| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-AOC 6 KRIPANATH DUTTA ROAD KOLKATA 700 002 | KOLKATA | KOLKATA | WEST BENGAL | 700002 | L1 | Accepted-AOC STANDS L1 SATISFACTORILY | |
| 2 | L2₹1.3 L+₹11,494.19 (9.91%)Rejected-Finance 344 1 SB GORAI ROAD HILL VIEW PARK NORTH ASANSOL | ASANSOL | WEST BENGAL | L2 | Rejected-Finance NOT L1 BIDDER | |
| 3 | L3₹1.4 L+₹21,231.20 (18.3%)Rejected-Finance PATRA MARKET KRISHANAGAR NADIA | KRISHANAGAR | NADIA | L3 | Rejected-Finance NOT L1 BIDDER |
Tender Value
Refer Docs
EMD Value
₹3,000
Closing Date
3 Apr 2024, 3:30 pmClosed
Executive Engineer, Asansol Mech. Divin, P.H.E.D
Office of the Executive Engineer,JANASASTHYA KARIGORI BHAVAN,SEN-RALEIGH ROAD,PASCHIM BARDHAMAN,713 305
Repairing and overhauling of 750 KVA Transformer No-01 and other allied works at Searsole Boosting Station under RCFA Part-II Water supply scheme.
2024_PHED_683357_4
WBPHED /EE/AMD/NIeT-70 of 2023-2024
Open Tender
Miscellaneous Works
Item Wise
20 days
SEARSOLE
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
9 Aug 2024
11 Mar 2024
5 Apr 2025
11 Mar 2024
3 Apr 2024
11 Mar 2024
Amount
Disconnection of the 750 KVA transformer from H.T. & L.T. side with proper protection by engaging skilled Electrician.(For Transformer No-01)
Drain out the old transformer oil from the transfomer up to the bottom level and keep the same in an empty drum as per direction.( 700 Ltrs approx.) (For Transformer No-01)
Supply and delivery of transformer oil as per IS:335 in a sealed drum.(Make-Servo/Electrol/other approved make)
Making necessary arrangements by loosening of nuts & bolts in order to lift up the transformer tank top cover, conservator tank cover, inspection cover, Explotion Vent, oil gauges, Drain valve, Ratio handle switch/Tap Changer, in order to changethe old gasket with new ones as per direction of EIC.
Supply delivery and fitting,fixing cork gasket,inner and outer portion of the porcelin bushing and at HV and LV side including tank top cover/inspection cover aftewr taking out the damaged gaskets by engaging skilled technician and as per direction.(For Transformer No-01)
Placing the top cover and inspection cover and Buchholz relay,conservator tank in proper position and tighting of nuts and bolts after cleaning of the surface sludge of core and coil assembly with hot oil through filter machine for 750 KVA transformer as per direction of EIC.
Supply and fitting fixing Copper Bus bar as per specification. (For Transformer No-01)
Filling the transformer oil through filter machine by old oil and new supply oil after filtration to the 750 KVA transformer engaging skilled and unskilled personnel for increasing IR value as per direction including hire charges of oil filter machine and oil testing equipment(Mainly Break Down Voltage) as per direction of EIC.(Extra Newly Supplied oil stored at site in a cooled dry place)
Making necessary connection of transformer at HT and LT sides after cleaning,washing tightened up the cable end socket and rapping with new adhesive and insulation tapes,including testing and commissioning all complete as per direction of EIC.(For Transformer No-01))
Add. GST@18%
Add. Cess@1%
EASTERN INDIA SALES AND SERVICE
Tarun Kumar Bhattacharya
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .