Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
26 Oct 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
BDO, Bhuban
Office of the BDO, Bhuban
Development of tourism infrastructure at Buddheswara Temple, Bhuban in Dhenkanal District
2026_PRBBN_143128_1
BHUBAN 04/2026-27
Open Tender
Civil Works - Others
Percentage
180 days
Dhenkanal
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹1.4 L
Yes
12 Oct 2026
12 Oct 2026
27 Oct 2026
12 Oct 2026
26 Oct 2026
12 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of New Half Height Boundary Wall | |||||
| 1.01 | Earthwork in excavation in all types of soil for site leveling, foundation, pits, trenches and other civil works upto and including 1.5metre depth and stacking the soil upto a lead of 100 metre and including dewatering, removing slush, shoring and strutt | 95.33 | cum | 311.5 | ₹29,694.67 |
| 1.02 | Filling at all depth with available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 15cm in depth: consolidating each deposited layer by ramming and watering complete (lead upto 100m) as directed by | 63.87 | Cum | 173.07 | ₹11,053.98 |
| 1.03 | Supplying and filling sand in foundation and over areas including watering, ramming, consolidating and dressing, labours, tools, taxes etc. all complete as per the specification and direction of Engineer-In-charge. | 7.94 | Cum | 541.44 | ₹4,301.2 |
| 1.04 | Providing and laying plain cement concrete 1:3:6 (1 cement : 3 sand : 6 stone agregate 40mm nominal size) as levelling course in foundation and plinth etc. including tempering, curring, shuttering etc. complete all depth and height. | 7.94 | Cum | 6,342.03 | ₹50,381.09 |
| 1.05 | Providing, lifting, hoisting and laying Reinforced cement concrete of M-20 grade as per approved designs and drawings, to be mixed in concrete mixture including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing fo | - | - | - | - |
| 1.07 | Footing | 16.62 | Cum | 6,719.79 | ₹1,11,682.91 |
| 1.08 | Column | 15.66 | Cum | 16,102.65 | ₹2,52,167.5 |
| 1.09 | Tie Beam | 9.75 | Cum | 7,594.2 | ₹74,043.45 |
| 1.1 | Cwall Top Beam | 3.9 | Cum | 14,433.83 | ₹56,291.94 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
Tendernotice_2.pdf
PDF • 2.12 MB
BOQ_613296.xls
BOQ • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .