Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23,788Admitted-Finance MAIN DHOBIANA ROAD AND SHANT NAGAR WARD NO 11 AND P LAYING PC AT GALI KHADDAR BHANDAR WALI STREET B S DR SINGLA EYE HOSPITAL AND FAUJI CHOWK TO MEHNA CHOWK WARD NO 30 AND 27 | LUDHIANA | PUNJAB | 141001 | ₹23,788 | L1 | Admitted-Finance |
| 2 | L2₹25,308Admitted-Finance | ₹25,308 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | VARDAAN CONSTRUCTIONS L1 | KHALSA CONSTRUCTION COMPANY L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in ordinary soil, exclusive of compensation of earth:- (a) Kassi work undressed involving an average horizontal throw up to 2.0 metres and an average vertical lift up to 0.5 metres including breaking of clods. | 1 | Cum | 114 ₹114 | 126 ₹126 |
| 2.00 | Earth work excavation in ordinary soil, exclusive of compensation of earth:- (b) Earth work undressed with a combined lead upto 15 metres including breaking of clods. | 1 | Cum | 1 ₹1 | 1 ₹1 |
| 3.00 | Dressing of earth work (i) New work or remodeling work. | 1 | Sq.Mtr | 64 ₹64 | 73 ₹73 |
| 4.00 | (6.18 (a)) Dag belling single kassi stroke minimum 7.5 cm depth. | 1 | Km | 848 ₹848 | 932 ₹932 |
| 5.00 | LINING Dressing bed and preparation of sub grade for lining. | 1 | Sq.Mtr | 11 ₹11 | 12 ₹12 |
| 6.00 | Dismantling brick work tile, masonry or tile lining:- (b) In cement | 1 | cum | 718 ₹718 | 718 ₹718 |
| 7.00 | BRICK WORK First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth | 1 | Cum | 6,820 ₹6,820 | 7,192 ₹7,192 |
| 8.00 | PLASTERING & POINTING 10mm thick Cement Plaster 1:4 for Side Walls | 1 | Sq.Mtr | 198 ₹198 | 202 ₹202 |
| 9.00 | PLASTERING & POINTING 10mm thick cement plaster 1 : 4 on floors & Top | 1 | Sq.Mtr | 152 ₹152 | 159 ₹159 |
| 10.00 | CONCRETE Supplying & laying dry brick bats | 1 | Cum | 1,045 ₹1,045 | 1,149 ₹1,149 |
Tender Value
₹91 L
EMD Value
₹1.8 L
Closing Date
20 Apr 2026, 10:00 amClosed
Executive Engineer
Executive Engineer, Bathinda Canal and Ground water Division, Bathinda
Estimate for Relining/Lining of watercourse of Outlet RD 63065/R of Bathinda Disty
2026_WR_164957_4
65/22A/2025-26
Open Tender
Civil Works - Canal
Bathinda
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.8 L
bathinda
21 Apr 2026
30 Mar 2026
20 Apr 2026
30 Mar 2026
20 Apr 2026
30 Mar 2026
7 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Earth work excavation in ordinary soil, exclusive of compensation of earth:- (a) Kassi work undressed involving an average horizontal throw up to 2.0 metres and an average vertical lift up to 0.5 metres including breaking of clods. | - | Cum | - | - | |
Earth work excavation in ordinary soil, exclusive of compensation of earth:- (b) Earth work undressed with a combined lead upto 15 metres including breaking of clods. | - | Cum | - | - | |
Dressing of earth work (i) New work or remodeling work. | - | Sq.Mtr | - | - | |
(6.18 (a)) Dag belling single kassi stroke minimum 7.5 cm depth. | - | Km | - | - | |
LINING Dressing bed and preparation of sub grade for lining. | - | Sq.Mtr | - | - | |
Dismantling brick work tile, masonry or tile lining:- (b) In cement | - | cum | - | - | |
BRICK WORK First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth | - | Cum | - | - | |
PLASTERING & POINTING 10mm thick Cement Plaster 1:4 for Side Walls | - | Sq.Mtr | - | - | |
PLASTERING & POINTING 10mm thick cement plaster 1 : 4 on floors & Top | - | Sq.Mtr | - | - | |
CONCRETE Supplying & laying dry brick bats | - | Cum | - | - |
stage.html
html • 0.03 MB
techsummary_334514.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_334514.xls
BOQ • 0.24 MB
TB04.xls
Additional Documents • 0.04 MB
Download all tender documents and submit your bid