| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹3.3 L+₹5,570 (1.72%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹3.3 L+₹5,608 (1.73%)Admitted-Finance 100 FOOTA ROAD FCI COLONY BAREILLY | BAREILLY | UTTAR PRADESH | 243001 | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S EVERGREEN TRADERS L2 | M/S RATHORE ELECTRICALS L1 | S S Enterprises L3 |
|---|---|---|---|---|---|---|
| 1.00(A) Cartage and Erection Carriage of following materials from Electricity store center Unnao to dump work site along with loading, unloading and proper stocking as per requirement. Distance 0-50 Km. | ||||||
| 1.01 | STP Pole of 11 mtr long | 15 | Nos | 1,200 ₹18,000 | 1,000 ₹15,000 Lowest | 1,000 ₹15,000 Lowest |
| 1.02 | HT XLPE Cable 3x70 sq. mm 11 KV | 80 | Mtr | 45 ₹3,600 | 25 ₹2,000 Lowest | 25 ₹2,000 Lowest |
| 1.03 | ACSR Weasel Conductor | 1,300 | Mtr | 18 ₹23,400 | 10 ₹13,000 | 5 ₹6,500 Lowest |
| 1.04 | Aluminum Armoured Cable 3.5x70 sq. mm | 60 | Mtr | 20 ₹1,200 Lowest | 25 ₹1,500 | 25 ₹1,500 |
| 1.05 | Distribution Transformer 100 KVA 11/0.4 KV | 1 | Nos | 4,200 ₹4,200 | 3,500 ₹3,500 Lowest | 4,500 ₹4,500 |
| 1.06 | Other loose line materials including GI/stay wire, double Pole accessories, stay & earthing, Rod insulator, MS channel angle cable and Jointing Kit etc. | 1 | Job | 3,600 ₹3,600 | 3,500 ₹3,500 Lowest | 10,000 ₹10,000 |
| 2.00 | Erection of S.T. single pole structure including digging of pit and fitting of all accessories with its cartage dump site as per RESPO Norms. | 9 | Nos | 1,500 ₹13,500 | 1,450 ₹13,050 | 1,250 ₹11,250 Lowest |
| 3.00 | Erection of S.T. double pole structure including digging of pit and fitting of all accessories with its cartage dump site as per RESPO Norms. | 3 | Nos | 5,000 ₹15,000 | 5,000 ₹15,000 | 2,950 ₹8,850 Lowest |
| 4.00 | Making of H.T. Section points by brackets, clamps & Making of T-off arrangement for including fabrication and fitting of all accessories. | 2 | Nos | 2,400 ₹4,800 | 3,000 ₹6,000 | 1,550 ₹3,100 Lowest |
Tender Value
₹3.3 L
EMD Value
₹3,300
Closing Date
18 Sept 2025, 5:00 pmClosed
Superintending Engineer
Superintending Engineer Electricity Distribution Circle-Unnao
Quantum of works for Construction of Underground/Overhead 11 KV line of M/s Indian Oil Corporation Ltd. Add. Malhauli Sardar Nagar, Miyaganj, Tahsil Hasanganj, Distt. Unnao under full deposit scheme in the area of EDSD-III, Miyaganj under the EDD-V
2025_MVVNL_1072580_1
100/E.D.C./Unnao/2025-26
Open Tender
Electrical Works
Fixed-rate
180 days
Unnao
as per tender document
2 documents required · 2 mandatory
₹1,180
A/C-No.3355002101008374,IFSCCode- PUNB0335500
₹3,300
23 Sept 2025
9 Sept 2025
19 Sept 2025
9 Sept 2025
18 Sept 2025
9 Sept 2025
Amount
(A) Cartage and Erection Carriage of following materials from Electricity store center Unnao to dump work site along with loading, unloading and proper stocking as per requirement. Distance 0-50 Km.
STP Pole of 11 mtr long
HT XLPE Cable 3x70 sq. mm 11 KV
ACSR Weasel Conductor
Aluminum Armoured Cable 3.5x70 sq. mm
Distribution Transformer 100 KVA 11/0.4 KV
Other loose line materials including GI/stay wire, double Pole accessories, stay & earthing, Rod insulator, MS channel angle cable and Jointing Kit etc.
Erection of S.T. single pole structure including digging of pit and fitting of all accessories with its cartage dump site as per RESPO Norms.
Erection of S.T. double pole structure including digging of pit and fitting of all accessories with its cartage dump site as per RESPO Norms.
Making of H.T. Section points by brackets, clamps & Making of T-off arrangement for including fabrication and fitting of all accessories.
Fabrication/ Modifications of MS Items, Nuts & Bolts as per requirement of site conditions.
Placement of 11/0.433 KV Distribution Transformer newly constructed T/F on Double Pole Installation and commissioning of 100 KVA Transformer including lugs, Jumpering & connecting Earthing of body & neutral with proper fitting with lugs, nut& bolt as per required.
New Earthing for Distribution transformers one neutral and one for body of transformer 40 ft. deep GI pipe of size 40 mm, making all arrangements for its recharging funnel with open able cover of steel chequered plate with hinges and making connections to transformer neutral/body by GI strip of size 35x5 mm after complete running welding and connecting with pipes by clamps/nut bolts and welding.
Grouting of S.T. pole as per RESPO norms with grouting materials.
Earthing of S.T. Pole as per RESPO norms.
Digging of pits, fixing nuzzling and grouting of stay rods as per RESPO norms with grouting of materials.
Laying of 11 KV underground HDPE pipe 140 mm by HDD Method including all associated work
Laying of 11 KV underground XLPE Double Circuit cable of size 3x70 sq mm with Drill Machine with the help of HDPE Pipe ( HDD method)
Making of cable box for 11 KV 3X70 mm cable jointing Kit/Cable box
Cable Hosting at Pole with GI Pipe dia 6" jumpring of cable proper Mounting of cable box outdoor 3x70 sq mm crimping lugs etc.
Chopping of tree branches laying in the route of making new 11 KV line
Fixing of Danger board & with Barbed wire on new ST Pole.
Painting of New ST Pole with aluminum Paint
(B) Following Materials to be Provided by contractor
Holding clamps for ST pole with Nuts & Bolts.
F- clamps for ST pole with Nuts & Bolts.
Stay Clamps for ST pole with Nuts & Bolts.
HDPE Pipe 140 mm
G.I. Pipe 6” dia
Red Oxide
Danger Board with clamp
Barbed wire
M/S EVERGREEN TRADERS (BID ID -5538315)
S S Enterprises (BID ID -5539402)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .