Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
19 Dec 2022, 12:00 pmClosed
SE EDC-I ALIGARH
LAL DIGGI ALIGARH
Construction of 11 KV line related work for M/s Hind Agro Industries Ltd., Aligarh (HV-2 Connection) under full deposit scheme under EDD-III, Aligarh.
2022_DVVNL_758513_1
EDCA-51/2022-23
Open Tender
Electrical Works
Item Rate
60 days
EDD-III
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
DVVNL Agra Web Site
₹5,000
20 Dec 2022
14 Dec 2022
19 Dec 2022
14 Dec 2022
19 Dec 2022
14 Dec 2022
Amount
Cartage of following poles Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).
PCC poles 8.5 Mtr.
ST poles 11 Mtr.
Cartage of line material viz Weasal Conductor, GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).
Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
PCC poles 8.5 Mtr
ST poles 11 Mtr.
Erection of 11 KV line double pole on ST pole including the work of complete line as per RESPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
ST pole 11 Mtr.
Laying , sagging, stringing, binding and jumpering etc. of old line conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
ACSR Weasal Conductor
ACSR Rabbit Conductor
ACSR Dog Conductor
Drilling and cutting of tee off channel, V cross arms, Top channel, cross bracing angle, MS garding angle, Dropper chanel. as per specification of UPPCL construction manual including including loading and unloading at the both ends.
Grouting of PCC/ST poles as per RESPO norms including cost of grouting material (cement: sand: brick ballast) size as per RESPO norms.
PCC poles 8.5 Mtr.
ST poles 11 Mtr.
Making the plinth of ST poles 11 Mtr.
Dismantling and removal of existing conductor from the various area preparing their coils and then stacking in the respective JE’s (Store) as per direction of Supervising Engineer. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work.
ACSR Weasal Conductor
Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of labour
Erection and grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work
Providing and fixing of stay insulator.
Safe carriage of XLPE cable of size 3x185 Sq. m.m. from store to respective site of work including loading unloading at both ends.
Laying of 3x185 Sq.mm. 11 KV under ground cable after digging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. The cable shall be duly protected by Ist class bricks, two on either side and third on top of the cable, laid in series one after the other. The work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. Spare cable shall be left and buried in the trench in the shape of rings at both ends. All material (except cable), labour, T&P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost.
Fixing of 3x185 Sq.mm. 11 KV XLPE heat shrinkable cable jointing kits outdoor/indoor type including the cost of labour T&P carrier etc for proper completion of work.
Safe carriage of 11 KV pilfer proof metering cubicle from store centre, Sarsol to site of work including loading and unloading at both ends. Average distance approx. 0 km to 50 km.
Erection & grouting of 11 KV pilfer proof metering cubicle making connections with bus bar, tapping with Empire Tape with existing earthing. The above work includes the cost of labour, T&P, carrier & material etc. required for proper completion of work except cost of 11 KV VCBs.
Safe carriage of 11 KV CT/PT pole mounting unit of any other place or from site of work to the work of its loading & unloading at the respective ends including the cost of labour, T&P and carrier etc. required for proper completion of work.
Installation of 11 KV CT-PT combined metering unit on double pole after fixing of channel with M.S. Clamps and nuts bolts for holding the channel angle etc. The unit body shall be earthed by connecting M.S. strip of size 1/8x1 finally connected to earthing rod of size 20mm x2540 mm. 11 KV line shall be connected to unit as per instructions of SDO/AE(M). The M.S. Strip & earth rod shall be included in the scope of work.
Replacement of following accessories:-
11 KV Disc Insulator.
11 KV Pin Insulator
11 KV V-type Cross Arm.
F-Bracket.
Safe carriage of size 4x2.5/2x2.5 mm control cable. from store to respective site of work including loading unloading at both ends.
Laying of 4x2.5/2x2.5 mm control cable through under ground/ cablle trench/ trench in SGR interlinking through proper connections Transformer control panel/Protection board/ Battery & battery charger/Buchholtz relay 33/11 KV Transformer junction box/33 KV VCB, CTS, etc. as per site conditions.
Fixing of following accessories:-
33 KV line Isolator
33 KV Lighting Arrestor
33 KV Post Isolator
33 KV Junction Box
Fixing of PG clamp as per RESPO manual and as per direction of supervising engineer including the cost of labour, T&P etc. Required for proper completion of work.
Fixing of 11 KV CT as per RESPO manual and as per direction of supervising engineer including the cost of labour, T&P etc. Required for proper completion of work.
Providing & Fixing of Clamps of LT, Cross Arm Holding, F-Clamp, Stay Clamp, Danger board clamp with Nut & Bolts.
SANJAY ELECTRICALS
P K ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .