| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.2 Cr+₹6.2 L (5.21%)Rejected-Finance | ₹1.2 Cr+₹6.2 L (5.21%) | L2 | Rejected-Finance L2 |
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
13 Jan 2020, 3:00 pmClosed
Project Director DRDA Thoothukudi
O/O Project Director DRDA Thoothukudi
Improvements to 11 No of roads in Udangudi Panchayat Union of Thoothukudi District under SCPAR 2019-20 - Package No TN/TUT-03-SCPAR(2019-20)
2019_RDTN_146829_1
PD,DRDA,Thoothukudi Lr.No.A4/5457/2019 dt 11.11.19
Open Tender
Civil Works - Roads
Item Rate
180 days
Thoothukudi District
As per tender Schedule
4 documents required · 4 mandatory
₹0
₹1.6 L
O/O Project Director DRDA Thoothukudi
6 Jan 2021
15 Nov 2019
13 Jan 2020
15 Nov 2019
13 Jan 2020
21 Nov 2019
21 Nov 2019
Amount
Strenthening of km 2/4 of MM road to Anaiyoor road km 0/0-0/6 @ Nangaimozhi Panchayat in Udankudi Block under SCPAR - 2019-20 Package No.03
Clearing and scrubbling by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300 mm girth. Km 0/0-0/6
Picking the existing B.T.Surface including all labour charges etc. complete Km 0/0-0/6
Earth Work Excavataion and depositing on back with an initial of 10m and lift 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20A Km 0/0-0/600
Providing and Laying Red Gravel for soling & for side berms to 75mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Primer coat over the WMM surface using 7.00 Kg of bituminous emulsion SS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying tack coat over the primed WMM surface using 2.50 Kg of bituminous emulsion RS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing HM stones of size 0.75 x 0.23 x 0.10
Strenthening of Thangai kailasapuram road km 0/0-0/8 @ Vengataramanujapuram Panchayat in Udankudi Block under SCPAR - 2019-20 Package No.03
Clearing and scrubbling by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300 mm girth. Km 0/0-0/750
Picking the existing B.T.Surface including all labour charges etc. complete Km 0/0-0/750
Earth Work Excavataion and depositing on back with an initial of 10m and lift 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20A Km 0/0-0/750
Providing and Laying Red Gravel for soling & for side berms to 75mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Primer coat over the WMM surface using 7.00 Kg of bituminous emulsion SS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying tack coat over the primed WMM surface using 2.50 Kg of bituminous emulsion RS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing HM stones of size 0.75 x 0.23 x 0.10
Strenthening of Amarapuram road km 0/0-0/6 @ Madhavankurichi Panchayat in Udankudi Block under SCPAR - 2019-20 Package No.03
Clearing and scrubbling by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300 mm girth. Km 0/0-0/410
Picking the existing B.T.Surface including all labour charges etc. complete Km 0/0-0/410
Earth Work Excavataion and depositing on back with an initial of 10m and lift 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20A Km 0/0-0/410
Providing and Laying Red Gravel for soling & for side berms to 75mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Primer coat over the WMM surface using 7.00 Kg of bituminous emulsion SS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying tack coat over the primed WMM surface using 2.50 Kg of bituminous emulsion RS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing HM stones of size 0.75 x 0.23 x 0.10
Strenthening of KM 3/6 Paramakurichi Udangudi road Athiyadithattu road km 0/0-0/4 @ Manadthsndupathu Panchayat in Udankudi Block under SCPAR - 2019-20 Package No.03
Clearing and scrubbling by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300 mm girth. Km 0/0-0/4
Picking the existing B.T.Surface including all labour charges etc. complete Km 0/0-0/4
Earth Work Excavataion and depositing on back with an initial of 10m and lift 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20A Km 0/0-0/400
Providing and Laying Red Gravel for soling & for side berms to 75mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Primer coat over the WMM surface using 7.00 Kg of bituminous emulsion SS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying tack coat over the primed WMM surface using 2.50 Kg of bituminous emulsion RS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing HM stones of size 0.75 x 0.23 x 0.10
Strenthening of Kavadi pirai road km 0/0-0/4 @ Kulasekarapattinam Panchayat in Udankudi Block under SCPAR - 2019-20 Package No.03
Clearing and scrubbling by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300 mm girth. Km 0/0-0/4
Picking the existing B.T.Surface including all labour charges etc. complete Km 0/0-0/4
Earth Work Excavataion and depositing on back with an initial of 10m and lift 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20A Km 0/0-0/400
Providing and Laying Red Gravel for soling & for side berms to 75mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Primer coat over the WMM surface using 7.00 Kg of bituminous emulsion SS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying tack coat over the primed WMM surface using 2.50 Kg of bituminous emulsion RS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing HM stones of size 0.75 x 0.23 x 0.10
Strenthening of Sivaloor AD Colony road km 0/0-0/4 @ Chettiyapathu Panchayat in Udankudi Block under SCPAR - 2019-20 Package No.03
Clearing and scrubbling by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300 mm girth. Km 0/0-0/4
Picking the existing B.T.Surface including all labour charges etc. complete Km 0/0-0/4
Earth Work Excavataion and depositing on back with an initial of 10m and lift 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20A Km 0/0-0/400
Providing and Laying Red Gravel for soling & for side berms to 75mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Primer coat over the WMM surface using 7.00 Kg of bituminous emulsion SS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying tack coat over the primed WMM surface using 2.50 Kg of bituminous emulsion RS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing HM stones of size 0.75 x 0.23 x 0.10
Strenthening of Veerakaliammankovil road km 0/0-0/6 @ Kulasekaranpattinam Panchayat in Udankudi Block under SCPAR - 2019-20 Package No.03
Clearing and scrubbling by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300 mm girth. Km 0/0-0/530
Picking the existing B.T.Surface including all labour charges etc. complete Km 0/0-0/530
Earth Work Excavataion and depositing on back with an initial of 10m and lift 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20A Km 0/0-0/530
Providing and Laying Red Gravel for soling & for side berms to 75mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Primer coat over the WMM surface using 7.00 Kg of bituminous emulsion SS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying tack coat over the primed WMM surface using 2.50 Kg of bituminous emulsion RS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing HM stones of size 0.75 x 0.23 x 0.10
Strenthening of Old Post office road km 0/0-0/8 @ Kulasekarapattinam Panchayat in Udankudi Block under SCPAR - 2019-20 Package No.03
Clearing and scrubbling by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300 mm girth. Km 0/0-0/475
Picking the existing B.T.Surface including all labour charges etc. complete Km 0/0-0/475
Earth Work Excavataion and depositing on back with an initial of 10m and lift 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20A Km 0/0-0/475
Providing and Laying Red Gravel for soling & for side berms to 75mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Primer coat over the WMM surface using 7.00 Kg of bituminous emulsion SS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying tack coat over the primed WMM surface using 2.50 Kg of bituminous emulsion RS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing HM stones of size 0.75 x 0.23 x 0.10
Strenthening of KM 12/0 Thiruchendur Kulasai - Udankudi road to km 0/0-0/8 of bye pass road km 0/0-0/6 @ Kulasekarapattinam Panchayat in Udankudi Block under SCPAR - 2019-20 Package No.03
Clearing and scrubbling by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300 mm girth. Km 0/0-0/542
Picking the existing B.T.Surface including all labour charges etc. complete Km 0/0-0/542
Earth Work Excavataion and depositing on back with an initial of 10m and lift 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20A Km 0/0-0/542
Providing and Laying Red Gravel for soling & for side berms to 75mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Primer coat over the WMM surface using 7.00 Kg of bituminous emulsion SS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying tack coat over the primed WMM surface using 2.50 Kg of bituminous emulsion RS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing HM stones of size 0.75 x 0.23 x 0.10
Strenthening of Melamalayan street road 0/0-0/6 @ Kulasekarapattinam Panchayat in Udankudi Block under SCPAR - 2019-20 Package No.03
Clearing and scrubbling by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300 mm girth. Km 0/0-0/262
Picking the existing B.T.Surface including all labour charges etc. complete Km 0/0-0/262
Earth Work Excavataion and depositing on back with an initial of 10m and lift 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20A Km 0/0-0/262
Providing and Laying Red Gravel for soling & for side berms to 75mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Primer coat over the WMM surface using 7.00 Kg of bituminous emulsion SS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying tack coat over the primed WMM surface using 2.50 Kg of bituminous emulsion RS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing HM stones of size 0.75 x 0.23 x 0.10
Strenthening of Vengataramanujapuram road 0/0-0/4 @ Vengataramanujapuram Panchayat in Udankudi Block under SCPAR - 2019-20 Package No.03
Clearing and scrubbling by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300 mm girth. Km 0/0-0/355
Picking the existing B.T.Surface including all labour charges etc. complete Km 0/0-0/355
Earth Work Excavataion and depositing on back with an initial of 10m and lift 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20A Km 0/0-0/355
Providing and Laying Red Gravel for soling & for side berms to 75mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Primer coat over the WMM surface using 7.00 Kg of bituminous emulsion SS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying tack coat over the primed WMM surface using 2.50 Kg of bituminous emulsion RS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing HM stones of size 0.75 x 0.23 x 0.10
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
THEJA STAG
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .