Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹8,500
Closing Date
26 Nov 2026, 2:00 pmDue today
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
CE MTPSII
O/o CE MTPS II
Renewal of worn out hot air gate seals in 4 Nos of hot air gates E to H during COH of 2026
2026_EB_725746_1
OT 58
Open Tender
Maintenance Works
Works
40 days
SE/MI/MTPSII
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹8,500
Yes
12 Nov 2026
12 Nov 2026
27 Nov 2026
12 Nov 2026
26 Nov 2026
12 Nov 2026
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for removing the damaged / worn out bunch of Haste alloy spring seal assemblies of frame top in the existing hot air gate plate entering top surface of duct, fixing the new bunch of SS seal assembly with proper setting & aligning the seals and additionally fixing the top side seals etc… Finally checking the Hot air gate smooth operation for ensuring the sliding gate piercing into the seal beam assembly for arresting of hot air gate leaks etc..(Required qty. of Asbestos ropes are under contractor scope). | 4 | Nos | - | - |
| 2 | Charges for removing the all inspection doors of hot air gate side walls, removing the damaged / worn out bunch of Haste alloy seal assembly from the existing hot air sliding gate seating duct side walls & bottom walls, fixing the new Haste alloy seal assembly of duct frame left vertical & right vertical side seals, Frame bottom seals with proper setting & aligning the seals and additionally fixing the frame vertical & bottom side seals etc… Finally checking the Hot air gate smooth operation for ensuring the sliding gate piercing into the seal beam assembly for arresting of hot air gate leaks etc. (Required qty. of Asbestos ropes are under contractor scope ). | 4 | Nos | - | - |
| 3 | Charges for dismantling the pneumatic operated power cylinder from the hot air gate & lower down to the mill repair bay, remove the end caps, piston shaft with flange, lock nut etc… one by one, cleaning, checking and inspecting the piston seals, ‘o’ rings & renewal of worn out parts etc… if necessary, reassembling to the hot air gate body and checking the trouble free operation of hot air gate movement etc... More care to be taken while renewal of seals in Hot air gate cylinder. If damaged, free replacement shall be made at free of cost. (Portable type air compressor for checking the cylinder & gate operation (8 kg. pressure) is to be provided by contractors if necessary to complete the work within time as service air will not be available during Unit overhauling period). | 4 | Nos | - | - |
| 4 | Charges for cutting and removing the wornout seal holding plates of size 1700x150mm in the hot air duct and refixing the new MS plate of the required size after assembling the hot air duct SS seals including cost of consuables and T&Ps etc., (required 10mm tk MS plates contractor's scope) | 4 | Nos | - | - |
| 5 | Hot PA shut off gate cylinder seals | 4 | sets | - | - |
| 6 | Hot PA vertical gate cylinder seals | 4 | sets | - | - |
| 7 | Supply of M10X 50 mm full thread bolt, nut & plain washer | 200 | Nos | - | - |
| 8 | Charges for fabrication of inspection doors of hot air gate side walls (04 Nos), Bottom walls (02 Nos) of size 500mm x 250 mm X 6 mm thick with hand rails, cuttuing and champering the edges,providing holes as per direction of Engg in Charge. (Required quantity of MS plate supplied by TNPGCL). | 4 | sets | - | - |
| 9 | Charges for removal of insulation over the hot air gate area, this work involves removal of insulated metal Sheet, wool mattress, gas cutting, removal of retainers and casing supports and etc… | 28 | m2 | - | - |
| 10 | Charges for providing insulation over the hot air gate out side frame in coal mills, this work involves cleaning, welding of Pin & retainers, laying of wool mattress (New/released) sewing the joint of mattress by GI wire, screwing the casing support with retainer wounding the G.I binding wire across the retainer including consumables such as Screw, Binding wire, welding electrodes, T&P’s and other consumables etc., | 28 | m2 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_871197.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .