Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance SUBHASH NAGAR BALLIA | BALLIA | BALLIA | UTTAR PRADESH | Admitted-Finance |
| 2 | Admitted-Finance 134 1 PURVI BAGH DELHI ROAD MEERUT | MEERUT | MEERUT | UTTAR PRADESH | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹25.8 L
EMD Value
₹26,000
Closing Date
24 Jun 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
132 kv lalkuan campus, ghaziabad
maintenance of various line
2022_UPTCL_700832_1
T-21/ETC/GZB/2022-23
Open Tender
Electrical Works
Fixed-rate
365 days
various lines of muradnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
As per NIT
₹26,000
27 Jun 2022
19 May 2022
24 Jun 2022
19 May 2022
24 Jun 2022
19 May 2022
120 days
Amount
For 132 KV lines Periodic Tower to Tower patrolling emenrgency patrolling , cutting/lopping chopping of trees and Bamboo Koty, Replinishing of missing tower parts checking and tightening of jumpers( i.e 4 times in year). The work include.
1. 132 KV Modisteel-Lohiya Nagar Line-13.428 KM 2. 132 KV Muradnagar-Modisteel Line-6.59 KM 3. 132 KV Niwari Road-Partapur Line-14.451 KM 4. 132 KV Niwari Road-Muradnagar Line-9.885 KM
Opening /Cutting of nut-bolts of remaining cut pieces of tower member stolen by miscreants to be opened/cut safely with the help of gas cutter/hacksaw blade including all required labour and T & P for proper completion of work satisfactory.
Fabrication & fixing of tower parts/members from scrap GI angle including cartage of steel angles from the S/S store punching holes, proper tightening of nut & bolts, punching & chamfering of bolts at different locations of above transmission line.
Tack welding of new Nut & Bolts.
Replacement of damaged jumper at tension towers.
Tightening of jumpers at tension towers.
Replacement of damaged /punctured insulators string at different tower locations including carriage of material from store to work site of the above line.
Suspension string.
Tension string.
Lopping, Choping & cuting of trees branches in the 27 meter corridor of above line and stacking of above cuttings at proper place far from the line.
Preventive and breakdown maintenance of 132 kv lines panther conductor of with all other associated work to complete the job satisfactorily.
Emergency patrolling of 132 KV Lines in the event of triping/breakdown to find out fault location and type of fault.
Tightening /fixing of missing/displaced vibration dampers/arcing horn.
Removal of bird nest from cross arm of tension/suspension towers Mannual checking and cleaning of porcelain/composite polymer insulator strings at cross arm along with.
For 220 KV lines Periodic Tower to Tower patrolling emenrgency patrolling , cutting/lopping chopping of trees and Bamboo Koty, Replinishing of missing tower parts checking and tightening of jumpers( i.e 4 times in year). The work include
1. 220 KV Muradnagar-Sikendrabad Line(upto Sikandrabad LILO point)-36 KM 2. 220 KV Muradnagar- Dadri line (upto Dadri LILO point)-24 Km 3. 220 KV Interconnector -II (From 400 KV Muradnagar-I to 220 KV S/S Muradnagar)-3.5 KM 4. 220 KV Interconnector-I (From 400 KV S/S Muradnagar-I to 220 KV S/S Muradnagar)-8.83 KM 5. 220 KV Muradnagar-Modipuram Line-42.2 Km 6. 220 KV Muradnaar-Autor Line (from 220 Kv S/S Muradnagar to 400 KV Autor)-14 Km 7. LILO of 220 KV Muradnagar-Modipuram Line at 220 KV S/S Faridnagar-15 Km 8.220 KV Faridnagar-Hapur(765KV) line-11.28 Km
Opening /cutting of nut-bolts of remaining cut pieces of tower members stolen by miscreants to be opened /cut safely with the help of gas cutter/hacksaw blade including all required labour and T &P for proper completion of work satisfactory.
Fabrication & Fixing of Tower part /Members From scrap GI Angle Includig Cartage of steel angle from the sub-station store, panching holes, proper placement tightening of Nut & Bolts, punching & chamfering of bolt at deffeerent location of above transmission Line
Tack welding of new Nuts & Bolts.
Replacement of damaged jumpers at tension tower.
Tighting of jumpers at tension tower
Loping, Chopping & Cutting of trees branches in the corrider of 220 KV Lines, Stacking at above Cutting At proper place far from the Line.
Tighting/Fixing of missing/ displaced vibration dumper arcing horn.
Replacement of damaged/punctured Polymar Insulator string at different Tower Location Including carriage of material from store to work site of the above line.
A) Suspension String.
B) Tension String.
Emergency pertolling of 220 KV Line during tripping to detect the exact fault location & Type of fault, five times in one years.
Removal of bird nest from cross arm of tension/suspension towers manual checking and cleaning of porcelain/composite polymer insulator strings at cross arm along with.
Preventive and breakdown maintenance of 220kV lines zebra/dear conductor of with all other associated work to complete the job satisfactorily.
For 400 KV lines Regular Tower to Tower ground petrolling & tower top patrollong whenever/whenever required of 400 KV Muradnagar -Ator (upto ataur LILO point ) & 400 KV Ator- Muzaffarnagar Line. ( Upto Muzaffarnagar LILO Point). Patrolling work consist of detection of the defects like missing/theft Tower members, hot points, punctured/flashed over instulator disk, dislocation of vibration dampers/damaged conductor/ earthwire, checking of foundation/stubs & position of tree in the cordidor of 40 Mtr. of the line, removing of bird nests from towers. petrolling shall be done regularly on quarterly basis i.e. 4 times in years. ( The Total lenth- 90.00 KM)
Opening/cutting of nut bolts of remining cut pieces of tower members stolen by miscreants to opened/cut safely with help of gas cutter/backsaw blade including all required labour and T&P for proper complition of wark setisfactory.
Fabricaton & fixing of Tower parts/Members From scrap GI Angle Including Cartage of steel angle from the sub-station store, punching holes, proper placement tightening of Nut & Bolt, punching & chamfering of bolt at defferent location of above transmission Line
Tack Welding of new Nut-Bolts.
Replacement of damaged jumpers at tension tower.
Tightening of jumpers at tension tower on both sides.
Replacement of dameged /punctured Polymer insulators string at different tower locetions including carriage of material from store to work site of the above line.
a) Suspension string
b) Tension string.
Loping, Chopping & Cutting of trees branches in the corridor of 400 KV line & Stacking of above Cutting at proper place far from the Line.
Emergency petrolling of 400 KV lines during tripping to detective the exact fault location and type of fault.
Preventive and breakdown maintenance of 400kV lines twin moose conductor of with all other associated work to complete the job satisfactorily.
Removal of bird nest from cress arm of tension/suspension towers Manual checking and cleaning of porcelain/composite polymer insulator strings at cross arm along with.
Jagad Electrical & Fabricators
KUMAR TRADING COMPANY
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .