Loading…
Loading…
Tender ID
Tender Value
₹8.3 L
EMD Value
₹16,687
Closing Date
25 May 2026, 11:00 amClosed
EXECUTIVE OFFICER NAGAR PALIKA PARISHAD RUDAULI
EXECUTIVE OFFICER NAGAR PALIKA PARISHAD RUDAULI
PURUSHOTTAM NAGAR WARD ME SHEKH SULEMAN RAHMATULLAH AALHE KABRISTAN PAR BOUNDRYWALL KA NIRMAN KARYA.
2026_DOLBU_1141189_46
23/NPP/RUDAULI/2026-27
Open Tender
Civil Works
Percentage
AYODHYA
Please refer Tender documents.
2 documents required · 2 mandatory
₹992
EXECUTIVE OFFICER NAGAR PALIKA PARISHAD RUDAULI
₹16,687
25 Apr 2026
25 Apr 2026
26 May 2026
25 Apr 2026
25 May 2026
25 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W Excavation in foundation in ordinary soil including filling lift upto 1.5 mtr and lead upto 30m including filling watering and ramming of excavated earth into the trenches etc all compt. As per SI no. 251 | 69.44 | cum | 125 | ₹8,680 |
| 2 | P/L PCC 1:4:8 cement, Fine Sand and brick ballast including supply of materials labour and T&P etc required for proper completion of the wrork and curring compt. All complete as per SI no. 275 | 10.35 | cum | 4,350 | ₹45,022.5 |
| 3 | RCC 1:2:4 in cement, C. Sand and 20mm stone grit in RCC RAFT. Foundation All complete as per SI no. 287 | 8.65 | cum | 7,750 | ₹67,037.5 |
| 4 | RCC 1:1.5:3 in cement, C. Sand and 20mm stone grit in LIGHTER BEAM. All complete as per SI no. 285 B | 9.17 | cum | 8,935 | ₹81,933.95 |
| 5 | RCC 1:1.5:3 in cement, C. Sand and 20mm stone grit in COLUMN. All complete as per SI no. 289 | 3.4 | cum | 9,480 | ₹32,232 |
| 6 | First class 150 brick work in 1:4 cement:C.sand mortar in foundation including supply of all materials labour T&P etc required for proper completion of the work... all compt. As per SI no. 305(b) | 19.01 | sqm | 5,390 | ₹1,02,463.9 |
| 7 | First class 150 brick work in 1:4 cement:C.sand mortar in foundation including supply of all materials labour T&P etc required for proper completion of the work... all compt. As per SI no. 305(b) super structure | 16.13 | sqm | 5,760 | ₹92,908.8 |
| 8 | 12mm thick plaster in 1:3 cement:C.sand mortar all compt. As per SI no. 583 | 315 | cum | 190 | ₹59,850 |
| 9 | Providing and applying whice cement based putty of avrage thickness 1 mm of approved brand and manufature over the plastered wall surface toperage the surface even and smooth complet. As per SI no. DSR 13.8 | 315 | cum | 98 | ₹30,870 |
| 10 | Finishing wall with acrylic smooth exterior paint with silicone addilives of requitrd shade new work (Two or more coats applied) all complete ..as per DSR no. 13.47.1 | 315 | sqm | 123 | ₹38,745 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.50 MB
BOQ_2132402.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .