Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹71.8 LAccepted-Finance PLOT NO 34 SHAMBU NAGAR KORADI ROAD NAGPUR | NAGPUR | NAGPUR | MAHARASHTRA | ₹71.8 L | 1 | Accepted-Finance 1 |
| 2 | 2₹79.0 L+₹7.3 L (10.1%)Accepted-Finance OLD SAKKARDARA NEAR BUDDHA VIHAR UMRED ROAD NAGPUR 440024 | NAGPUR | NAGPUR | MAHARASHTRA | 440024 | ₹79.0 L+₹7.3 L (10.1%) | 2 | Accepted-Finance 2 |
| 3 | 3₹79.8 L+₹8.0 L (11.2%)Accepted-Finance | ₹79.8 L+₹8.0 L (11.2%) | 3 | Accepted-Finance 3 |
| 4 | 4₹81.8 L+₹10.0 L (13.9%)Accepted-Finance BLOCK NO 112 NEAR HATHI CHOWK JARIPATKA NAGPUR | NAGPUR | NAGPUR | MAHARASHTRA | ₹81.8 L+₹10.0 L (13.9%) | 4 | Accepted-Finance 4 |
| 5 | 5₹82.9 L+₹11.1 L (15.5%)Accepted-Finance MAHARASHTRA MH | JALGAON | MAHARASHTRA | 424101 | ₹82.9 L+₹11.1 L (15.5%) | 5 | Accepted-Finance 5 |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
8 Jul 2026, 5:00 pmClosed
EE z-10 nmc nagpur
EE z-10 nmc nagpur
Const. Of Cement Concrete Road at Kasturba Nagar Galli No. 2 and Galli No. 4 At Jaripatka In Pr. No. 01.
2026_NMCN_1313128_1
04/EE/Z-10/2026-27
Open Tender
Civil Works
Percentage
240 days
EE z-10 nmc nagpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹1.2 L
28 Aug 2026
1 Jul 2026
9 Jul 2026
1 Jul 2026
8 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Const. Of Cement Concrete Road | |||||
| 1.01 | Dismantling of existing B.T. Surface (flexible Pavement) to a depth of 50 mm. manually including loading of dismantled material to transport vehicle at site excluding lead charges | 3,483 | Sqm | 29 | ₹1,01,007 |
| 1.02 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate ( VSI grade finely washed crushed sand) conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, , cement content not to be less than 150 Kilogram/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant/ Weigh batch mixer, transported to site with all leads and lifts, laid with a paver with electronic sensor /by suitable means as approved by Engineer-in-charge , compacting with vibratory roller, finishing, curing and including preparation of sub-grade surface if required etc. complete. | 348.3 | Cum | 4,515 | ₹15,72,574.5 |
| 1.03 | Providing and laying 125 micron Low Density Polyethylene (LDPE) sheet confirming to IS 3395 : 1997 below concrete pavement including all materials and labour complete. | 3,240 | Sqm | 31 | ₹1,00,440 |
| 1.04 | Providing and laying in-situ M30 Grade unreinforced plain cement concrete pavement with max 20% fly Ash ( Fly-ash upto 20% by weight of Cement) over a prepared sub base with 43 grade cement , coarse and fine aggregate ( VSI grade finely washed crushed sand) conforming to IS 383, using fine and coarse aggregates combined gradation as per Table 600-3 of MORTH Specification 2013, mixed in a batching and mixing plant/ non tilting mixer and Weigh batcher as per approved mix design, admixtures, transporting to site, spreading, laying with approved make paver,compacted and finished in a continuous operation, finishing to lines and grades as directed by Engineer-in-charge and curing by curing compound /by providing cement vata in cement Mortar 1:8 @0.6m X 0.6m centre to centre, admeasuring 80 mm at bottom and 40 mm at top with depth of 75mm and maintaining the same throughout curing period by any other method approved by Engineer-in-charge. | 486 | Cum | 8,247 | ₹40,08,042 |
| 1.05 | Cutting transverse contraction joints 3 to 4 mm wide and depth 60mm. .in concrete slab using concrete cutting machine with diamond studded saw within 48 hours of casting of bay / slab etc. complete including subsequent widening of the groove 8 to 10 mm. wide at top having depth of 15 mm. as directed by Engineer incharge. | 5,658 | Rmt | 79 | ₹4,46,982 |
| 1.06 | Providing & Filling molten bitumen in joints cuts in cement road | 5,658 | Rmt | 20 | ₹1,13,160 |
| 1.07 | Removing rich mix cement concrete including stacking the spoils as directed with all leads, lifts etc, complete. | 328.5 | Cum | 580 | ₹1,90,530 |
| 1.08 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as
directed all sorts of soils. | 155.93 | Cum | 123 | ₹19,178.78 |
| 1.09 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader/ Paver on prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 401 -- Plant Mix Method and Grading - I Material | 259.25 | Cum | 2,839 | ₹7,35,996.56 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
dtp66.pdf
Tender Documents • 2.49 MB
BOQ_2252008.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .