Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.9 CrAccepted-AOC PLOT NO 143 IIFL TOWERS 1ST FLOOR M G R SALAI PERUNGUDI CHENNAI 600 096 | CHENNAI | CHENNAI | TAMIL NADU | 600096 | ₹14.9 Cr Quoted ₹15.3 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹23.1 CrRejected-AOC | ₹23.1 Cr | L2 | Rejected-AOC Rejected |
| 3 | Rejected-Technical BHARAT SANCHAR NIGAM LIMITED BHARAT SANCHAR BHAWAN HARISH CHANDER MATHUR LANE JANPATH NEW DELHI DELHI 110001 | NEW DELHI | DELHI | 110001 | - | - | Rejected-Technical Rejected |
| 4 | Rejected-Technical 3B MARBLE ARCH 5 BISHOP WALLERS AVENUE CIT COLONY MYLAPORE CHENNAI 600 004 | CHENNAI | TAMIL NADU | 600004 | - | - | Rejected-Technical Rejected |
Tender Value
Refer Docs
EMD Value
₹32 L
Closing Date
8 Jan 2024, 3:00 pmClosed
Managing Director
CMDA Tower II, 5th floor, Egmore
Supply and installation of IP CCTV Cameras
2023_TASMA_394569_2
Q8/5201/2023
Open Tender
Electronics Equipment
180 days
CMDA Tower II
refer tender documents
22 documents required · 22 mandatory
₹0
₹32 L
Yes
7 Aug 2024
3 Jan 2024
8 Jan 2024
3 Jan 2024
8 Jan 2024
3 Jan 2024
Amount
For TASMAC Outlets
50 Mtrs or Higher IP IR Camera with 4G SIM Module and 128 GB Memory Card slot
128 GB Memory Card
1000 VA Inverter/UPS/ 100 AH battery with minimum 12 hours power backup
Cables, conduits and other necessary accessories for connecting and ensuring stable power supply
Installation Charges
TOTAL COST (A)
Cost Per Meter for cables Conduits and other necessary accessories for connecting and ensuring stable power supply (for any additional requirements incase of Shop Relocation etc)*** *** Will not be considered for calculation of Total Cost for arriving at L1 Rate.
For District Monitoring Centre
128 Channel HD NVR with 8 SATA HDD each SATA support upto 8TB
8TB Hard Disk
TOTAL COST (B)
Cost Per Meter for cables Conduits and other necessary accessories for connecting and ensuring stable power supply (for any additional requirements incase of Shop Relocation etc) ****** Will not be considered for calculation of Total Cost for arriving at L1 Rate.
Network Connectivity Per Annum
TASMAC Retail Vending Outlet
4G /3G SIM Card- unlimited data plan and yearly subscription with Minimum upload speed of 1 MBPS across all shops in the state-IP V6
District Monitoring Centre at District Level
25 Mbps Internet Line Link with Router
TOTAL COST Per Annum
TOTAL COST for 5 years (C)
GRAND TOTAL COST D = (A+B+C)
Sobha Renaissance Information Technology Private Limited
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid