| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 LAdmitted-Finance SALEM | TAMIL NADU | 621011 | ₹11.8 L | L1 | Admitted-Finance |
| 2 | L2₹11.9 LAdmitted-Finance | ₹11.9 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | J S Electricals L1 | A R S TRADERS L2 |
|---|---|---|---|---|---|
| 1.00Construction of 20,000 Lit OHT at Ninarpalayam H/O Paithur Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard Hard stiff clay blcak cotton, hard red earth, shales, murram, etc.SS 20Bgravelly soil as per SS 20B | 37.93 | Cum | 260 ₹9,861.80 | 265 ₹10,051.45 |
| 3.00 | Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications | 1.76 | Cum | 2,059 ₹3,623.84 | 2,060 ₹3,625.60 |
| 4.00 | Refilling the basement with excavated earth other than sand complying the Standard specification | 28.99 | Cum | 45 ₹1,304.55 | 46 ₹1,333.54 |
| 5.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | 2.65 | Cum | 5,780 ₹15,317 | 5,790 ₹15,343.50 |
| 6.00Reinforced cement concrete 1:1.5:3mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete .for 10 cum | |||||
| 7.00 | 1.5m to 4.5m below GL | 3.36 | Cum | 9,530 ₹32,020.80 | 9,560 ₹32,121.60 |
| 8.00 | 0 to 1.5m below GL | 1.18 | Cum | 9,391 ₹11,081.38 | 9,400 ₹11,092 |
| 9.00 | 0 m to 4.5m above GL | 2.26 | Cum | 9,530 ₹21,537.80 | 9,530 ₹21,537.80 |
| 10.00 | 4.5m to 7.32m above GL | 21.04 | Cum | 9,670 ₹2.0 L | 9,670 ₹2.0 L |
Tender Value
₹12 L
EMD Value
₹12,000
Closing Date
22 Jan 2026, 3:00 pmClosed
BDO BP Attur
BDO Office Taluk Office Campaus Attur
Construction of 20000 Litre OHT at Ninarpalayam H/O Paithur Panchayat Attur Block at Salem District MLACDs 2025-26
2026_RDTN_643203_1
Roc No.4454/2025/A3-MLA 2025-26
Open Tender
Civil Works
60 days
BDO Office Attur
As Per Tender Documents
3 documents required · 3 mandatory
₹0
₹12,000
BDO Office Attur
27 Jan 2026
13 Jan 2026
22 Jan 2026
13 Jan 2026
22 Jan 2026
13 Jan 2026
14 Jan 2026
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard Hard stiff clay blcak cotton, hard red earth, shales, murram, etc.SS 20Bgravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Refilling the basement with excavated earth other than sand complying the Standard specification
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
1.5m to 4.5m below GL
0 to 1.5m below GL
0 m to 4.5m above GL
4.5m to 7.32m above GL
7.32 m to 10.98 m above GL
Plane Surface Below G.L.
Square columns Below GL and 0 to 3.30m
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
Painting two coats with approved Exterior Emulsion over one coat of Priming coat of Cement Paint over cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. (S.I No. 359 B) ( NEW SURFACE)
Providing Manhole cover of size 0.60mx0.60m in RCC 1:1.5:3 with sutable reinforcement
Providing and fixing of RCC Outer access Ladder
Providing and fixing of RCC inner access ladder in RCC 1:11/2 :3 (one cement,one and half sand and three aggregate) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centring,shuttering charges, mixing concrete,curing etc. to required height and clear width of 45 cm consisting of 2 nos. of vertical post of 10 cm x 15 cm and step slab of 25mm x 25mm etc.complete and as directed by TWAD Board Officers.
Providing 110mm PVC vent cowl arrangements mosquito proof nylon net and as directed by TWAD Board officers
Supply and fixing of cut stone of size 0.30m x 0.30m x 0.15m in CM 1;3(one cement and three sand) below inlet pipe for Service Reservoir as directed by TWAD Board Officers.
65 mm GI Pipe
50 mm GI Pipe
65 mm GI Coupling
65mm GI Elbow
50mm GI Elbow
50mm GI Couping
50mm x 65 GI Reducer
50 mm GM Gatevalve
65 mm GMGatevalve
Earth work excavation and deposting on bank with an initial lead of 10m & lift of 2m for pipe laying works with standard trench width and depth etc., complete
Supply and delivery of 63mm OD 4 KSC PVC Pipe as per ISI Marked Standarad specification.
Lowering PVC pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste.
Refilling the excavated earth as per the standard specifications
Labour charges for GI pipe connection to the OHT, for inlet, outlet, overflow and scour arrangements including cutting and threading, earth work excavation & refilling.
Earth work excavation and deposting on bank with an initial lead of 10m & lift of 2m for pipe laying works with standard trench width and depth etc., complete
Cement concrete 1:4:8 mix using 40mm ISS metal inculding cost and conveyance of all materisl to site and labour charges for mixingfor mixing, laying and curing etc complete
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conbeyance of all materials to site and all labour charges etc complete
Filling the soak pit with 225 mm boulders as per specification
Filling the soak pit with 40mm metal as per specification
Filling the soak pit with 20mm metal as per specification
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Painting two coats with approved cement paint over one priming coat of white cement over cement plastered wall surface and ceiling including cleaning preparing the surface and curing etc., complete
Supplying and fixing P.V.C down fall pipe of 110m dia with necessary shoes, bends,& clamps etc.,
Supplying and fixing of RCC rings 750mm dia for Leach pit including all charges etc complete
Casting and fixing of RCC precast slab of 75mm thick 1:2:4 using 20mm HBG jelly
Supplying and fixing of cover slab of 750mm dia including all charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
BOQ_770700.xls
BOQ • 0.28 MB
Paithur.pdf
Tender Documents • 0.78 MB
Download all tender documents and submit your bid