Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹47.4 LAccepted-AOC H NO 53 A VIVEKA PUBMIC SCHOOL PASUPATI NAGAR KIDWAI NAGAR KANPUR NAGAR UP KANPUR NAGAR UTTAR PRADESH 208011 | KANPUR NAGAR | UTTAR PRADESH | 208011 | 1 | Accepted-AOC lowest bid | |
| 2 | 2₹47.4 L+₹4,740.64 (0.10%)Rejected-Finance 00 KHRAUTI RAMPUR BASTI BASTI UTTAR PRADESH 272124 | BASTI | UTTAR PRADESH | 272124 | 2 | Rejected-Finance highest bid | |
| 3 | 3₹47.4 L+₹9,102.02 (0.19%)Rejected-Finance B 126 SWARAN JAYANTI VISTAR SANIGAWAN KANPUR | 3 | Rejected-Finance highest bid |
Tender Value
Refer Docs
EMD Value
₹4.7 L
Closing Date
24 Jun 2026, 10:00 amClosed
EO SHIVRAJPUR
OFC NP SHIVRAJPUR
WARD NO-02 NEAR SHAHID SMARAK PARK
2026_DOLBU_1158908_2
118/NPS/VANDAN/2026-27
Open Tender
Civil Works
Percentage
180 days
SIVRAJPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
EO
₹4.7 L
30 Jun 2026
11 Jun 2026
24 Jun 2026
11 Jun 2026
24 Jun 2026
11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in surface excavation not exceeding 30 Cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50m and lift upto 1.5m, as directed by Engineer in Charge | 1 | Sqm | - | - |
| 2 | Plain cement concrete 1:4:8 nominal mix in foundation with crushed stone aggregate 40 mm nominal size | 1 | Cum | - | - |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement. All work up to plinth level Fotting 1:1:5:3 | 1 | Cum | - | - |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement. All work up to plinth Beam 1:1:5:3 | - | Cum | - | - |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement. All work up to plinth level Column1:1:5:3 | 1 | Cum | - | - |
| 6 | Steel reinfocement for R.C.C. work including straightening, cutting, bending, placing, in position and binding all complete upto plinth level. | - | Qtl | - | - |
| 7 | Centering and shuttering including strutting propping etc and removal form work footing | - | Sqm | - | - |
| 8 | Centering and shuttering including strutting propping etc and removal form work Beam | - | Sqm | - | - |
| 9 | Centering and shuttering including strutting propping etc and removal form work Column | 1 | Sqm | - | - |
| 10 | Brick Work with common burnt clay brick of class 150 in plinth foundation in all shapes and size cement mortar 1:4 | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_2172052.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .