| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.6 LAccepted-Finance | ₹12.6 L | L1 | Accepted-Finance Accept |
| 2 | L2₹12.8 LRejected-Finance | ₹12.8 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | VRK Construction L2 | SATHGURU BABAJI TRADERS L1 |
|---|---|---|---|---|---|
| 1.00Name of Work: Providing Paver block at HSC Building Front side in Athipalayam H/o,Athipalayam Panchayat.SS Kulam union in Coimbatore District under UNION GENERAL FUND 2025-2026-Package No. TN 01-SSKM-01 | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 mt and initial lift of 2mt in Hard Gravelly soil for foundation as per specification SS 20 B. | 79.36 | Cum | 135 ₹10,713.60 | 131.5 ₹10,435.84 |
| 3.00 | Cement Concrete 1:4:8 (One cement, four sand and eight aggregates) using 40mm HBG stone for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.. | 6.09 | Cum | 6,474 ₹39,426.66 | 5,474 ₹33,336.66 |
| 4.00 | Supplying & erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surface in all cross bracings using mild steel sheets etc., | 106.68 | Sqm | 350 ₹37,338 | 330 ₹35,204.40 |
| 5.00 | Cement Concrete 1:3:6 (One cement, four sand and eight aggregates) using 20mm HBG stone for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.. | 15.99 | Cum | 7,227 ₹1.2 L | 6,227.5 ₹99,577.73 |
| 6.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | 155.79 | Cum | 2,592 ₹4.0 L | 2,592 ₹4.0 L |
| 7.00 | Supplying and laying of Interlocking Paver Block Stone 80mm thk. Over a base layer of sand filling incl. Cost of materials laying and Labour charges etc., | 519.28 | Sqm | 919 ₹4.8 L | 919 ₹4.8 L |
| 8.00 | Provision for Supply and erection of Scheme Name Board cum Citizen Board | 1 | Nos | 4,500 ₹4,500 | 4,500 ₹4,500 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,95,942 ₹2.0 L | 1,91,535 ₹1.9 L |
Tender Value
₹12.7 L
EMD Value
₹13,000
Closing Date
9 Jan 2026, 3:00 pmClosed
The Block Development officer(BP),s.s.kulam Union
BDO Office S.S kulam
Providing Paver block at HSC Building Front side in Athipalayam H/o Athipalayam Panchayat
2026_RDTN_639324_1
684/2024/A2
Open Tender
Civil Works - Others
Athipalayam
Providing Paver block at HSC Building Front side in Athipalayam H/o Athipalayam Panchayat
4 documents required · 4 mandatory
₹0
₹13,000
Yes
12 Jan 2026
5 Jan 2026
9 Jan 2026
5 Jan 2026
9 Jan 2026
5 Jan 2026
Amount
Earth work excavation and depositing on bank with in initial lead of 10 mt and initial lift of 2mt in Hard Gravelly soil for foundation as per specification SS 20 B.
Cement Concrete 1:4:8 (One cement, four sand and eight aggregates) using 40mm HBG stone for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete..
Supplying & erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surface in all cross bracings using mild steel sheets etc.,
Cement Concrete 1:3:6 (One cement, four sand and eight aggregates) using 20mm HBG stone for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete..
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Supplying and laying of Interlocking Paver Block Stone 80mm thk. Over a base layer of sand filling incl. Cost of materials laying and Labour charges etc.,
Provision for Supply and erection of Scheme Name Board cum Citizen Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
VRK Construction (BID ID -1557654)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.41 MB
tech.pdf
Tender Documents • 1.04 MB
pricebid.pdf
Tender Documents • 0.91 MB
BOQ_765349.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid