Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹17.4 LAccepted-AOC | 1st | Accepted-AOC 1st lowest | |
| 2 | 2nd₹18.4 L+₹82,478 (4.69%)Rejected-Finance | 2nd | Rejected-Finance 2nd lowest | |
| 3 | 3rd₹18.7 L+₹1.2 L (6.54%)Rejected-Finance KUKIMUN VILLAGE CHURACHANDPUR MANIPUR 795124 | BISHNUPUR | MANIPUR | 795124 | 3rd | Rejected-Finance 3rd lowest | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Physical Tender Fee, EMD and other supporting Offline documents not submitted. |
Tender Value
Refer Docs
EMD Value
₹32,000
Closing Date
28 Jan 2022, 5:00 pmClosed
Sr. Manager (Mech.), PnC Division
Office of the Sr. Manager (Mech.), PnC Division, NHPC Ltd., Loktak Power Station, Komkeirap, Manipur-795124
Repairing of Drain, Protection Wall and Culvert for approach road to villages between RD 4.00 Km to RD 12 Km on Loktak-Leimatak road.
2022_NHPC_667254_1
NH-LPS-HOP013(12)/41/2021-CD-I and III/960
Open Tender
Civil Works
Works
90 days
NHPC Ltd., Loktak Power Station
Please refer Tender documents.
6 documents required · 6 mandatory
₹590
NHPC Ltd.
₹32,000
18 Mar 2022
7 Jan 2022
3 Feb 2022
7 Jan 2022
28 Jan 2022
7 Jan 2022
Amount
Earth work in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m. b) Hard/Dense Soil.
Providing and laying cement concrete in foundation and plinth excluding the cost of centering and shuttering. 2.1.5) 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size).
Polygonal rubble masonry/R.R masonry (uncoursed/brought to courses)/ squared rubble masonry (uncoursed/brought to courses) with hard stone of approved quality in foundation & plinth in cement mortar 1:6 (1 cement: 6 fine sand) i/c levelling up with cement concrete 1:6:12 (1 cement: 6 course sand: 12 stone aggregate 20mm nominal size) at plinth level.
Providing form works i/c centering and shuttering so as to give a rough finish, strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4mt and removal of the same for in-situ reinforced concrete and plain concrete work in. Flat surface such as suspended floor, roofs landings and the like.4.1.2.1 Floors etc. upto 200mm in thickness.
Steel reinforcement for RCC work including in straightening, cutting, bending, placing in position and binding all complete. b) Thermo- Mechanically Treated Bars.
Reinforcement cement concrete work in beams, suspended floors, roofs having slope upto 15°landing, balconies, shelves & chajjas, lintels, bands, plain window sills, staircase upto floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement:1.5 coarse sand:3 graded stone aggregate 20mm nominal size)
12mm cement plaster 1:4 (1 cement:4 coarse sand)
Neat cement punning
Flush or ruled pointing on stone work cement mortar 1:3 (1 cement:3 fine sand)
Clearance of land slips in all type of soils hill road i/c disposal of excavated soil, rubbish etc. upto a lead of 50 metres.
Add EPF @ 0.65%
Add CESS @ 1%
Add GST @ 18%
M/S L NEHHAO HAOKIP
M/S SONGKHOLAL HAOKIP
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .