| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.2 LAccepted-AOC S A 6 149 D 3 SHIV BIHAR COLONY AKTHA PAHADIYA VARANASI | AMBEDKAR NAGAR | UTTAR PRADESH | 224122 | L1 | Accepted-AOC First Lowest | |
| 2 | L2₹45.2 L+₹92,560.45 (2.09%)Rejected-AOC | L2 | Rejected-AOC Second Lowest | |
| 3 | Not Admitted-Fee/PreQual/Technical CHANDAULI UP UTTAR PRADESH | CHANDAULI | UTTAR PRADESH | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
12 Jun 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
S.E. Irrigation Works Circle Varanasi
S.E. Irrigation Works Circle Sigra Varanasi
Construction of Sarne Minor from Km. 3.200 to Km. 3.995 with all Pucca work.
2023_UPIDC_808730_1
1/SE/2023-24
Open Tender
Civil Works
Item Rate
60 days
Vill Sarne Post Niyamtabad Chandauli
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.2 L
5 Sept 2023
5 Jun 2023
12 Jun 2023
5 Jun 2023
12 Jun 2023
5 Jun 2023
Amount
Earth work in foundation in all type of soil mixed with charry,karail , black cotton soil or moorum including all lead & lifts T&P and disposal of surplus earth as direction of Engineer-in-charge up to a distance of 100m from the foundation trenches for proper complation of work.
P/L C.C. 1:3:6 in foundation one part of cement , three part of coarse sand and six part of stone ballast 20 to 40 mm size including cost of all materials, labour, T&P etc required for proper completion of work .
First class brick work in 1:4 C.M. with one part of cement and four part of coarse sand including cost of all materials, labour, T&P etc required for proper completion of work.
Centering and shuttering for R.C.C. and C.C. work including cost of all materials, labour, T&P etc required for proper completion of work .
Bending, Binding, Cutting and placing in position steel reinforecement including cost of all materials, labour, T&P etc required for proper completion of work.
P/F expansion joint filler board 18mm thick including all cost of material, labour , T&P etc complete required for proper completion of work .
P/L R. C.C. 1:1.5:3 in slab with one part of cement , one & half part of coarse sand and three part of hard stone grit 4.75 to 20mm size including cost of all materials, labour, T&P etc required for proper completion of work.
P/L C.C. 1:1.5:3 in wearing coat over slab with one part of cement , one half part of coarse sand and three part of hard stone grit 4.75 to 10 mm size including cost of all materials, labour, T&P etc required for proper completion of work.
Deep ruled cement pointing in 1:2 C.M. one part of cement and two part of coarse sand including cost of all materials, labour, T&P etc required for proper completion of work.
Earth work in canal, road diversion and ramp etc with all lead and all lift , proper manual compaction and dressing , watering , including labour , T&P etc complete required for proper completion of work .
P/F wheel gaurd of stone as per direction of engineer in-charge including cost of all materials, labour, T&P etc required for proper completion of work.
First class brick pitching on edge over road ramp, diversion filling joint with local sand including all cost of materials, labour T&P etc. complete required for proper completion of work
Painting parapet of V.R.B. with water proofing cement paints of approved quality in required shed on new wall surface two coat over one coat of white cement primer to give an even shade after thoroughly brushing the surface to remove powdered material including cost of all material.
Earth work in Canal with manual compaction & dressing including all lead and lift, labour charges T&P etc.
Laying and fixing .R.C.C Out let 150 mm dia. including cost of all materials, labour, T&P etc required for proper completion of work.
M/S AWADH CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .