| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.7 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹61.3 L+₹13.6 L (28.5%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹63.0 L+₹15.3 L (32.1%)Admitted-Finance 248 1 CHHEDIPURWA STATION ROAD BEHIND GURU NANAK SCHOOL GONDA UTTAR PRADESH 271001 | GONDA | UTTAR PRADESH | 271001 | L3 | Admitted-Finance | |
| 4 | L4₹70.7 L+₹23.0 L (48.1%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | Not Admitted-Fee/PreQual/Technical 0 DHANA TEJA BARARI DHANA TEJA MATHURA MATHURA UTTAR PRADESH 281005 | MATHURA | UTTAR PRADESH | 281005 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S SHUKLA ENTERPRISES L1 | ARK ENGINEERING L2 | M/S SMM INFRATECH PVT Ltd L3 | Piyush Enterprises L4 |
|---|---|---|---|---|---|---|---|
| 1.1033 KV Line items | |||||||
| 2.00 | Barbed Wire | 40 | kg | 6,000 ₹6,000 Lowest | 7,000 ₹7,000 | 6,000 ₹6,000 Lowest | 16,000 ₹16,000 |
| 3.00 | Danger board with clamps for 33 KV | 35 | no | 5,775 ₹5,775 Lowest | 8,750 ₹8,750 | 11,375 ₹11,375 | 17,500 ₹17,500 |
| 4.00 | holding clamps | 160 | no | 48,000 ₹48,000 Lowest | 64,000 ₹64,000 | 72,000 ₹72,000 | 1,04,000 ₹1,04,000 |
| 5.00 | channel F-bracket for STP pole | 15 | no | 4,500 ₹4,500 Lowest | 7,500 ₹7,500 | 8,250 ₹8,250 | 7,500 ₹7,500 |
| 6.00 | F bracket | 38 | no | 11,400 ₹11,400 Lowest | 15,200 ₹15,200 | 17,100 ₹17,100 | 30,400 ₹30,400 |
| 7.00 | Nut and bolt | 45 | kg | 5,625 ₹5,625 Lowest | 9,000 ₹9,000 | 6,750 ₹6,750 | 36,000 ₹36,000 |
| 8.00 | Red oxide paint | 10 | ltr | 3,000 ₹3,000 Lowest | 3,000 ₹3,000 Lowest | 4,000 ₹4,000 | 60,000 ₹60,000 |
| 9.00 | Alluminium paint | 10 | ltr | 4,000 ₹4,000 Lowest | 4,000 ₹4,000 Lowest | 5,000 ₹5,000 | 60,000 ₹60,000 |
| 10.00SS Items | |||||||
Tender Value
Refer Docs
EMD Value
₹90,000
Closing Date
6 Sept 2025, 12:00 pmClosed
SE EWC BASTI
SE EWC BASTI
CONSTRUCTION AND MODERANIZATION OF 33 11 Ss CHAUDHARY CHARAN SINGH DUMARIYAGANJ PUMP CANAL BHITHARIYA 2X5 MVA UNDER THE EDD DUMARIYAGANJ SDN UNDER THE HEAD OF DEPOSIT SCHEME 2024 25 IN BASE OF SEMI TERNKEY
2025_PVVNV_1065398_3
05/EWC(B)/2025-26
Open Tender
Electrical Works
Turn-key
BASTI
AS PER TENDER
2 documents required · 2 mandatory
₹5,900
SE EWC
₹90,000
11 Sept 2025
29 Aug 2025
6 Sept 2025
29 Aug 2025
6 Sept 2025
29 Aug 2025
33 KV Line items
Barbed Wire
Danger board with clamps for 33 KV
holding clamps
channel F-bracket for STP pole
F bracket
Nut and bolt
Red oxide paint
Alluminium paint
SS Items
6" Dia GI pipe 3 mtr. for 33 Kv cable protection
12*2 volt battery set & Invertor / charger with cabinet set for 33kv and 11 kv systems .
Copper Control Cable 4x2.5 mm²
Copper Control Cable 2x2.5 mm²
Transformer oil drum
Rubber Mat
Main Bus Bar complete with structure(A-type steel structure)
33 KV Bus isolator/Line isolator
33 KV Post /Lighting arrestor
33 KV fuse set structure
33 kv ct structure
33 KV PT structure
MS top channel 33 kv
Dropper channel
Substation Works
Shifting, Loading & Carriage of following material from store center to site
33 KV L.A./ Bus isolator/post insu./fuse set with structure/ Bus coupler(1)/11 kv IC Panel/ 11 kv OG panel/ TF control panel/CT/VCB/capacitor bank with structure,etc.complete.
carriage of 11 kv cables.
Erection and grouting of SS Structures(Bus-bar gantry,Terminal Gantry,isolator structures, LA structure,VCB stru,Post structures,CT stru,VCBs, etc complete work.)
Mounting, fitting & grouting of following equipments
33 KV L.A./Fuse set/CT/VCB//PI/BI/with struc.etc.complete work
33 kv control panel/11 kv IC panel/11 kv OG panel/11 kv bus coupler,capacitor bank and its panel ,etc.
Shifting of 5 MVA T/F about 50 Mtr. distance to Plinth,including oconnecting of jumpers,earthing,conservator tank, radiator & filling of T/F oil & complete work as per site req.
Laying of control cables
Making interconnection drawing and connection with all protective,meteriing relays/equipments /control systems complete work.
Dismantalling of old switchyard structures and cc work etc.including digging cc work as per site req.
Digging of Kaccha/Pakka Road for completion of work as per site req.
Repairing of old plinths as per site conditions
Plinth of foundation for power T/F as per site req.
Plinth & Foundation of VCB
Repairing of old permanent trench with cover.
construction of permanent trench base and cc wall in hanger side and brick wall 9inch in other side with cc cover of suitable sizes of 90cm depth 90cm width with installation of 2 no. parallel cable hangers made of ms angle at 1 mtr width in run as per requirement including material .(from control to pump house) and from Power TF to Control room as per site req.
Laying of 11 KV Cable Double ckt , LT cable D/C from both TF to incoming panel and outgoing panels to pump house with sand filling and cable tags,suitable size lugs etc.
Fabrication of cable tray of GI perforated sheet with support stand weldingat proper places for laying of cables including all material and work as per site req.
Laying of 11kv cables on cable tray complete work for outgoing panel to pump house.
Fabrication of cable flatform/cable rest for safely keeping standby cables in pump house as per site req.
11 kv cable boxes coupling with switchgear and TF
Jointing charges off 11 kv C/J Kit
Earthing of S/S Outdoor equipement (Fabrication Full switchyard Earthmat) by cutting of CC work as per site req.
Earthing of complete Indoor equipement
Power Transformer Delta neutral Earthing/ Body Earthing with providing neutal support(with gi pipe 1.5inch inch upto water level ,with one copper wire 6swg in delta.)
LT transformer Earthing with 20ft gi pipe neutral and body.
Dismantalling of pale fencing and gate etc.of switchyard and resetting of completeion of work as per site req.
Outdoor Switchyard & approach road lightening with 70w led light 16 sets including LT 4*16 mmsq. cable as per requirement including supply of 4 no. branded blowers and its power wiring , sockets,switches,mcb`s etc. and also supply and exhaust arrangement 4 no. in control room with control room lighting arrangement and wiring ,supply and installation of fans etc as per site req.
Plinth of foundation for LT 100 KVA T/F in switchyard including cable stand with supply and installation of 11kv bakelite fuse system,installation and partition wall between both TF with fencing.
painting of old and new switchyard fencing complete and switchyard structures.
Sub-station Name & Arrow shine Board complete(1.5*1.5 mtr. Iron sheet with stand)
Furniture of S/S (8 chair, 2 table(1 executuve office table and one 4*5 feet wooden table with racks), 1 bench, 2 stool),2 office chair(1 executive chair),1 chowki.
writing name on S/S building and all 11 KV switchgear pannels
T & P of S/S & switchgears (as per specifications)T & P of S/S as per specification,pliers 4 no, meggar 5 kv 1 no, wrench 1 set whole, hammer 1 no, 2 no Saw, 2 no. Axe, 2 no. long rope, 2 no. earth chain, 2 no. bamboo ladder,tongue tester, multimeter,leather bag, Ladder trolley 1 no.,safety belt 2no., pulley 1 no.,Expandable Discharge earth Rod for Earthing(01no.)
4.5 Kg. CO₂ fire extinguisher portable type
5 Kg. dry powder fire extinguisher portable type
Fire buckets (6 No.) with stand filled with dry sand
Max./Min. line diagram keyboard, hand gloves, earthing chain etc.
Other small items & works required to complete the work as per site engineers req and instruction.
Due to water logging area ,const. of side wall 30 inch height 9 inch width and filling of soil 2 ft in total , CC work complete with 4 inch base with brics s and sand cement with 3 inch cc flooring as per site req.
Cable stand of MS Channel for 33 KV for Cable stand and neutral stand and grouting,errectionm,plinthing in switchyard with (3200 mm two length jointed with 4 no.intermediate channel with clamp ) and also cable stand for 33kv incoming cable to switchyard from PPMC room.
Dismantalling of existing old damage switchgear panels in old control room.
Dimantalling/construction/Repairing of existing control room floor and trench complete work with materials as per site req.
Opeing of cable of old switchgear panels .
Dismounting/ dismantalling of old existing power Transformer and keeping it at suitable place including all works as per site req.
Opening of trench cover for windup of existing cable and resetting after work completion
Cleaning of existing trench filled with soil and debrises and filling of new sand, etc.
Laying out and windup of old and used/scrap existing cables complete work.
Dismounting/ dismantalling of old existing LT Transformer and keeping it at suitable place including all works.
Repairing of old switchyard fencing complete with ms flats and strips etc as per site req.
complete bus bar jumpering and misc works,supply of connectors as per site req.
Centrifusing and gasket change of Power Transformer as per requirement complete Work including,oil topup, Material,T&P and labour as per site req.
Installtion of capacitor bank with complete work and labour,etc. as per anx-1
Testing of S/S complete job with arrange ment of three phase generator,cables etc including labour, T&P as per site req.
Metering Work
Shifting, Loading & Carriage of following material on private truck at site
3x300 mmsq xlpe cable
33 KV C.T./P.T. Metering unit
33 KV Pilfer Proof Metering Unit
Mounting & Fitting of following equipment on erected structure
33 KV TVM
Laying of 33 KV Cable Double ckt from CT/PT to PPMC and PPMC to Terminal Gantry including cost of sand including underground trench.
Jointing charges for 33 kv jointing kit
Fabrication of Structure for mounting CT/PT unit with material with grouting ,earthing complete work.
Construction of 3x3.5 mtr PPMC room with gate as per requirement including trench , 1.5 mtr wide interlocking approach road from main road and flooring,lighting arrangement,power wiring and giving connection from control room,power sockets including supply of 2no. branded blower and power switches,mcb`s complete work.
6" Dia GI pipe 3 mtr. for 33 Kv cable protection
Earthing outdoor and indoor equipment with G.I. strip and gi pipe upto water level.
Installation of 33 KV Pilfer Proof resistant M/C in PPMC room.
Other small materials and jobs to complete the work.
Line work
Erection of interspacing poles with complete work.
Fixing of stay complete with work
Openening of existing damaged X Arm and f bracket
opening of jumpering, winding of pin insulator, disc insulator for tightening of loos conductor
Straightning of tilted poles with grouting including all work
Tightening/resagging of loose span including all work.
Rewinding of jumpering / winding of pin insulator/ disc insutor of tightening of loose conductor.
extra cost of pole grouting including all work.
Gaurding work complete
Plinthing of old./new STP pole .
Other small works required to complete work.
cutting of tree branches
Dumping of scrap materials as per instruction.
drawing,Design,Apporval and NOC charges of complete work.
ARK ENGINEERING (BID ID -5518633)
M/S SMM INFRATECH PVT Ltd (BID ID -5518698)
Piyush Enterprises (BID ID -5518386)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .