Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAccepted-AOC N A | PALWAL | HARYANA | 121004 | ₹6.5 L Quoted ₹6.6 L | L1 | Accepted-AOC L-1 |
| 2 | L2₹6.7 LRejected-AOC NIL | ₹6.7 L | L2 | Rejected-AOC L-2 |
| 3 | L3₹6.7 LRejected-AOC 1ST FLOOR AMRIT EDUCATION GOVT DEGREE COLLAGE ROAD DHALIARA TEHSIL DEHRA DISTT KANGRA H P | KANGRA | HIMACHAL PRADESH | 175013 | ₹6.7 L | L3 | Rejected-AOC L-3 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹6,250
Closing Date
13 Feb 2026, 3:00 pmClosed
Sr.Xen
Er.Rahul Puri) Sr. Executive Engineer, Electrical Division, HPSEBL Haroli
HED/346/2025-26
2026_HPSEB_127500_1
NO/HED-346/2025-26
Open Tender
Electrical Works
90 days
ED Haroli
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹6,250
17 Mar 2026
4 Feb 2026
13 Feb 2026
4 Feb 2026
13 Feb 2026
4 Feb 2026
Erection Part of 11/0.4 KV, 100 KVA Transformer (T.S no274 /2025-26)
Erection of S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, Alluminium Paint AI i.e X-arml, Knee bracing set, erection of D-pole,errection of plate form, ercetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Erection of T/F, and earthing conn. to T/F G.O Switch lightning etc. erection of Stay Set, Erection of Jumper, Pipe earthing 3 Nos., Erection of LT cable, brabed wire and painting, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect. ( 100 KVA Transformer)
Erection Part of 11 KV HT Line T. S no. 272 /2025-26
Erection of S.T Single Pole 11 Mtr. Long :- Digging of Pit,fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect.
Erection of Tapping Structure S.T Double Pole 9 Mtr. Long - Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect.
Erection of Earthing Set.:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect.
Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect.
Stringing and sagging conductor:- Laying of conductor (AAAC 7/3.81 mm 80 mm²) stringing and sagging, binding with insulator complete in all respect.
Laying of G.I Wire, Stringing, Sagging and binding complete in all respect.
Fixing jumper complete in all respect.
Erection of GO switch complete in all respect.
Erection of DO Fuse complete in all respect.
Transportation and Loading of materials HT lines materials on truck at Divisional Store and same material unloading at road to site of work with manual carriage.
Erection Part of 3Ph LT Line (T.s NO :-273/2025-26)
Erection of LT line.Digging of pit of stay, Erection of ST Pole 9 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect.
Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor of New 3-Ph. L.T Line complete in all respect.
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work.
Supply Part of 11/0.4 KV, 100 KVA Transformer /2025-26
Prov. Distribution Transformer (Ordinary), 11/0.4 kV, 100 KVA (Supply by HPSEBL 1NOS)
Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) (Supply by HPSEBL 2NOS)
Prov. RCC Muff
Prov. concrete filling in RCC muff
Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 1 Nos for LA.
Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
Transformer Belting & Knee Bracing
Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 2800 mm x 2 Nos for Transformer Bed]
Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting main channel of Transformer]
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
Prov. MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos
Prov. MS Angle Iron (50X50x6 mm), Length: 950 mm x(2 Nos for Bed Knee Bracing)
Transformer L.T Distribution Box and GO Switch fixing Assembly
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
Prov. MS Angle Iron (50X50x6 mm), Length : 450 mm x 1 No.
Prov. GO Switch Handle supporting : [Channel Iron (75x40x6mm), Length: 460 mm
Prov. GO AB Switch Unit (11kV, 400A, 100 KA) Tripple Pole O/d Type
Prov. D.O Fuse Unit
Prov. Surge Arrester, 9 kV Station Class (Porcelain Type)
Prov. Discs insulator (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) CD- 400mm
Prov. Stay set complete
Prov. Stay Wire (7/3.15 mm) (10.0 kg Per Stay Set)
Prov. Pipe Earthing Set
Prov. 6 SWG GI wire For Earthing
Prov. LT Distribution Panel Box with MS Sheet of 1.6 mm ( 900x800x200 mm ) cubide Box complete with stand etc and Al Busbar (25x6mm)inside .painted /powder coated after primar coating MCCB 160 amp 3P 35kA , ICS =100 % ICU, Kit-Kit 200 Amp for 100 KVA DTR
Prov. Half Clamp (M.S. Flat 50X6 mm)
Prov. Full Clamp (M.S. Flat 50X6 mm)
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Prov. Aluminium Thimble
Prov. Copper Thimble 200 Amp
Prov. Danger Plate
Prov. Barbed Wire
Prov. LT Cable 3.5 X 120 mm² 1.1 kV XLPE Cable Unarmoured
Prov. Energy Meter 3-ɸ, 4 wire CT operated Static Tri- Vector meter with Box (CT-100/5A) Accuracy Class: 0.5S, Category-C, DLMS Compliant for 100 KVA Transformer
Prov. Aluminium Paint.
Prov. Red Oxide
Chain Link fencing , Angle Iron ,Gate etc for transformer fencing complete in all respect.
Supply Part of 11 KV HT Line T.S No/2025-26
Prov. Steel Tubular Poles (11 m, Working Load > 200 kgf/m²) with Steel cap & Base Plate) (Provided by HPSEBL (8 Nos)
Prov. RCC Muff
Prov. concrete filling in RCC muff
Prov. (AAAC 7/3.81 mm 80 mm²) mm Conductor(Prov.by HPSEBL 1.335 Kms.)
Prov.G.I.Wire No. 8 SWG in mtr.
Run Through Str. ( ∆) Formation on Singlr Pole Str.
Prov. Cross Arm (Channel Iron (100x50x6) Length 1270 mm for single pole
Prov. Angle Iron (50x50x6mm) Leggth 750 mmx 2*2 nos structure
Prov. Pole Top Bracket (MSCI) (100X50X6 mm) Length 100 mm
Prov.11kv Pin Insulator with pin complete in all respect
HT Stay /Guy Arrangement
Prov.11kv Stay set complete in all respect
Prov. Stay Wire HT (10 kg. per Stay Set)
Earthing
Prov.11kv Earthing set complete in all respect.
Prov.G.I.Wire No. 8 SWG in mtr.
Prov.Eye/Earth Hook
Prov.MS Half Clamp
Prov.MS Full Clamp/stay
Prov.11kv Danger Plate (250x200x1.6 mm)
Prov.Nuts and Bolts of Various Sizes
Prov.Barbed Wire
Prov. Red Oxide
Prov. Aluminium Paint.
Tapping Str. Supply Material
Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) with Steel cap & Base PlateProvided by HPSEBL 2Nos)
Prov. RCC Muff
Prov. concrete filling in RCC muff
Prov.Belt set -MS Angle Iron 50x50x6,Length 1800mm x2No.
Prov.X-Bracing set -MS Angle iron 50x50x6,length 2125mmx2no
Prov.X-Arm (Horizontal )Ms Channel (100x50x6,Length 2340x2mm2no formation
Prov.11kv Earthing set complete in all respect.
Prov. GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length: 460 mm
Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
Prov. GO AB Switch Unit (11kV, 400A, 25 KA) Tripple pole O/D type
Prov. D.O Fuse Unit
Prov. Stay set complete
Prov. Stay Wire HT (10.0 kg Per Stay Set)
Prov.Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Disc Polymeric,TC, 90 KN ) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)complete for double pole str in all respect.
Prov. Half Clamp (M.S. Flat 50X6 mm)
Prov. Full Clamp (M.S. Flat 50X6 mm)
Supply Part of 3-Phase LT Line(T.s NO :-/2025-26)
Prov. AAAC 7/3.15 (55mm²) {Includes 1 conductor lengths for 3Φ {Neutral conductor including 1% (Sag, Jumpering and wastage}(Prov.by HPSEBL 2.242kMS)Supply by HPSEBL 0.900)
Prov. ST Pole 9 mtr.long .Supply by HPSEBL 5NOS)
Prov. RCC Muff
Prov. concrete filling in RCC muff
Prov. Channel iron (75x40x5) Length 1.5 mtr. + 0.2 mtr.
Prov. Shackle Insulator (16 Kn) M.s D-Iron with nuts and bolts.
Prov. Earth Hook
Prov. LT Stay Set Stay Wire(i/c Stay Clamp)/stay wire (7/3.15 mm) (6.0 kg Per Stay Set)complete in all respect.
Prov.Half Clamp
Prov. Full Clamps [ 1 No for Stay Set]
Prov. Earthing Set complete
Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Prov. Red Oxide
Prov. Aluminium Paint.
Prov. Spiral PVC Spacer
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.85 MB
termandcondition.pdf
Tender Documents • 0.78 MB
additionaltermandcondition.pdf
Additional Documents • 0.58 MB
BOQ_188300.xls
BOQ • 3.27 MB
Download all tender documents and submit your bid