46,000 | 45,980 ₹5,51,760 | 20,500 ₹2,46,000 | 7,500 ₹90,000 Lowest | 40,500 ₹4,86,000 |
Tender Value
Refer Docs
EMD Value
₹2.1 L
Closing Date
9 Apr 2026, 11:00 amClosed
Sudip Ranjan Nandy
CE RGTPP Khedar Hisar
ARC of cleaning work Of Boiler and its Auxiliaries for 2x600 MW, Unit-1and2, RGTPP, Khedar, Hisar
2026_HBC_507485_1
2026FE6FD8E5 9C3C 42D6 A1AD EAB71956FB7E712PGC
Open Tender
Civil Works
Works
730 days
KHEDAR
As per NIT
2 documents required · 2 mandatory
₹1,180
₹2.1 L
Yes
18 Sept 2026
10 Mar 2026
11 Apr 2026
10 Mar 2026
9 Apr 2026
10 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Cleaning work of Boiler & its auxiliaries for 2x600 MW, Unit-I&II, RGTPP, HPGCL, Khedar, Hisar 1st Year | |||||
| 1.01 | Daily Cleaning of Boiler & its aux. ground floor area
(12 months for each Unit) | 24 | Month | 1.25 | ₹30 |
| 1.02 | Regular Cleaning of Boiler Floors (above zero meter to 80 meter) & Various Equipment’s (12 months for each Unit) | 24 | Month | - | - |
| 1.03 | Regular Cleaning of Fuel Oil Pump Houses Tank Area, common site for both Units (12 months for both Units) | 12 | Month | - | - |
| 1.04 | Lifting & disposal of ash emptied from inside of various ducts during shut down (500 m3 for each Unit) | 1,000 | Sqm | - | - |
| 1.05 | Deployment of One no. Mini JCB/Bobcat of bucket size 0.4 cum (200 Hrs per unit per year ) | 400 | Hrs | - | - |
| 2Cleaning work of Boiler & its auxiliaries for 2x600 MW, Unit-I&II, RGTPP, HPGCL, Khedar, Hisar 2nd Year | |||||
| 2.01 | Daily Cleaning of Boiler & its aux. ground floor area
(12 months for each Unit) | 24 | Month | 10 | ₹240 |
| 2.02 | Regular Cleaning of Boiler Floors (above zero meter to 80 meter) & Various Equipment’s (12 months for each Unit) | 24 | Month | - | - |
| 2.03 | Regular Cleaning of Fuel Oil Pump Houses Tank Area, common site for both Units (12 months for both Units) | 12 | Month | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_586243.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .