| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹23.0 LAdmitted-Fee/PreQual/Technical/Finance 233 VILLAGE SADOPUR VILL SADOPUR POST DHOOM MANIKPUR G NOIDA DADRI GAUTAM BUDDHA NAGAR UTTAR PRADESH 203207 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 203207 | -7.48% | ₹23.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹28.6 L+₹5.6 L (24.3%)Admitted-Fee/PreQual/Technical/Finance | +15.00% | ₹28.6 L+₹5.6 L (24.3%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹29.6 L+₹6.5 L (28.4%)Admitted-Fee/PreQual/Technical/Finance | +18.81% | ₹29.6 L+₹6.5 L (28.4%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Fee not submitted |
Tender Value
₹24.9 L
EMD Value
₹50,000
Closing Date
28 May 2026, 5:00 pmClosed
EO
NAGAR PALIKA LOSAL
WORK NO 02
2026_DLB_560731_2
462
Open Tender
Civil Works
Percentage
120 days
NP LOSAL
REGISTERED FIRM
2 documents required · 2 mandatory
₹500
AS PER TENDER DOCUMENT
₹50,000
Yes
24 Jul 2026
20 May 2026
1 Jun 2026
20 May 2026
28 May 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Work | |||||
| 1.01 | Dressing of earth work in surface excavation including cutting and
filling upto 30cm depth including disposal of excavated earth upto
50m and lift upto 1.5 m. | 4,500 | cum | 41 | ₹1,84,500 |
| 1.02 | Carriage of Materials by mechanical transport including loading unloading and stacking Stone, boulders,gravelly material | 300 | cum | 197.03 | ₹59,109 |
| 1.03 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer. | - | - | - | - |
| 1.04 | Bituminous courses | 187.5 | cum | 445 | ₹83,437.5 |
| 1.05 | Granular courses | 281.25 | cum | 310 | ₹87,187.5 |
| 1.06 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301 In all type of soil | 675 | cum | 235.5 | ₹1,58,962.5 |
| 1.07 | Providing, laying and spreading of granular sub-base by providing coarse graded Material (Table 400-2), spreading in uniform layers with motor grader on prepared surface, mixing BY MIX IN PLACE METHOD with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRT&H specification clause - 401 including all material, labour, machinery lighting, guarding and maintenance of diversion Grading - III Material | 450 | cum | 1,106 | ₹4,97,700 |
| 1.08 | Providing, laying, spreading (with paver finisher only) and compacting wet mix macadam (WMM) base course comprising of graded stone aggregate and granular material conforming to MORT&H specifications (Table 400-II) in layers of equal compacted thickness each consolidated, including pre-mixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tippers to site, laying in uniform layers in base course on a well prepared sub-base/ base course and compacting with power vibratory-roller to achieve the desired density complete as per MoRT&H specification clause - 406 including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 281.25 | cum | 1,775 | ₹4,99,218.75 |
| 1.09 | Providing and applying primer coat over prepared surface of granular base with bitumen emulsion as per IS : 8887 and approved quality @ 0.6 kg/sqm with the help of spray set fitted on bitumen Container (boiler) after cleaning the surface including removing of binding material and other foreign matter with wire brushes and small picks, sweeping with brooms or soft brushes and finally dusting with old gunny bags and compressed air to receive bituminous treatment complete as per clause 502 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 4,312.5 | sqm | 33.7 | ₹1,45,331.25 |
stage.html
html • 0.02 MB
finance_998043.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
Tendernotice_2.pdf
PDF • 0.18 MB
BOQ_998043.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .