Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹3.6 Cr
EMD Value
₹3.6 L
Closing Date
23 Oct 2026, 5:30 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Chief Construction Engineer, R.W.Circle, BAM,
O/O Chief Construction Engineer, RWC, BAM Near Income Tax Office Ambapua-11
Construction of H.L.Bridge over Local Nallah on Sainipada PMGSY road to Indriaj road under SBY in the District of Kandhamal for the year 2025-26 (Span 2 x 25.36m-Pile Foundation)
2026_CERWI_143698_1
Online Tender/14-2026-27/BPR
National Competitive Bid
Civil Works - Bridges
Percentage
365 days
Balliguda
2 documents required · 2 mandatory
₹10,000
₹3.6 L
Yes
15 Oct 2026
15 Oct 2026
26 Oct 2026
15 Oct 2026
23 Oct 2026
15 Oct 2026
15 Oct 2026 - 21 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in cutting in all kinds of soil (over burdern earth) with all leads & lifts & depositing the excavated materials away from the working areas complete as per specification &direction of the Engineer-in-Charge including cost of all labour & T&P articles, Cess, required for the work etc. complete in all respect upto bed level. | 406.95 | One Cum | 259.6 | ₹1,05,644.22 |
| 2 | Supplying, fitting, fixing 8mm thick permanent steel liner plate for piles including cost of all materials, labour for cutting, bending, welding, installation,all required T & P and machinery etc. complete as per section 1100, 1900 of MORT&H specifications for Road and Bridge works of (5th Revision) & Direction of Engineer-in charge. | 20.45 | One MT | 1,06,879.64 | ₹21,85,688.64 |
| 3 | Sinking of steel liner plate for piles including cost of all materials, labour T & P and machinery etc. complete as per Direction of Engineer-in charge. | 86.4 | One Rmt | 836.03 | ₹72,232.99 |
| 4 | Providing, driving and installing bored cast in situ RCC M-35 grade for pile of 1200mm dia to carry a safe load not less than specified excluding cost of steel liner & reinforcement steel but including cost of shoe and length of pile to be embedded in pile cap etc complete, concrete produced by batching, using required quantity of admixture as per IS:9103-I and as per section 900, 1000, 1100, 1500 & 1700 of MORT&H specifications for Road and Bridge works of (5th Revision) including watering, curing and cost, conveyance, Cess, royality, additional charges, DMF 10% & EMF 5% over royalty, taxes of all materials etc. with all labour and T&P required for the work including dewatering, shuttering if necessary complete as per direction of Engineer – in – charge & Direction of Engineer-in charge. | 134.4 | One Rmt | 12,687.09 | ₹17,05,144.9 |
| 5 | Providing RCC of design mix of M-300 grade of controlled qulity having cube strength of 300kg./cm2 in design mix with minimum quantity of cement as specified in IRC Code of 150 mm. cubes at 28 days curing after mixing & tests conducted in accordance with relevant clauses of IS 456/IS 516/IRC 16/1987/IRC-78/1983 using crusher broken hard granite course aggregate of 10 mm. to 20mm. sizes obtained from approved quary & proportion as specified in clause-302.6.2 of IRC 21/1987, IS-10262 & including hoisting, lowering & laying concrete in layers | - | - | - | - |
| - | compacting with vibrators watering & curing for 28 days including water tight steel centering & shuttering & form works finishing the exposed surface smooth providing beads & grooves wherever necessary including cost, conveyance royalties, additional charges, DMF 10% & EMF 5% over royalty Cess and all other taxes of all materials with all leads & lifts, cost of all labour T&P & machineries etc. required for the work including dewatering if necessary, complete in all respects as per direction of the Engineer-in-Charge but excluding cost, conveyance of tor steel & binding wire & labour charges for straightening, cutting, bending, binding welding & tying the grills lapping spacing etc. where ever necessary & hoisting & placing in position ( to be paid separately as required for RCC works) | - | - | - | - |
| - | Abutment and Pier shaft | 85.07 | One Cum | 9,441.5 | ₹8,03,188.4 |
| - | Abutment & Pier cap | 11.47 | One Cum | 9,140.7 | ₹1,04,843.83 |
| - | Dirt wall | 14.73 | One Cum | 12,449.4 | ₹1,83,379.66 |
| - | Approach Slab | 17.33 | One Cum | 7,636.75 | ₹1,32,344.88 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
Tendernotice_2.pdf
PDF • 3.17 MB
BOQ_614332.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .